Record cash margin and adjusted EBITDA and second highest revenue in 130-year history
Hecla Mining Company (NYSE:HL) (Hecla or the Company) today announced first quarter 2021 financial and operating results.
HIGHLIGHTS
- Sales of $210.9 million, second highest in the 130-year history, a 54% increase over prior year.
- Gross profit of $64.8 million, an increase of $53.4 million over prior year.
- Cash provided by operating activities of $37.9 million and $16.5 million of quarterly free cash flow1.
- Silver production of 3.5 million ounces, a 7% increase over prior year period.
- Net income applicable to common shareholders of $18.8 million, or $0.04 per share (basic).
- Adjusted net income applicable to common stockholders of $30.6 million, or $0.06 per share.2
- Record Adjusted EBITDA of $86.1 million; net debt/adjusted EBITDA (last 12 months) of 1.4x.4
- Strong liquidity with quarter-end cash position of $139.8 million and undrawn revolving credit facility.
- Increased the silver -linked dividend at the $25 per ounce silver price threshold by 50% to $0.03 annually. Board has also increased each level of the silver-linked dividend by $0.01 per year.
- Greens Creek AISC6 in the first quarter of $1.59 per silver ounce and a new estimate for the year of less than $7.25.
- Ratings upgrade from Moody's with Corporate Family Rating (CFR) upgraded to B2 from B3.
- Continued safe management of COVID-19 across all our operations.
- Sustainability report outlining our 2020 ESG performance and exploration results to be released in conjunction with the Company's Annual Meeting of Shareholders on May 19, 2021.
"The strong performance Hecla has had in five of the last six quarters continued in the first quarter of 2021 with the second highest sales in our history, a new record for EBITDA and gross profit on sales that is about a third higher than the next closest quarter," said Phillips S. Baker, Jr., President and CEO. "Free cash flow generation was the most Hecla has had in the first quarter in a decade. Since the first quarter is typically our smallest quarter, we anticipate cash flow increasing over the rest of the year. Therefore, the Board has increased the silver-linked dividend at the $25 price threshold by 50% to $0.03 per share annually."
Mr. Baker continued, "The backdrop for silver remains very positive with improving industrial demand due to global policies that support green energy where silver is a key component, strong investment demand and tight supply. Hecla is in a key position as the United States' largest silver producer, mining more than a third of all U.S. production, which should increase as our U.S. silver production is anticipated to be 15 million ounces by 2023 with the Lucky Friday's silver production expected to increase to 5 million ounces by then."
FINANCIAL OVERVIEW
|
First Quarter Ended |
|||||
HIGHLIGHTS |
March 31, 2021 |
March 31, 2020 |
||||
FINANCIAL DATA (000s except per share) |
|
|
||||
Sales (000) |
$ |
210,852 |
|
$ |
136,925 |
|
Gross profit (000) |
$ |
64,812 |
|
$ |
11,372 |
|
Income (loss) applicable to common stockholders (000) |
$ |
18,833 |
|
$ |
(17,323) |
|
Basic income (loss) per common share |
$ |
0.04 |
|
$ |
(0.03) |
|
Diluted income (loss) per common share |
$ |
0.03 |
|
$ |
(0.03) |
|
Cash provided by operating activities (000) |
$ |
37,936 |
|
$ |
4,927 |
|
Income applicable to common shareholders for the first quarter was $18.8 million, or $0.04 per share, compared to a loss of $17.3 million, or ($0.03 per share), in the first quarter of 2020, and was impacted by the following factors:
- Gross profit increased by $53.4 million due primarily to higher metal prices and production of silver, lead, and zinc. Production increased due to higher grades and Lucky Friday being in full production. Profit also improved due to lower treatment charges at Greens Creek. Casa Berardi also contributed with strong gold production from higher grades, recovery, and improved throughput in the current period.
- Ramp-up and suspension costs decreased by $8.7 million primarily due to Lucky Friday's return to full production in the fourth quarter of 2020.
- Lower interest expense by $5.6 million due to the following items in the first quarter of 2020: (i) interest recognized on both the 7.25% Senior Notes due 2028 and since-redeemed 2021 Notes for an overlapping period, (ii) $1.7 million in unamortized initial purchaser discount on the 2021 Notes recognized as expense upon their redemption, and (iii) amounts drawn on our revolving credit facility.
- Provision for closed operations and environmental matters increased by $3.2 million due to an increase at an historic site.
- Exploration and pre-development expense increased by $3.6 million. In the first quarter of 2021, exploration was primarily at our San Sebastian, Casa Berardi and Nevada Operations units.
- Higher other operating expense by $2.7 million due to operational improvement project costs at Casa Berardi.
- A gain on metal derivatives contracts of $0.5 million compared to a gain of $7.9 million in the first quarter of 2020.
- A net foreign exchange loss of $2.1 million versus a net gain of $6.6 million in the first quarter of 2020, with the variance primarily related to the impact of strengthening of the Canadian dollar relative to the U.S. dollar.
- An income and mining tax provision of $4.6 million compared to an income and mining tax benefit of $1.1 million in the first quarter of 2020 due to increased income at Casa Berardi and the inclusion of $3.1 million following reclassification of the Alaska mine license tax. Cash income and mining taxes paid for the first quarter totaled $2.5 million.
Cash provided by operating activities of $37.9 million increased $33.0 million compared to the first quarter of 2020, primarily due to higher gross profit, partially offset by negative working capital changes of $29.3 million related to lower accounts payable and accrued liabilities, the timing of payment of incentive compensation related to prior-year performance and higher accounts receivable due to the timing of concentrate shipments.
Adjusted EBITDA3 of $86.1 million increased 145% compared to the first quarter of 2020, primarily due to higher sales partially offset by lower gross margins at Nevada and San Sebastian. Adjusted EBITDA is $12 million more than any quarter in Hecla's history.
Capital expenditures totaled $24.7 million compared to $20.0 million in the first quarter of 2020, with the increase primarily due to spending at Lucky Friday and Casa Berardi. Capital expenditures during the first quarter of 2021 at Casa Berardi, Greens Creek, Lucky Friday, and Nevada operations were $13.8 million, $4.9 million, $5.9 million, and $0.1 million, respectively.
Metals Prices
|
|
Three Months Ended March 31 |
||||||
|
|
2021 |
|
2020 |
||||
AVERAGE METAL PRICES |
|
|
|
|||||
Silver - |
London PM Fix ($/oz) |
$ |
26.29 |
|
|
$ |
16.94 |
|
|
Realized price per ounce |
$ |
25.66 |
|
|
$ |
14.48 |
|
Gold - |
London PM Fix ($/oz) |
$ |
1,798 |
|
|
$ |
1,583 |
|
|
Realized price per ounce |
$ |
1,770 |
|
|
$ |
1,588 |
|
Lead - |
LME Cash ($/pound) |
$ |
0.92 |
|
|
$ |
0.84 |
|
|
Realized price per pound |
$ |
0.92 |
|
|
$ |
0.78 |
|
Zinc - |
LME Cash ($/pound) |
$ |
1.25 |
|
|
$ |
0.96 |
|
|
Realized price per pound |
$ |
1.32 |
|
|
$ |
0.88 |
|
∗ Realized prices are calculated by dividing gross revenues for each metal (which include the price adjustments and gains and losses on the forward contracts discussed below) by the payable quantities of each metal included in products sold during the period.
Base Metals Forward Sales Contracts
The following table summarizes the quantities of base metals committed under financially settled forward sales contracts, other than provisional hedges (which address changes in prices between shipment and settlement with customers), at March 31, 2021.
|
Pounds Under Contract (in thousands) |
|
Average Price per Pound |
|||
|
Zinc |
Lead |
|
Zinc |
Lead |
|
Contracts on forecasted sales |
|
|
|
|
|
|
2021 settlements |
33,841 |
30,479 |
|
$ 1.20 |
$ 0.89 |
|
|
|
|
|
|
|
|
2022 settlements |
53,407 |
42,715 |
|
$ 1.26 |
$0.96 |
|
|
|
|
|
|
|
|
2023 settlements |
41,171 |
— |
|
$ 1.27 |
— |
The contracts represent 46% of the forecasted payable zinc production for the next three years at an average price of $1.25 per pound, and 45% of the forecasted payable lead production for the next two years at an average price of $0.93 per pound.
Foreign Currency Forward Purchase Contracts
The following table summarizes the Canadian dollars the Company has committed to purchase under foreign exchange forward contracts at March 31, 2021:
|
Currency Under Contract
|
|
Average Exchange Rate |
||
|
CAD |
|
CAD/USD |
||
2021 settlements |
|
93,026 |
|
|
1.32 |
|
|
|
|
|
|
2022 settlements |
|
84,754 |
|
|
1.31 |
|
|
|
|
|
|
2023 settlements |
|
52,565 |
|
|
1.32 |
|
|
|
|
|
|
2024 settlements |
|
26,446 |
|
|
1.33 |
OPERATIONS OVERVIEW
The following table provides the production summary on a consolidated basis:
|
|
First Quarter Ended |
|||
|
|
March 31, 2021 |
March 31, 2020 |
||
PRODUCTION SUMMARY |
|
||||
Silver - |
Ounces produced |
3,459,446 |
|
3,245,469 |
|
|
Payable ounces sold |
3,030,026 |
|
2,582,279 |
|
Gold - |
Ounces produced |
52,004 |
|
58,792 |
|
|
Payable ounces sold |
57,286 |
|
57,103 |
|
Lead - |
Tons produced |
10,704 |
|
5,893 |
|
|
Payable tons sold |
8,668 |
|
4,130 |
|
Zinc - |
Tons produced |
16,107 |
|
12,847 |
|
|
Payable tons sold |
11,027 |
|
9,836 |
|
The following table provides a summary of the production, cost of sales and other direct production costs and depreciation, depletion and amortization (referred to herein as "cost of sales"), cash cost, after by-product credits ("cash cost"), per silver or gold ounce, and All In Sustaining Cost, after by-product credits ("AISC"), per silver or gold ounce, for the quarters ended March 31, 2021 and 2020.
