Skip to main content

Geothermal Piping Systems Get into the Groove

How do you design outdoor piping to account for changing elevation, uneven terrain, seismic and thermal movement, and the reroutes required of a drilling fluid system? This was the challenge faced by engineers and contractors for Indonesia's largest geothermal power plant, Wayang Windu. The pipe-joining method would need to offer flexibility and superior maintainability, and project personnel sought a method that would not be susceptible to inclement weather or pose undue safety hazards. Welding and flanging couldn't meet those parameters, but a solution was found in grooved mechanical piping.

How do you design outdoor piping to account for changing elevation, uneven terrain, seismic and thermal movement, and the reroutes required of a drilling fluid system? This was the challenge faced by engineers and contractors for Indonesia's largest geothermal power plant, Wayang Windu. The pipe-joining method would need to offer flexibility and superior maintainability, and project personnel sought a method that would not be susceptible to inclement weather or pose undue safety hazards. Welding and flanging couldn't meet those parameters, but a solution was found in grooved mechanical piping.

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.