First Quarter Ended March 31, 2021 |
|
|
|
Greens Creek |
Lucky
|
San Sebastian |
Casa Berardi |
Nevada
|
||||||||||||||||||||||||||||
Silver |
|
Gold |
Silver |
|
Gold |
Silver |
Silver |
|
Gold |
Gold |
|
Silver |
Gold |
|
Silver |
|||||||||||||||||||||
Production (ounces) |
3,459,446 |
|
|
52,004 |
|
2,584,870 |
|
|
13,266 |
|
863,901 |
|
— |
|
|
— |
|
36,190 |
|
|
10,675 |
|
2,548 |
|
|
— |
|
|||||||||
Increase/(decrease) |
7 |
% |
|
(12) |
% |
(7) |
% |
|
8 |
% |
802 |
% |
(100) |
% |
|
(100) |
% |
35 |
% |
|
80 |
% |
(85) |
% |
|
(100) |
% |
|||||||||
Cost of sales (000) |
$ |
76,069 |
|
|
$ |
69,971 |
|
$ |
53,181 |
|
|
$ |
— |
|
$ |
22,794 |
|
$ |
94 |
|
|
- |
$ |
62,516 |
|
|
$ |
— |
|
$ |
7,455 |
|
|
- |
||
Increase/(decrease) |
26 |
% |
|
7 |
% |
8 |
% |
|
N/A |
705 |
% |
(99) |
% |
|
N/A |
29 |
% |
|
N/A |
(56) |
% |
|
N/A |
|||||||||||||
Cash cost per silver or gold ounce 5 |
$ |
1.40 |
|
|
$ |
1,052 |
|
$ |
(0.67) |
|
|
- |
$ |
7.62 |
|
N/A |
|
- |
$ |
1,027 |
|
|
- |
$ |
1,416 |
|
|
- |
||||||||
Increase/(decrease) |
(76) |
% |
|
(1) |
% |
(112) |
% |
|
N/A |
N/A |
(100) |
% |
|
N/A |
(19) |
% |
|
N/A |
92 |
% |
|
N/A |
||||||||||||||
AISC per silver or gold ounce6 |
$ |
7.21 |
|
|
$ |
1,284 |
|
$ |
1.59 |
|
|
- |
$14.24 |
N/A |
|
- |
1,272 |
|
|
- |
$ |
1,461 |
|
|
- |
|||||||||||
Increase/(decrease) |
(35) |
% |
|
(1) |
% |
(80) |
% |
|
N/A |
N/A |
(100) |
% |
|
N/A |
(21) |
% |
|
N/A |
81 |
% |
|
N/A |
Greens Creek Mine - Alaska
Greens Creek continued its strong performance with slightly lower silver grades due to normal variations in the ore body and produced 2.6 million ounces of silver and 13,266 ounces of gold compared to 2.8 million ounces of silver and 12,273 ounces of gold in the first quarter of 2020. The decrease in silver production was primarily due to lower grade, with the increase in gold production resulting from higher grade, as planned. Compared to 2020, cost per ounce decreased primarily due to $5.7 million in lower treatment costs as a result of favorable smelter terms, of which $4 million are nonrecurring, and the reclassification of the Alaska mine license tax to income and mining tax provision effective January 1, 2021. With higher by-product prices, the cash cost5 and AISC6, after by-product credits, per silver ounce decreased by $6.30 and $6.31 per ounce, respectively. The mill operated at an average of 2,156 tons per day (tpd) in the first quarter compared to 2,185 tpd in the first quarter of 2020.
The Company reaffirms estimated 2021 silver production of 9.5 - 10.2 million ounces of silver and 40 - 43 thousand ounces of gold. The estimate for 2021 cost of sales is $213 million. Estimated cash cost, after by-product credits5, and AISC, after by-product credits6, each per silver ounce is $1.50-$2.25 and $6.50-$7.25, respectively, with lower costs due to anticipated higher by-product credits, lower treatment charges, and the reclassification of mine license tax from production costs to income and mining tax provision effective January 1, 2021.
Casa Berardi Mine - Quebec
At the Casa Berardi Mine, 36,190 ounces of gold were produced compared to 26,752 ounces in the first quarter of 2020. This represents an increase of 35% due to higher tonnage, grades and recoveries. The mill operated at an average of 4,093 tpd in the first quarter of 2021 compared to 3,644 tpd in 2020. The increase in cost of sales was primarily due to higher sales volume. The decrease in cash cost and AISC, after by-product credits5,6, per gold ounce for the first quarter of 2021 compared to the first quarter of 2020 was primarily the result of higher gold production, with AISC also impacted by lower sustaining capital spending, partially offset by higher exploration spending.
Business improvement activities continued in 2021 and these efforts are expected to reduce costs and increase cash flow over the next two years.
Lucky Friday Mine - Idaho
At the Lucky Friday Mine, 0.9 million ounces of silver were produced in the first quarter of 2021. Lucky Friday returned to full production in the fourth quarter of 2020 with estimated annual production in excess of 3.4 million ounces of silver in 2021. The mill operated at an average of 901 tpd. We continue to test and optimize the new mining method to improve safety and increase productivity which could allow Lucky Friday to increase production beyond the 5 million ounces expected by 2023 due to grade.
The cost of sales for the first quarter was $22.8 million, and the cash cost, after by-product credits, per silver ounce5 was $7.62. AISC6, after by-product credits, was $14.24 per silver ounce.
Nevada Operations
At the Nevada operations, 2,548 ounces of gold were produced from 16,459 tons of a stockpiled bulk sample of refractory material processed at a third-party facility. Cost of sales for the first quarter were $7.5 million and cash cost5 and AISC6, after by-product credits, per gold ounce was $1,416 and $1,461, respectively in the first quarter of 2021. The increase over the prior year period was the result of the lower gold production.
In the second quarter of 2021, the Company expects to process oxide material through the Midas mill. Over the remainder of the year, 22,000 tons of refractory material are expected to be processed in third-party facilities, roughly 12,000 tons in a roaster and 10,000 tons in an autoclave. Production for the remainder of the year is expected to be in the range of 17,000 to 19,000 ounces of gold. Fire Creek and the Midas mill are expected to be on care and maintenance by the end of the second quarter. Activities will be limited primarily to development at Hollister for Hatter Graben and exploration at Midas.
PRE-DEVELOPMENT
Pre-development spending was $0.7 million for the quarter, principally in connection with permitting of Rock Creek and Montanore. The Federal District Court's recent ruling set aside the U.S. Forest Service's 2018 Record of Decision and the U.S. Fish & Wildlife Service's 2019 Supplement to the Biological Opinion for the evaluation phase of the Rock Creek project. While we await action by the Federal agencies on possible appeal of this decision, the Company will reconsider its evaluation plan for the Rock Creek project and continue to advance the Montanore evaluation project.
At Hollister, development of the decline to allow drilling of the Hatter Graben has commenced. The pre-development cost in 2021 is expected to be about $4 million.
2021 ESTIMATES7
The Company has updated its guidance for annual production, cost and expenditures as follows:
2021 Production Outlook
|
Silver Production (Moz) |
Gold Production (Koz) |
Silver Equivalent (Moz) |
Gold Equivalent (Koz) |
Greens Creek * |
9.5-10.2 |
40-43 |
20.5-21.5 |
227-237 |
Lucky Friday * |
3.4-3.8 |
N/A |
6.2-6.4 |
67-70 |
Casa Berardi |
N/A |
125-128 |
11.5-11.7 |
125-128 |
Nevada Operations |
N/A |
20-22 |
1.8-2.0 |
20-22 |
2021 Total |
12.9-14.0 |
185-193 |
40.0-41.6 |
439-457 |
2022 Total |
13.7-14.5 |
173-181 |
41.0-42.5 |
448-465 |
2023 Total |
14.2-15.0 |
177-186 |
42.5-44.5 |
467-485 |
* Equivalent ounces include Lead and Zinc production
2021 Cost Outlook
|
Cost of Sales
|
Cash cost, after by-product
|
AISC, after by-product credits,
|
|||
|
Original
|
Current |
Original |
Current |
Original |
Current |
Greens Creek |
$220 |
$213 |
$5.75-$6.25 |
$1.50-$2.25 |
$10.25-$11.00 |
$6.50-$7.25 |
Lucky Friday |
$91 |
$91 |
$7.75-$9.75 |
$7.75-$9.75 |
$13.75-$16.50 |
$13.75-$16.50 |
Total Silver |
$311 |
$304 |
$6.25-$7.25 |
$3.25-$4.25 |
$13.50-$15.00 |
$10.75-$12.50 |
Casa Berardi |
$176 |
$212 |
$900-$975 |
$900-$975 |
$1,185-$1,275 |
$1,185-$1,275 |
Nevada Operations |
$41 |
$41 |
$1,300-$1,425 |
$1,300-$1,425 |
$1,385-$1,525 |
$1,385-$1,525 |
Total Gold |
$217 |
$253 |
$950-$1,050 |
$950-$1,050 |
$1,200-$1,300 |
$1,200-$1,300 |
2021 Capital and Exploration Outlook
|
(millions) |
|
|
Original
|
Current |
Capital expenditures |
$110 |
$110 |
Exploration expenditures (including Corporate Development) |
$30 |
$30 |
Pre-development expenditures |
$4.5 |
$8.5 |
CONFERENCE CALL AND WEBCAST
A conference call and webcast will be held Thursday, May 6, at 10:00 a.m. Eastern Time to discuss these results. You may join the conference call by dialing toll-free 1-833-350-1380 or for international dialing 1-647-689-6934. The Conference ID is 7584113. Please dial-in and provide the Conference ID number at least 10 minutes prior to the start time to join the call and mitigate any hold times.
Hecla's live and archived webcast can be accessed at www.hecla-mining.com under Investors/Events & Webcasts (https://ir.hecla-mining.com/news-events/events-webcasts/default.aspx). The webcast will also be archived on the site.
ABOUT HECLA
Founded in 1891, Hecla Mining Company (NYSE:HL) is the largest U.S. silver producer with operating mines in Alaska and Idaho and is a growing gold producer with an operating mine in Quebec, Canada. The Company also has exploration and pre-development properties in seven world-class silver and gold mining districts throughout North America.
NOTES
Non-GAAP Financial Measures
Non-GAAP financial measures are intended to provide additional information only and do not have any standard meaning prescribed by generally accepted accounting principles in the United States (GAAP). These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP.
(1) Free cash flow is a non-GAAP measure calculated as cash provided by operating activities less additions to properties, plants and equipment.
(2) Adjusted net income (loss) applicable to common stockholders is a non-GAAP measurement, a reconciliation of which to net income (loss) applicable to common stockholders, the most comparable GAAP measure, can be found at the end of the release. Adjusted net income (loss) is a measure used by management to evaluate the Company's operating performance but should not be considered an alternative to net income (loss) as defined by GAAP. They exclude certain impacts which are of a nature which we believe are not reflective of our underlying performance. Management believes that adjusted net income (loss) per common share provides investors with the ability to better evaluate our underlying operating performance.
(3) Adjusted EBITDA is a non-GAAP measurement, a reconciliation of which to net income (loss), the most comparable GAAP measure, can be found at the end of the release. Adjusted EBITDA is a measure used by management to evaluate the Company's operating performance but should not be considered an alternative to net income (loss), or cash provided by operating activities as those terms are defined by GAAP, and does not necessarily indicate whether cash flows will be sufficient to fund cash needs. In addition, the Company may use it when formulating performance goals and targets under its incentive program.
(4) Net debt to adjusted EBITDA is a non-GAAP measurement, a reconciliation of adjusted EBITDA and net debt to the closest GAAP measurements of net income (loss) and debt can be found at the end of the release. It is an important measure for management to measure relative indebtedness and the ability to service the debt relative to its peers. It is calculated as total debt outstanding less total cash on hand divided by adjusted EBITDA.
(5) Cash cost, after by-product credits, per silver or gold ounce is a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization (sometimes referred to as "cost of sales" in this release), can be found at the end of the release. It is an important operating statistic that management utilizes to measure each mine's operating performance. It also allows the benchmarking of performance of each mine versus those of our competitors. As a primary silver mining company, management also uses cash cost, after by-product credits, per silver ounce on an aggregate basis - aggregating the Greens Creek, Lucky Friday and San Sebastian mines - to compare performance with that of other primary silver mining companies. Gold, lead and zinc produced have been treated as by-product credits in calculating silver costs per ounce. With regard to Casa Berardi and Nevada Operations, management uses cash cost, after by-product credits, per gold ounce to compare its performance with other gold mines with a by-product credit recognized for the value of their silver production. Similarly, the statistic is useful in identifying acquisition and investment opportunities as it provides a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics. In addition, the Company may use it when formulating performance goals and targets under its incentive program.
(6) All in sustaining cost (AISC), after by-product credits, is a non-GAAP measurement, a reconciliation of which to cost of sales and other direct production costs and depreciation, depletion and amortization, the closest GAAP measurement, can be found in the end of the release. AISC, after by-product credits, includes cost of sales and other direct production costs, expenses for reclamation and exploration at the mine sites, corporate exploration related to sustaining operations, and all site sustaining capital costs. AISC, after by-product credits, is calculated net of depreciation, depletion, and amortization and by-product credits.
Current GAAP measures used in the mining industry, such as cost of goods sold, do not capture all the expenditures incurred to discover, develop and sustain silver and gold production. Management believes that AISC is a non-GAAP measure that provides additional information to management, investors and analysts to help in the understanding of the economics of our operations and performance compared to other producers and in the investor's visibility by better defining the total costs associated with production. Similarly, the statistic is useful in identifying acquisition and investment opportunities as it provides a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics. In addition, the Company may use it when formulating performance goals and targets under its incentive program.
Other
(7) Calculations for 2021 include silver, gold, lead and zinc production from Greens Creek, San Sebastian, Casa Berardi and Nevada Operations converted using Au $1,525/oz, Ag $17/oz, Zn $1.00/lb, and Pb $0.85/lb.
Numbers may be rounded.
Cautionary Statements to Investors on Forward-Looking Statements
This news release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, which are intended to be covered by the safe harbor created by such sections and other applicable laws, including Canadian securities laws. When a forward-looking statement expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by the forward-looking statements. Forward-looking statements often address our expected future business and financial performance and financial condition and often contain words such as “anticipate,” “intend,” “plan,” “will,” “could,” “would,” “estimate,” “should,” “expect,” “believe,” “project,” “target,” “indicative,” “preliminary,” “potential” and similar expressions. Forward-looking statements in this news release may include, without limitation: (i) the Company will increase cash flow generation over the rest of the year; (ii) expected increase of the Company’s silver production to 15 million ounces by 2023; (iii) expected increase in Lucky Friday’s silver production to 5 million ounces by 2023; (iv) the new mining method being tested at Lucky Friday could improve safety and productivity at the mine beyond the 5 million ounces expected by 2023 due to grade; (v) Greens Creek estimates of full-year 2021 silver and gold production reaffirmed at 9.5 -10.2 million and 40-43 thousand, respectively, estimated 2021 cost of sales updated to $213 million, estimated cash costs, after by-product credits, and AISC, after by-product credits, each per silver ounce updated to $1.50 - $2.25 and $6.50 - $7.25, respectively; (vi) ability of business improvement activities at Casa Berardi to reduce costs and increase cash flow over the next two years; (vii) expectation of the Company to process 25,000 ore tons through the Midas mill and roughly 12,000 tons through a third-party roasting facility, and an additional 10,000 tons for processing at a third-party autoclave facility in the second half of the year with production in the range of 17,000 to 19,000 ounces of gold at the Nevada operations; and (viii) Company-wide estimates of future production, sales, costs of sales, cash costs, after by-product credits, AISC, after by-product credits, as well as estimated spending on capital, exploration and pre-development for 2021. The material factors or assumptions used to develop such forward-looking statements or forward-looking information include that the Company’s plans for development and production will proceed as expected and will not require revision as a result of risks or uncertainties, whether known, unknown or unanticipated, to which the Company’s operations are subject.
Estimates or expectations of future events or results are based upon certain assumptions, which may prove to be incorrect, which could cause actual results to differ from forward-looking statements. Such assumptions, include, but are not limited to: (i) there being no significant change to current geotechnical, metallurgical, hydrological and other physical conditions; (ii) permitting, development, operations and expansion of the Company’s projects being consistent with current expectations and mine plans; (iii) political/regulatory developments in any jurisdiction in which the Company operates being consistent with its current expectations; (iv) the exchange rate for the USD/CAD and USD/MXN, being approximately consistent with current levels; (v) certain price assumptions for gold, silver, lead and zinc; (vi) prices for key supplies being approximately consistent with current levels; (vii) the accuracy of our current mineral reserve and mineral resource estimates; (viii) the Company’s plans for development and production will proceed as expected and will not require revision as a result of risks or uncertainties, whether known, unknown or unanticipated; (ix) counterparties performing their obligations under hedging instruments and put option contracts; (x) sufficient workforce is available and trained to perform assigned tasks; (xi) weather patterns and rain/snowfall within normal seasonal ranges so as not to impact operations; (xii) relations with interested parties, including Native Americans, remain productive; (xiii) economic terms can be reached with third-party mill operators who have capacity to process our ore; (xiv) maintaining availability of water rights; (xv) factors do not arise that reduce available cash balances; and (xvi) there being no material increases in our current requirements to post or maintain reclamation and performance bonds or collateral related thereto.
In addition, material risks that could cause actual results to differ from forward-looking statements include, but are not limited to: (i) gold, silver and other metals price volatility; (ii) operating risks; (iii) currency fluctuations; (iv) increased production costs and variances in ore grade or recovery rates from those assumed in mining plans; (v) community relations; (vi) conflict resolution and outcome of projects or oppositions; (vii) litigation, political, regulatory, labor and environmental risks; (viii) exploration risks and results, including that mineral resources are not mineral reserves, they do not have demonstrated economic viability and there is no certainty that they can be upgraded to mineral reserves through continued exploration; (ix) the failure of counterparties to perform their obligations under hedging instruments; (x) we take a material impairment charge on our Nevada operations; (xi) we are unable to remain in compliance with all terms of the credit agreement in order to maintain continued access to the revolver, and (xii) we are unable to refinance the maturing senior notes. For a more detailed discussion of such risks and other factors, see the Company’s 2020 Form 10-K, filed on February 18, 2021, with the Securities and Exchange Commission (SEC), as well as the Company’s other SEC filings. The Company does not undertake any obligation to release publicly revisions to any “forward-looking statement,” including, without limitation, outlook, to reflect events or circumstances after the date of this news release or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. Investors should not assume that any lack of update to a previously issued “forward-looking statement” constitutes a reaffirmation of that statement. Continued reliance on “forward-looking statements” is at investors’ own risk.
HECLA MINING COMPANY Condensed Consolidated Statements of Operations (dollars and shares in thousands, except per share amounts - unaudited) |
||||||||||
|
|
Three Months Ended |
||||||||
|
|
March 31, 2021 |
|
March 31, 2020 |
||||||
Sales of products |
|
$ |
210,852 |
|
|
|
$ |
136,925 |
|
|
Cost of sales and other direct production costs |
|
96,709 |
|
|
|
85,887 |
|
|
||
Depreciation, depletion and amortization |
|
49,331 |
|
|
|
39,666 |
|
|
||
|
|
146,040 |
|
|
|
125,553 |
|
|
||
Gross profit |
|
64,812 |
|
|
|
11,372 |
|
|
||
|
|
|
|
|
||||||
Other operating expenses: |
|
|
|
|
||||||
General and administrative |
|
8,007 |
|
|
|
8,939 |
|
|
||
Exploration |
|
5,951 |
|
|
|
2,530 |
|
|
||
Pre-development |
|
739 |
|
|
|
535 |
|
|
||
Other operating expense |
|
3,639 |
|
|
|
920 |
|
|
||
Provision for closed operations and environmental matters |
|
3,709 |
|
|
|
516 |
|
|
||
Ramp-up and suspension costs |
|
4,318 |
|
|
|
12,996 |
|
|
||
|
|
26,363 |
|
|
|
26,436 |
|
|
||
Income (loss) from operations |
|
38,449 |
|
|
|
(15,064 |
) |
|
||
Other income (expense): |
|
|
|
|
||||||
Gain on derivative contracts |
|
473 |
|
|
|
7,893 |
|
|
||
Other expense |
|
(161 |
) |
|
|
(423 |
) |
|
||
Gain on exchange of investments |
|
1,158 |
|
|
|
— |
|
|
||
Unrealized loss on investments |
|
(3,506 |
) |
|
|
(978 |
) |
|
||
Net foreign exchange (loss) gain |
|
(2,064 |
) |
|
|
6,636 |
|
|
||
Interest expense |
|
(10,744 |
) |
|
|
(16,311 |
) |
|
||
|
|
(14,844 |
) |
|
|
(3,183 |
) |
|
||
Income (loss) before income and mining taxes |
|
23,605 |
|
|
|
(18,247 |
) |
|
||
Income and mining tax (provision) benefit |
|
(4,634 |
) |
|
|
1,062 |
|
|
||
Net income (loss) |
|
18,971 |
|
|
|
(17,185 |
) |
|
||
Preferred stock dividends |
|
(138 |
) |
|
|
(138 |
) |
|
||
Income (loss) applicable to common stockholders |
|
$ |
18,833 |
|
|
|
$ |
(17,323 |
) |
|
Basic earnings (loss) per common share after preferred dividends |
|
$ |
0.04 |
|
|
|
$ |
(0.03 |
) |
|
Diluted earnings (loss) per common share after preferred dividends |
|
$ |
0.03 |
|
|
|
$ |
(0.03 |
) |
|
Weighted average number of common shares outstanding - basic |
|
534,101 |
|
|
|
523,215 |
|
|
||
Weighted average number of common shares outstanding - diluted |
|
540,527 |
|
|
|
523,215 |
|
|
HECLA MINING COMPANY Condensed Consolidated Statements of Cash Flows (dollars in thousands - unaudited) |
||||||
|
Three Months Ended |
|||||
|
March 31, 2021 |
March 31, 2020 |
||||
OPERATING ACTIVITIES |
|
|
||||
Net income (loss) |
$ |
18,971 |
|
$ |
(17,185) |
|
Non-cash elements included in net income (loss): |
|
|
||||
Depreciation, depletion and amortization |
49,546 |
|
41,630 |
|
||
Gain on exchange of investments |
(1,158) |
|
— |
|
||
Unrealized loss on investments |
3,506 |
|
978 |
|
||
Provision for reclamation and closure costs |
4,529 |
|
1,548 |
|
||
Stock compensation |
500 |
|
1,219 |
|
||
Deferred taxes |
32 |
|
(3,252) |
|
||
Amortization of loan origination fees |
539 |
|
2,140 |
|
||
Gain on derivative contracts |
(10,962) |
|
(10,437) |
|
||
Foreign exchange (gain) loss |
1,755 |
|
(8,066) |
|
||
Other non-cash charges, net |
8 |
|
(104) |
|
||
Change in assets and liabilities: |
|
|
||||
Accounts receivable |
(2,664) |
|
9,955 |
|
||
Inventories |
2,120 |
|
(6,602) |
|
||
Other current and non-current assets |
1,528 |
|
(2,642) |
|
||
Accounts payable and accrued liabilities |
(24,545) |
|
(11,879) |
|
||
Accrued payroll and related benefits |
(7,995) |
|
9,495 |
|
||
Accrued taxes |
2,031 |
|
1,332 |
|
||
Accrued reclamation and closure costs and other non-current liabilities |
195 |
|
(3,203) |
|
||
Cash provided by operating activities |
37,936 |
|
4,927 |
|
||
|
|
|
||||
INVESTING ACTIVITIES |
|
|
||||
Additions to properties, plants, equipment and mineral interests |
(21,413) |
|
(19,870) |
|
||
Proceeds from disposition of properties, plants and equipment |
19 |
|
154 |
|
||
Net cash used in investing activities |
(21,394) |
|
(19,716) |
|
||
|
|
|
||||
FINANCING ACTIVITIES |
|
|
||||
Dividends paid to common stockholders |
(4,688) |
|
(1,304) |
|
||
Dividends paid to preferred stockholders |
(138) |
|
(138) |
|
||
Debt origination fees |
(82) |
|
(458) |
|
||
Borrowings on debt |
— |
|
679,500 |
|
||
Payments on debt |
— |
|
(506,500) |
|
||
Repayments of finance leases |
(1,881) |
|
(1,284) |
|
||
Net cash (used in) provided by financing activities |
(6,789) |
|
169,816 |
|
||
Effect of exchange rates on cash |
167 |
|
(1,736) |
|
||
Net increase in cash, cash equivalents and restricted cash and cash equivalents |
9,920 |
|
153,291 |
|
||
Cash, cash equivalents and restricted cash and cash equivalents at beginning of period |
130,883 |
|
63,477 |
|
||
Cash, cash equivalents and restricted cash and cash equivalents at end of period |
$ |
140,803 |
|
$ |
216,768 |
|
HECLA MINING COMPANY Condensed Consolidated Balance Sheets (dollars and shares in thousands - unaudited) |
|||||||||
|
March 31, 2021 |
|
December 31, 2020 |
||||||
ASSETS |
|
|
|
||||||
Current assets: |
|
|
|
||||||
Cash and cash equivalents |
$ |
139,750 |
|
|
|
$ |
129,830 |
|
|
Accounts receivable: |
|
|
|
||||||
Trade |
35,274 |
|
|
|
27,864 |
|
|
||
Other, net |
8,475 |
|
|
|
11,329 |
|
|
||
Inventories |
94,252 |
|
|
|
96,544 |
|
|
||
Derivative assets |
7,195 |
|
|
|
3,470 |
|
|
||
Other current assets |
12,971 |
|
|
|
15,644 |
|
|
||
Total current assets |
297,917 |
|
|
|
284,681 |
|
|
||
Investments |
11,717 |
|
|
|
15,148 |
|
|
||
Restricted cash and investments |
1,053 |
|
|
|
1,053 |
|
|
||
Properties, plants, equipment and mineral interests, net |
2,320,547 |
|
|
|
2,345,219 |
|
|
||
Operating lease right-of-use asset |
9,775 |
|
|
|
10,628 |
|
|
||
Deferred taxes |
3,886 |
|
|
|
2,912 |
|
|
||
Derivatives assets |
6,346 |
|
|
|
4,558 |
|
|
||
Other non-current assets |
3,836 |
|
|
|
3,525 |
|
|
||
Total assets |
$ |
2,655,077 |
|
|
|
$ |
2,667,724 |
|
|
|
|
|
|
||||||
LIABILITIES |
|
|
|
||||||
Current liabilities: |
|
|
|
||||||
Accounts payable and accrued liabilities |
$ |
53,130 |
|
|
|
$ |
68,516 |
|
|
Accrued payroll and related benefits |
22,800 |
|
|
|
31,807 |
|
|
||
Accrued taxes |
7,854 |
|
|
|
8,349 |
|
|
||
Finance leases |
6,706 |
|
|
|
6,491 |
|
|
||
Operating leases |
2,832 |
|
|
|
3,008 |
|
|
||
Accrued reclamation and closure costs |
6,592 |
|
|
|
5,582 |
|
|
||
Derivatives liabilities |
3,906 |
|
|
|
11,737 |
|
|
||
Other current liabilities |
5,298 |
|
|
|
14,295 |
|
|
||
Total current liabilities |
109,118 |
|
|
|
149,785 |
|
|
||
Finance leases |
10,304 |
|
|
|
9,274 |
|
|
||
Operating leases |
6,954 |
|
|
|
7,634 |
|
|
||
Long-term debt - Senior Notes |
507,992 |
|
|
|
507,242 |
|
|
||
Deferred tax liability |
149,220 |
|
|
|
144,330 |
|
|
||
Accrued reclamation and closure costs |
113,671 |
|
|
|
110,466 |
|
|
||
Pension liability |
28,797 |
|
|
|
44,144 |
|
|
||
Other non-current liabilities |
4,146 |
|
|
|
4,364 |
|
|
||
Total liabilities |
930,202 |
|
|
|
977,239 |
|
|
||
|
|
|
|
||||||
STOCKHOLDERS’ EQUITY |
|
|
|
||||||
Preferred stock |
39 |
|
|
|
39 |
|
|
||
Common stock |
135,546 |
|
|
|
134,629 |
|
|
||
Capital surplus |
2,021,072 |
|
|
|
2,003,576 |
|
|
||
Accumulated deficit |
(377,229 |
) |
|
|
(391,374 |
) |
|
||
Accumulated other comprehensive loss |
(31,057 |
) |
|
|
(32,889 |
) |
|
||
Treasury stock |
(23,496 |
) |
|
|
(23,496 |
) |
|
||
Total stockholders’ equity |
1,724,875 |
|
|
|
1,690,485 |
|
|
||
Total liabilities and stockholders’ equity |
$ |
2,655,077 |
|
|
|
$ |
2,667,724 |
|
|
Common shares outstanding |
535,334 |
|
|
|
531,666 |
|
|
HECLA MINING COMPANY Production Data |
|||||||
|
Three Months Ended |
||||||
|
March 31, 2021 |
March 31, 2020 |
|||||
GREENS CREEK UNIT |
|
|
|||||
Tons of ore milled |
194,080 |
|
|
198,804 |
|
||
Total production cost per ton |
$ |
182.61 |
|
|
$ |
185.92 |
|
Ore grade milled - Silver (oz./ton) |
16.01 |
|
|
16.87 |
|
||
Ore grade milled - Gold (oz./ton) |
0.09 |
|
|
0.08 |
|
||
Ore grade milled - Lead (%) |
3.06 |
|
|
3.12 |
|
||
Ore grade milled - Zinc (%) |
7.62 |
|
|
6.89 |
|
||
Silver produced (oz.) |
2,584,870 |
|
|
2,775,707 |
|
||
Gold produced (oz.) |
13,266 |
|
|
12,273 |
|
||
Lead produced (tons) |
4,924 |
|
|
5,198 |
|
||
Zinc produced (tons) |
13,354 |
|
|
12,487 |
|
||
Cash cost, after by-product credits, per silver ounce (1) |
$ |
(0.67 |
) |
|
$ |
5.63 |
|
AISC, after by-product credits, per silver ounce (1) |
$ |
1.59 |
|
|
$ |
7.90 |
|
Capital additions (in thousands) |
$ |
4,892 |
|
|
$ |
5,510 |
|
LUCKY FRIDAY UNIT |
|
|
|||||
Tons of ore processed |
81,071 |
|
|
10,219 |
|
||
Total production cost per ton |
$ |
181.28 |
|
|
$ |
— |
|
Ore grade milled - Silver (oz./ton) |
11.18 |
|
|
9.87 |
|
||
Ore grade milled - Lead (%) |
7.51 |
|
|
7.23 |
|
||
Ore grade milled - Zinc (%) |
3.70 |
|
|
3.85 |
|
||
Silver produced (oz.) |
863,901 |
|
|
95,748 |
|
||
Lead produced (tons) |
5,780 |
|
|
695 |
|
||
Zinc produced (tons) |
2,753 |
|
|
360 |
|
||
Cash cost, after by-product credits, per silver ounce (1) |
$ |
7.62 |
|
|
$ |
— |
|
AISC, after by-product credits, per silver ounce (1) |
$ |
14.24 |
|
|
$ |
— |
|
Capital additions (in thousands) |
$ |
5,912 |
|
|
$ |
4,295 |
|
CASA BERARDI UNIT |
|
|
|||||
Tons of ore milled - underground |
186,919 |
|
|
160,937 |
|
||
Tons of ore milled - surface pit |
181,484 |
|
|
170,681 |
|
||
Tons of ore milled - total |
368,403 |
|
|
331,618 |
|
||
Surface tons mined - ore and waste |
1,991,087 |
|
|
1,724,974 |
|
||
Total production cost per ton |
$ |
99.67 |
|
|
$ |
102.45 |
|
Ore grade milled - Gold (oz./ton) - underground |
0.147 |
|
|
0.170 |
|
||
Ore grade milled - Gold (oz./ton) - surface pit |
0.048 |
|
|
0.068 |
|
||
Ore grade milled - Gold (oz./ton) - combined |
0.120 |
|
|
0.102 |
|
||
Ore grade milled - Silver (oz./ton) |
0.04 |
|
|
0.02 |
|
||
Gold produced (oz.) - underground |
27,569 |
|
|
17,581 |
|
||
Gold produced (oz.) - surface pit |
8,621 |
|
|
9,171 |
|
||
Gold produced (oz.) - total |
36,190 |
|
|
26,752 |
|
||
Silver produced (oz.) |
10,675 |
|
|
5,934 |
|
||
Cash cost, after by-product credits, per gold ounce (1) |
$ |
1,027 |
|
|
$ |
1,268 |
|
AISC, after by-product credits, per gold ounce (1) |
$ |
1,272 |
|
|
$ |
1,615 |
|
Capital additions (in thousands) |
$ |
13,847 |
|
|
$ |
8,506 |
|
SAN SEBASTIAN UNIT |
|
|
||||
Tons of ore milled |
— |
|
35,476 |
|
||
Total production cost per ton |
$ |
— |
|
$ |
178.02 |
|
Ore grade milled - Silver (oz./ton) |
— |
|
10.64 |
|
||
Ore grade milled - Gold (oz./ton) |
— |
|
0.091 |
|
||
Silver produced (oz.) |
— |
|
346,625 |
|
||
Gold produced (oz.) |
— |
|
2,802 |
|
||
Cash cost, after by-product credits, per silver ounce (1) |
$ |
— |
|
$ |
6.91 |
|
AISC, after by-product credits, per silver ounce (1) |
$ |
— |
|
$ |
9.59 |
|
Capital additions (in thousands) |
$ |
— |
|
$ |
803 |
|
NEVADA OPERATIONS UNIT |
|
|
||||
Tons of ore milled |
16,459 |
|
17,298 |
|
||
Total production cost per ton |
$ |
360.72 |
|
$ |
745.14 |
|
Ore grade milled - Gold (oz./ton) |
0.185 |
|
1.055 |
|
||
Ore grade milled - Silver (oz./ton) |
— |
|
1.470 |
|
||
Gold produced (oz.) |
2,548 |
|
16.965 |
|
||
Silver produced (oz.) |
— |
|
21.455 |
|
||
Cash cost, after by-product credits, per gold ounce (1) |
$ |
1,416 |
|
$ |
735 |
|
AISC, after by-product credits, per gold ounce (1) |
$ |
1,461 |
|
$ |
808 |
|
Capital additions (in thousands) |
$ | 89 |
|
$ |
857 |
(1) Cash cost, after by-product credits, per ounce and AISC, after by-products credits, per ounce represent a non-U.S. Generally Accepted Accounting Principles (GAAP) measurement. A reconciliation of cash cost, after by-product credits and AISC, after by-products credits to cost of sales and other direct production costs and depreciation, depletion and amortization (GAAP) can be found in the cash cost per ounce reconciliation section of this news release. Gold, lead and zinc produced have been treated as by-product credits in calculating silver costs per ounce. The primary metal produced at Casa Berardi and Nevada Operations is gold, with a by-product credit for the value of silver production.
Reconciliation of Total cost of sales (GAAP) to Cash Cost, Before By-product Credits and Cash Cost, After By-product Credits (non-GAAP) and All-In Sustaining Costs, Before By-product Credits and All-In Sustaining Costs, After By-product Credits (non-GAAP)
The tables below present reconciliations between the most comparable GAAP measure of cost of sales and other direct production costs and depreciation, depletion and amortization to the non-GAAP measures of Cash Cost, Before By-product Credits, Cash Cost, After By-product Credits, AISC, Before By-product Credits and AISC, After By-product Credits for our operations at the Greens Creek, Lucky Friday, San Sebastian, Casa Berardi and Nevada Operations units for the three-month periods ended March 31, 2021 and 2020.
Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce are measures developed by precious metals companies (including the Silver Institute and the World Gold Council) in an effort to provide a uniform standard for comparison purposes. There can be no assurance, however, that these non-GAAP measures as we report them are the same as those reported by other mining companies.
Cash Cost, After By-product Credits, per Ounce is an important operating statistic that we utilize to measure each mine's operating performance. AISC, After By-product Credits, per Ounce is an important operating statistic that we utilize as a measures of our mines' net cash flow after costs for exploration, pre-development, reclamation, and sustaining capital. Current GAAP measures used in the mining industry, such as cost of goods sold, do not capture all the expenditures incurred to discover, develop and sustain silver and gold production. Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce also allow us to benchmark the performance of each of our mines versus those of our competitors. As a silver and gold mining company, we also use these statistics on an aggregate basis - aggregating the Greens Creek, Lucky Friday and San Sebastian mines - to compare our performance with that of other silver mining companies, and aggregating Casa Berardi and Nevada Operations for comparison to other gold mining companies. Similarly, these statistics are useful in identifying acquisition and investment opportunities as they provide a common tool for measuring the financial performance of other mines with varying geologic, metallurgical and operating characteristics.
Cash Cost, Before By-product Credits and AISC, Before By-product Credits include all direct and indirect operating cash costs related directly to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining expense, on-site general and administrative costs, and royalties. AISC, Before By-product Credits for each mine also includes on-site exploration, reclamation, and sustaining capital costs. AISC, Before By-product Credits for our consolidated silver properties also includes corporate costs for general and administrative expense, reclamation, exploration, and pre-development. By-product credits include revenues earned from all metals other than the primary metal produced at each unit. As depicted in the tables below, by-product credits comprise an essential element of our silver unit cost structure, distinguishing our silver operations due to the polymetallic nature of their orebodies. Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce provide management and investors an indication of operating cash flow, after consideration of the average price, received from production. We also use these measurements for the comparative monitoring of performance of our mining operations period-to-period from a cash flow perspective. Cash Cost, After By-product Credits, per Ounce is a measure developed by precious metals companies (including the Silver Institute) in an effort to provide a uniform standard for comparison purposes. There can be no assurance, however, that our reporting of these non-GAAP measures are the same as those reported by other mining companies.
The Casa Berardi, Nevada Operations and combined gold properties information below reports Cash Cost, After By-product Credits, per Gold Ounce and AISC, After By-product Credits, per Gold Ounce for the production of gold, its primary product, and by-product revenues earned from silver, which is a by-product at Casa Berardi and Nevada Operations. Only costs and ounces produced relating to units with the same primary product are combined to represent Cash Cost, After By-product Credits, per Ounce and AISC, After By-product Credits, per Ounce. Thus, the gold produced at our Casa Berardi and Nevada Operations units is not included as a by-product credit when calculating Cash Cost, After By-product Credits, per Silver Ounce and AISC, After By-product Credits, per Silver Ounce for the total of Greens Creek, Lucky Friday and San Sebastian, our combined silver properties. Similarly, the silver produced at our other three units is not included as a by-product credit when calculating the gold metrics for Casa Berardi and Nevada Operations.
In thousands (except per ounce amounts) |
Three Months Ended March 31, 2021 |
|||||||||||||||||||||
|
Greens
|
|
Lucky
|
|
San Sebastian |
|
Corporate(3) |
|
Total
|
|||||||||||||
Total cost of sales |
$ |
53,181 |
|
|
|
$ |
22,794 |
|
|
|
$ |
94 |
|
|
|
|
|
$ |
76,069 |
|
|
|
Depreciation, depletion and amortization |
(14,821 |
) |
|
|
(6,336 |
) |
|
|
— |
|
|
|
|
|
(21,157 |
) |
|
|||||
Treatment costs |
10,541 |
|
|
|
4,978 |
|
|
|
— |
|
|
|
|
|
15,519 |
|
|
|||||
Change in product inventory |
401 |
|
|
|
(93 |
) |
|
|
— |
|
|
|
|
|
308 |
|
|
|||||
Reclamation and other costs |
(261 |
) |
|
|
(233 |
) |
|
|
(94 |
) |
|
|
|
|
(588 |
) |
|
|||||
Cash Cost, Before By-product Credits (1) |
49,041 |
|
|
|
21,110 |
|
|
|
— |
|
|
|
|
|
70,151 |
|
|
|||||
Reclamation and other costs |
848 |
|
|
|
264 |
|
|
|
— |
|
|
|
|
|
1,112 |
|
|
|||||
Exploration |
123 |
|
|
|
— |
|
|
|
— |
|
|
|
435 |
|
|
558 |
|
|
||||
Sustaining capital |
4,892 |
|
|
|
5,454 |
|
|
|
— |
|
|
|
— |
|
|
10,346 |
|
|
||||
General and administrative |
— |
|
|
|
— |
|
|
|
— |
|
|
|
8,007 |
|
|
8,007 |
|
|
||||
AISC, Before By-product Credits (1) |
54,904 |
|
|
|
26,828 |
|
|
|
— |
|
|
|
|
|
90,174 |
|
|
|||||
By-product credits: |
|
|
|
|
|
|
|
|
|
|||||||||||||
Zinc |
(22,767 |
) |
|
|
(4,753 |
) |
|
|
— |
|
|
|
|
|
(27,520 |
) |
|
|||||
Gold |
(20,996 |
) |
|
|
— |
|
|
|
— |
|
|
|
|
|
(20,996 |
) |
|
|||||
Lead |
(7,020 |
) |
|
|
(9,775 |
) |
|
|
— |
|
|
|
|
|
(16,795 |
) |
|
|||||
Total By-product credits |
(50,783 |
) |
|
|
(14,528 |
) |
|
|
— |
|
|
|
|
|
(65,311 |
) |
|
|||||
Cash Cost, After By-product Credits |
$ |
(1,742 |
) |
|
|
$ |
6,582 |
|
|
|
$ |
— |
|
|
|
|
|
$ |
4,840 |
|
|
|
AISC, After By-product Credits |
$ |
4,121 |
|
|
|
$ |
12,300 |
|
|
|
$ |
— |
|
|
|
|
|
$ |
24,863 |
|
|
|
Divided by ounces produced |
2,585 |
|
|
|
864 |
|
|
|
— |
|
|
|
|
|
3,449 |
|
|
|||||
Cash Cost, Before By-product Credits, per Silver Ounce |
$ |
18.98 |
|
|
|
$ |
24.43 |
|
|
|
$ |
— |
|
|
|
|
|
$ |
20.34 |
|
|
|
By-product credits per ounce |
(19.65 |
) |
|
|
(16.81 |
) |
|
|
— |
|
|
|
|
|
(18.94 |
) |
|
|||||
Cash Cost, After By-product Credits, per Silver Ounce |
$ |
(0.67 |
) |
|
|
$ |
7.62 |
|
|
|
$ |
— |
|
|
|
|
|
$ |
1.40 |
|
|
|
AISC, Before By-product Credits, per Silver Ounce |
$ |
21.24 |
|
|
|
$ |
31.05 |
|
|
|
$ |
— |
|
|
|
|
|
$ |
26.15 |
|
|
|
By-product credits per ounce |
(19.65 |
) |
|
|
(16.81 |
) |
|
|
— |
|
|
|
|
|
(18.94 |
) |
|
|||||
AISC, After By-product Credits, per Silver Ounce |
$ |
1.59 |
|
|
|
$ |
14.24 |
|
|
|
$ |
— |
|
|
|
|
|
$ |
7.21 |
|
|
In thousands (except per ounce amounts) |
Three Months Ended March 31, 2021 |
|||||||||||||
|
Casa Berardi (4) |
|
Nevada
|
|
Total Gold |
|||||||||
Total cost of sales |
$ |
62,516 |
|
|
|
$ |
7,455 |
|
|
|
$ |
69,971 |
|
|
Depreciation, depletion and amortization |
(25,541 |
) |
|
|
(2,633 |
) |
|
|
(28,174 |
) |
|
|||
Treatment costs |
714 |
|
|
|
11 |
|
|
|
725 |
|
|
|||
Change in product inventory |
(47 |
) |
|
|
(1,084 |
) |
|
|
(1,131 |
) |
|
|||
Reclamation and other costs |
(208 |
) |
|
|
(27 |
) |
|
|
(235 |
) |
|
|||
Cash costs excluded |
— |
|
|
|
(115 |
) |
|
|
(115 |
) |
|
|||
Cash Cost, Before By-product Credits (1) |
37,434 |
|
|
|
3,607 |
|
|
|
41,041 |
|
|
|||
Reclamation and other costs |
208 |
|
|
|
27 |
|
|
|
235 |
|
|
|||
Exploration |
907 |
|
|
|
— |
|
|
|
907 |
|
|
|||
Sustaining capital |
7,758 |
|
|
|
89 |
|
|
|
7,847 |
|
|
|||
General and administrative |
|
|
|
|
— |
|
|
|||||||
AISC, Before By-product Credits (1) |
46,307 |
|
|
|
3,723 |
|
|
|
50,030 |
|
|
|||
By-product credits: |
|
|
|
|
|
|||||||||
Silver |
(278 |
) |
|
|
— |
|
|
|
(278 |
) |
|
|||
Total By-product credits |
(278 |
) |
|
|
— |
|
|
|
(278 |
) |
|
|||
Cash Cost, After By-product Credits |
$ |
37,156 |
|
|
|
$ |
3,607 |
|
|
|
$ |
40,763 |
|
|
AISC, After By-product Credits |
$ |
46,029 |
|
|
|
$ |
3,723 |
|
|
|
$ |
49,752 |
|
|
Divided by ounces produced |
36 |
|
|
|
3 |
|
|
|
39 |
|
|
|||
Cash Cost, Before By-product Credits, per Gold Ounce |
$ |
1,035 |
|
|
|
$ |
1,416 |
|
|
|
$ |
1,059 |
|
|
By-product credits per ounce |
$ |
(8 |
) |
|
|
$ |
— |
|
|
|
$ |
(7 |
) |
|
Cash Cost, After By-product Credits, per Gold Ounce |
$ |
1,027 |
|
|
|
$ |
1,416 |
|
|
|
$ |
1,052 |
|
|
AISC, Before By-product Credits, per Gold Ounce |
$ |
1,280 |
|
|
|
$ |
1,461 |
|
|
|
$ |
1,291 |
|
|
By-product credits per ounce |
$ |
(8 |
) |
|
|
$ |
— |
|
|
|
$ |
(7 |
) |
|
AISC, After By-product Credits, per Gold Ounce |
$ |
1,272 |
|
|
|
$ |
1,461 |
|
|
|
$ |
1,284 |
|
|
In thousands (except per ounce amounts) |
Three Months Ended March 31, 2021 |
|||||||||||||
|
Total Silver |
|
Total Gold |
|
Total |
|||||||||
Total cost of sales |
$ |
76,069 |
|
|
|
$ |
69,971 |
|
|
|
$ |
146,040 |
|
|
Depreciation, depletion and amortization |
(21,157 |
) |
|
|
(28,174 |
) |
|
|
(49,331 |
) |
|
|||
Treatment costs |
15,519 |
|
|
|
725 |
|
|
|
16,244 |
|
|
|||
Change in product inventory |
308 |
|
|
|
(1,131 |
) |
|
|
(823 |
) |
|
|||
Reclamation and other costs |
(588 |
) |
|
|
(235 |
) |
|
|
(823 |
) |
|
|||
Cash costs excluded |
— |
|
|
|
(115 |
) |
|
|
(115 |
) |
|
|||
Cash Cost, Before By-product Credits (1) |
70,151 |
|
|
|
41,041 |
|
|
|
111,192 |
|
|
|||
Reclamation and other costs |
1,112 |
|
|
|
235 |
|
|
|
1,347 |
|
|
|||
Exploration |
558 |
|
|
|
907 |
|
|
|
1,465 |
|
|
|||
Sustaining capital |
10,346 |
|
|
|
7,847 |
|
|
|
18,193 |
|
|
|||
General and administrative |
8,007 |
|
|
|
— |
|
|
|
8,007 |
|
|
|||
AISC, Before By-product Credits (1) |
90,174 |
|
|
|
50,030 |
|
|
|
140,204 |
|
|
|||
By-product credits: |
|
|
|
|
|
|||||||||
Zinc |
(27,520 |
) |
|
|
— |
|
|
|
(27,520 |
) |
|
|||
Gold |
(20,996 |
) |
|
|
— |
|
|
|
(20,996 |
) |
|
|||
Lead |
(16,795 |
) |
|
|
— |
|
|
|
(16,795 |
) |
|
|||
Silver |
— |
|
|
|
(278 |
) |
|
|
(278 |
) |
|
|||
Total By-product credits |
(65,311 |
) |
|
|
(278 |
) |
|
|
(65,589 |
) |
|
|||
Cash Cost, After By-product Credits |
$ |
4,840 |
|
|
|
$ |
40,763 |
|
|
|
$ |
45,603 |
|
|
AISC, After By-product Credits |
$ |
24,863 |
|
|
|
$ |
49,752 |
|
|
|
$ |
74,615 |
|
|
Divided by ounces produced |
3,449 |
|
|
|
39 |
|
|
|
|
|||||
Cash Cost, Before By-product Credits, per Ounce |
$ |
20.34 |
|
|
|
$ |
1,059 |
|
|
|
|
|||
By-product credits per ounce |
(18.94 |
) |
|
|
$ |
(7 |
) |
|
|
|
||||
Cash Cost, After By-product Credits, per Ounce |
$ |
1.40 |
|
|
|
$ |
1,052 |
|
|
|
|
|||
AISC, Before By-product Credits, per Ounce |
$ |
26.15 |
|
|
|
$ |
1,291 |
|
|
|
|
|||
By-product credits per ounce |
(18.94 |
) |
|
|
$ |
(7 |
) |
|
|
|
||||
AISC, After By-product Credits, per Ounce |
$ |
7.21 |
|
|
|
$ |
1,284 |
|
|
|
|
In thousands (except per ounce amounts) |
Three Months Ended March 31, 2020 |
|||||||||||||||||||||
|
Greens
|
|
Lucky
|
|
San
|
|
Corporate(3) |
|
Total
|
|||||||||||||
Total cost of sales |
$ |
49,182 |
|
|
|
$ |
2,832 |
|
|
|
$ |
8,300 |
|
|
|
|
|
$ |
60,314 |
|
|
|
Depreciation, depletion and amortization |
(12,429 |
) |
|
|
(302 |
) |
|
|
(1,473 |
) |
|
|
|
|
(14,204 |
) |
|
|||||
Treatment costs |
15,826 |
|
|
|
432 |
|
|
|
104 |
|
|
|
|
|
16,362 |
|
|
|||||
Change in product inventory |
2,870 |
|
|
|
914 |
|
|
|
253 |
|
|
|
|
|
4,037 |
|
|
|||||
Reclamation and other costs |
319 |
|
|
|
— |
|
|
|
(361 |
) |
|
|
|
|
(42 |
) |
|
|||||
Exclusion of Lucky Friday costs |
— |
|
|
|
(3,876 |
) |
|
|
— |
|
|
|
|
|
(3,876 |
) |
|
|||||
Cash Cost, Before By-product Credits (1) |
55,768 |
|
|
|
— |
|
|
|
6,823 |
|
|
|
|
|
62,591 |
|
|
|||||
Reclamation and other costs |
788 |
|
|
|
— |
|
|
|
114 |
|
|
|
|
|
902 |
|
|
|||||
Exploration |
4 |
|
|
|
— |
|
|
|
767 |
|
|
|
350 |
|
|
1,121 |
|
|
||||
Sustaining capital |
5,510 |
|
|
|
— |
|
|
|
56 |
|
|
|
— |
|
|
5,566 |
|
|
||||
General and administrative |
— |
|
|
|
— |
|
|
|
— |
|
|
|
8,939 |
|
|
8,939 |
|
|
||||
AISC, Before By-product Credits (1) |
62,070 |
|
|
|
— |
|
|
|
7,760 |
|
|
|
|
|
79,119 |
|
|
|||||
By-product credits: |
|
|
|
|
|
|
|
|
|
|||||||||||||
Zinc |
(16,026 |
) |
|
|
— |
|
|
|
— |
|
|
|
|
|
(16,026 |
) |
|
|||||
Gold |
(17,197 |
) |
|
|
— |
|
|
|
(4,429 |
) |
|
|
|
|
(21,626 |
) |
|
|||||
Lead |
(6,926 |
) |
|
|
— |
|
|
|
— |
|
|
|
|
|
(6,926 |
) |
|
|||||
Total By-product credits |
(40,149 |
) |
|
|
— |
|
|
|
(4,429 |
) |
|
|
|
|
(44,578 |
) |
|
|||||
Cash Cost, After By-product Credits |
$ |
15,619 |
|
|
|
$ |
— |
|
|
|
$ |
2,394 |
|
|
|
|
|
$ |
18,013 |
|
|
|
AISC, After By-product Credits |
$ |
21,921 |
|
|
|
$ |
— |
|
|
|
$ |
3,331 |
|
|
|
|
|
$ |
34,541 |
|
|
|
Divided by ounces produced |
2,776 |
|
|
|
— |
|
|
|
347 |
|
|
|
|
|
3,123 |
|
|
|||||
Cash Cost, Before By-product Credits, per Ounce |
$ |
20.09 |
|
|
|
$ |
— |
|
|
|
$ |
19.67 |
|
|
|
|
|
$ |
20.04 |
|
|
|
By-product credits per ounce |
(14.46 |
) |
|
|
— |
|
|
|
(12.76 |
) |
|
|
|
|
(14.27 |
) |
|
|||||
Cash Cost, After By-product Credits, per Ounce |
$ |
5.63 |
|
|
|
$ |
— |
|
|
|
$ |
6.91 |
|
|
|
|
|
$ |
5.77 |
|
|
|
AISC, Before By-product Credits, per Ounce |
$ |
22.36 |
|
|
|
$ |
— |
|
|
|
$ |
22.35 |
|
|
|
|
|
$ |
25.33 |
|
|
|
By-product credits per ounce |
(14.46 |
) |
|
|
— |
|
|
|
(12.76 |
) |
|
|
|
|
(14.27 |
) |
|
|||||
AISC, After By-product Credits, per Ounce |
$ |
7.90 |
|
|
|
$ |
— |
|
|
|
$ |
9.59 |
|
|
|
|
|
$ |
11.06 |
|
|
In thousands (except per ounce amounts) |
Three Months Ended March 31, 2020 |
|||||||||||||
|
Casa
|
|
Nevada
|
|
Total Gold |
|||||||||
Total cost of sales |
$ |
48,325 |
|
|
|
$ |
16,914 |
|
|
|
$ |
65,239 |
|
|
Depreciation, depletion and amortization |
(16,397 |
) |
|
|
(9,065 |
) |
|
|
(25,462 |
) |
|
|||
Treatment costs |
574 |
|
|
|
26 |
|
|
|
600 |
|
|
|||
Change in product inventory |
1,608 |
|
|
|
5,280 |
|
|
|
6,888 |
|
|
|||
Reclamation and other costs |
(97 |
) |
|
|
(326 |
) |
|
|
(423 |
) |
|
|||
Cash Cost, Before By-product Credits (1) |
34,013 |
|
|
|
12,829 |
|
|
|
46,842 |
|
|
|||
Reclamation and other costs |
96 |
|
|
|
327 |
|
|
|
423 |
|
|
|||
Exploration |
691 |
|
|
|
85 |
|
|
|
776 |
|
|
|||
Sustaining capital |
8,506 |
|
|
|
826 |
|
|
|
9,332 |
|
|
|||
AISC, Before By-product Credits (1) |
43,306 |
|
|
|
14,067 |
|
|
|
57,373 |
|
|
|||
By-product credits: |
|
|
|
|
|
|||||||||
Silver |
(100 |
) |
|
|
(353 |
) |
|
|
(453 |
) |
|
|||
Total By-product credits |
(100 |
) |
|
|
(353 |
) |
|
|
(453 |
) |
|
|||
Cash Cost, After By-product Credits |
$ |
33,913 |
|
|
|
$ |
12,476 |
|
|
|
$ |
46,389 |
|
|
AISC, After By-product Credits |
$ |
43,206 |
|
|
|
$ |
13,714 |
|
|
|
$ |
56,920 |
|
|
Divided by ounces produced |
27 |
|
|
|
17 |
|
|
|
44 |
|
||||
Cash Cost, Before By-product Credits, per Ounce |
$ |
1,272 |
|
|
|
$ |
756 |
|
|
|
$ |
1,071 |
|
|
By-product credits per ounce |
(4 |
) |
|
|
(21 |
) |
|
|
(10 |
) |
|
|||
Cash Cost, After By-product Credits, per Ounce |
$ |
1,268 |
|
|
|
$ |
735 |
|
|
|
$ |
1,061 |
|
|
AISC, Before By-product Credits, per Ounce |
$ |
1,619 |
|
|
|
$ |
829 |
|
|
|
$ |
1,312 |
|
|
By-product credits per ounce |
(4 |
) |
|
|
(21 |
) |
|
|
(10 |
) |
|
|||
AISC, After By-product Credits, per Ounce |
$ |
1,615 |
|
|
|
$ |
808 |
|
|
|
$ |
1,302 |
|
|
In thousands (except per ounce amounts) |
Three Months Ended March 31, 2020 |
||||||||||
|
Total Silver |
|
Total Gold |
|
Total |
||||||
Total cost of sales |
$ |
60,314 |
|
|
$ |
65,239 |
|
|
$ |
125,553 |
|
Depreciation, depletion and amortization |
(14,204) |
|
|
(25,462) |
|
|
(39,666) |
|
|||
Treatment costs |
16,362 |
|
|
600 |
|
|
16,962 |
|
|||
Change in product inventory |
4,037 |
|
|
6,888 |
|
|
10,925 |
|
|||
Reclamation and other costs |
(42) |
|
|
(423) |
|
|
(465) |
|
|||
Exclusion of Lucky Friday costs |
(3,876) |
|
|
— |
|
|
(3,876) |
|
|||
Cash Cost, Before By-product Credits (1) |
62,591 |
|
|
46,842 |
|
|
109,433 |
|
|||
Reclamation and other costs |
902 |
|
|
423 |
|
|
1,325 |
|
|||
Exploration |
1,121 |
|
|
776 |
|
|
1,897 |
|
|||
Sustaining capital |
5,566 |
|
|
9,332 |
|
|
14,898 |
|
|||
General and administrative |
8,939 |
|
|
— |
|
|
8,939 |
|
|||
AISC, Before By-product Credits (1) |
79,119 |
|
|
57,373 |
|
|
136,492 |
|
|||
By-product credits: |
|
|
|
|
|
||||||
Zinc |
(16,026) |
|
|
— |
|
|
(16,026) |
|
|||
Gold |
(21,626) |
|
|
— |
|
|
(21,626) |
|
|||
Lead |
(6,926) |
|
|
— |
|
|
(6,926) |
|
|||
Silver |
— |
|
|
(453) |
|
|
(453) |
|
|||
Total By-product credits |
(44,578) |
|
|
(453) |
|
|
(45,031) |
|
|||
Cash Cost, After By-product Credits |
$ |
18,013 |
|
|
$ |
46,389 |
|
|
$ |
64,402 |
|
AISC, After By-product Credits |
$ |
34,541 |
|
|
$ |
56,920 |
|
|
$ |
91,461 |
|
Divided by ounces produced |
3,123 |
|
|
44 |
|
|
|||||
Cash Cost, Before By-product Credits, per Ounce |
$ |
20.04 |
|
|
$ |
1,071 |
|
|
|
||
By-product credits per ounce |
(14.27) |
|
|
(10) |
|
|
|
||||
Cash Cost, After By-product Credits, per Ounce |
$ |
5.77 |
|
|
$ |
1,061 |
|
|
|
||
AISC, Before By-product Credits, per Ounce |
$ |
25.33 |
|
|
$ |
1,312 |
|
|
|
||
|
(14.27) |
|
|
(10) |
|
|
|
||||
AISC, After By-product Credits, per Ounce |
$ |
11.06 |
|
|
$ |
1,302 |
|
|
|
In thousands (except per ounce amounts) |
Original Estimate for Twelve Months Ended December 31, 2021 |
||||||||||||||||||||
|
Greens
|
|
Lucky Friday |
|
San
|
|
Corporate(3) |
|
Total Silver |
||||||||||||
Total cost of sales |
$ |
220,000 |
|
|
|
$ |
90,400 |
|
|
|
$ |
— |
|
|
|
|
$ |
310,400 |
|
|
|
Depreciation, depletion and amortization |
(46,000 |
) |
|
|
(26,000 |
) |
|
|
— |
|
|
|
|
(72,000 |
) |
|
|||||
Treatment costs |
49,000 |
|
|
|
17,100 |
|
|
|
— |
|
|
|
|
66,100 |
|
|
|||||
Change in product inventory |
(5,700 |
) |
|
|
— |
|
|
|
— |
|
|
|
|
(5,700 |
) |
|
|||||
Reclamation and other costs |
1,500 |
|
|
|
1,000 |
|
|
|
— |
|
|
|
|
2,500 |
|
|
|||||
Cash Cost, Before By-product Credits (1) |
218,800 |
|
|
|
82,500 |
|
|
|
— |
|
|
|
|
301,300 |
|
|
|||||
Reclamation and other costs |
3,400 |
|
|
|
500 |
|
|
|
— |
|
|
|
|
3,900 |
|
|
|||||
Exploration |
4,000 |
|
|
|
— |
|
|
|
— |
|
|
|
|
4,000 |
|
|
|||||
Sustaining capital |
38,000 |
|
|
|
22,000 |
|
|
|
— |
|
|
|
|
60,000 |
|
|
|||||
General and administrative |
— |
|
|
|
— |
|
|
|
— |
|
|
32,000 |
|
|
32,000 |
|
|
||||
AISC, Before By-product Credits (1) |
264,200 |
|
|
|
105,000 |
|
|
|
— |
|
|
|
|
401,200 |
|
|
|||||
By-product credits: |
|
|
|
|
|
|
|
|
|
||||||||||||
Zinc |
(70,000 |
) |
|
|
(14,500 |
) |
|
|
— |
|
|
|
|
(84,500 |
) |
|
|||||
Gold |
(62,000 |
) |
|
|
— |
|
|
|
— |
|
|
|
|
(62,000 |
) |
|
|||||
Lead |
(28,000 |
) |
|
|
(38,900 |
) |
|
|
— |
|
|
|
|
(66,900 |
) |
|
|||||
Total By-product credits |
(160,000 |
) |
|
|
(53,400 |
) |
|
|
— |
|
|
|
|
(213,400 |
) |
|
|||||
Cash Cost, After By-product Credits |
$ |
58,800 |
|
|
|
$ |
29,100 |
|
|
|
$ |
— |
|
|
|
|
$ |
87,900 |
|
|
|
AISC, After By-product Credits |
$ |
104,200 |
|
|
|
$ |
51,600 |
|
|
|
$ |
— |
|
|
|
|
$ |
187,800 |
|
|
|
Divided by silver ounces produced |
9,850 |
|
|
|
3,600 |
|
|
|
— |
|
|
|
|
13,450 |
|
|
|||||
Cash Cost, Before By-product Credits, per Silver Ounce |
$ |
22.21 |
|
|
|
$ |
22.92 |
|
|
|
$ |
— |
|
|
|
|
$ |
22.40 |
|
|
|
By-product credits per silver ounce |
(16.24 |
) |
|
|
(14.83 |
) |
|
|
— |
|
|
|
|
(15.87 |
) |
|
|||||
Cash Cost, After By-product Credits, per Silver Ounce |
$ |
5.97 |
|
|
|
$ |
8.09 |
|
|
|
$ |
— |
|
|
|
|
$ |
6.53 |
|
|
|
AISC, Before By-product Credits, per Silver Ounce |
$ |
26.82 |
|
|
|
$ |
29.17 |
|
|
|
$ |
— |
|
|
|
|
$ |
29.83 |
|
|
|
By-product credits per silver ounce |
(16.24 |
) |
|
|
(14.83 |
) |
|
|
— |
|
|
|
|
(15.87 |
) |
|
|||||
AISC, After By-product Credits, per Silver Ounce |
$ |
10.58 |
|
|
|
$ |
14.34 |
|
|
|
$ |
— |
|
|
|
|
$ |
13.96 |
|
|
In thousands (except per ounce amounts) |
Original Estimate for Twelve Months Ended December 31, 2021 |
||||||||||||||
|
Casa Berardi |
|
Nevada
|
|
Total Gold |
||||||||||
Total cost of sales |
$ |
175,900 |
|
|
|
$ |
41,000 |
|
|
|
$ |
216,900 |
|
|
|
Depreciation, depletion and amortization |
(61,000 |
) |
|
|
(5,600 |
) |
|
|
(66,600 |
) |
|
||||
Treatment costs |
400 |
|
|
|
4,600 |
|
|
|
5,000 |
|
|
||||
Change in product inventory |
600 |
|
|
|
(11,600 |
) |
|
|
(11,000 |
) |
|
||||
Reclamation and other costs |
300 |
|
|
|
500 |
|
|
|
800 |
|
|
||||
Cash Cost, Before By-product Credits (1) |
116,200 |
|
|
|
28,900 |
|
|
|
145,100 |
|
|
||||
Reclamation and other costs |
500 |
|
|
|
100 |
|
|
|
600 |
|
|
||||
Exploration |
3,800 |
|
|
|
— |
|
|
|
3,800 |
|
|
||||
Sustaining capital |
31,500 |
|
|
|
2,000 |
|
|
|
33,500 |
|
|
||||
AISC, Before By-product Credits (1) |
152,000 |
|
|
|
31,000 |
|
|
|
183,000 |
|
|
||||
By-product credits: |
|
|
|
|
|
|
|||||||||
Silver |
(600 |
) |
|
|
(550 |
) |
|
|
(1,150 |
) |
|
||||
Total By-product credits |
(600 |
) |
|
|
(550 |
) |
|
|
(1,150 |
) |
|
||||
Cash Cost, After By-product Credits |
$ |
115,600 |
|
|
|
$ |
28,350 |
|
|
|
$ |
143,950 |
|
|
|
AISC, After By-product Credits |
$ |
151,400 |
|
|
|
$ |
30,450 |
|
|
|
$ |
181,850 |
|
|
|
Divided by gold ounces produced |
127 |
|
|
|
21 |
|
|
|
148 |
|
|
||||
Cash Cost, Before By-product Credits, per Gold Ounce |
$ |
919 |
|
|
|
$ |
1,376 |
|
|
|
$ |
984 |
|
|
|
By-product credits per gold ounce |
(5 |
) |
|
|
(26 |
) |
|
|
(8 |
) |
|
||||
Cash Cost, After By-product Credits, per Gold Ounce |
$ |
914 |
|
|
|
$ |
1,350 |
|
|
|
$ |
976 |
|
|
|
AISC, Before By-product Credits, per Gold Ounce |
$ |
1,201 |
|
|
|
$ |
1,476 |
|
|
|
$ |
1,241 |
|
|
|
By-product credits per gold ounce |
(5 |
) |
|
|
(26 |
) |
|
|
(8 |
) |
|
||||
AISC, After By-product Credits, per Gold Ounce |
$ |
1,196 |
|
|
|
$ |
1,450 |
|
|
|
$ |
1,233 |
|
|
In thousands (except per ounce amounts) |
Original Estimate for Twelve Months Ended December 31, 2021 |
||||||||||||||
|
Total Silver |
|
Total Gold |
|
Total |
|
|||||||||
Total cost of sales |
$ |
310,400 |
|
|
|
$ |
216,900 |
|
|
|
$ |
527,300 |
|
|
|
Depreciation, depletion and amortization |
(72,000 |
) |
|
|
(66,600 |
) |
|
|
(138,600 |
) |
|
||||
Treatment costs |
66,100 |
|
|
|
5,000 |
|
|
|
71,100 |
|
|
||||
Change in product inventory |
(5,700 |
) |
|
|
(11,000 |
) |
|
|
(16,700 |
) |
|
||||
Reclamation and other costs |
2,500 |
|
|
|
800 |
|
|
|
3,300 |
|
|
||||
Cash Cost, Before By-product Credits (1) |
301,300 |
|
|
|
145,100 |
|
|
|
446,400 |
|
|
||||
Reclamation and other costs |
3,900 |
|
|
|
600 |
|
|
|
4,500 |
|
|
||||
Exploration |
4,000 |
|
|
|
3,800 |
|
|
|
7,800 |
|
|
||||
Sustaining capital |
60,000 |
|
|
|
33,500 |
|
|
|
93,500 |
|
|
||||
General and administrative |
32,000 |
|
|
|
— |
|
|
|
32,000 |
|
|
||||
AISC, Before By-product Credits (1) |
401,200 |
|
|
|
183,000 |
|
|
|
584,200 |
|
|
||||
By-product credits: |
|
|
|
|
|
|
|||||||||
Zinc |
(84,500 |
) |
|
|
— |
|
|
|
(84,500 |
) |
|
||||
Gold |
(62,000 |
) |
|
|
— |
|
|
|
(62,000 |
) |
|
||||
Lead |
(66,900 |
) |
|
|
— |
|
|
|
(66,900 |
) |
|
||||
Silver |
|
|
(1,150 |
) |
|
|
(1,150 |
) |
|
||||||
Total By-product credits |
(213,400 |
) |
|
|
(1,150 |
) |
|
|
(214,550 |
) |
|
||||
Cash Cost, After By-product Credits |
$ |
87,900 |
|
|
|
$ |
143,950 |
|
|
|
$ |
231,850 |
|
|
|
AISC, After By-product Credits |
$ |
187,800 |
|
|
|
$ |
181,850 |
|
|
|
$ |
369,650 |
|
|
|
Divided by ounces produced |
13,450 |
|
|
|
148 |
|
|
|
|
|
|||||
Cash Cost, Before By-product Credits, per Ounce |
$ |
22.40 |
|
|
|
$ |
984 |
|
|
|
|
|
|||
By-product credits per ounce |
(15.87 |
) |
|
|
(8 |
) |
|
|
|
|
|||||
Cash Cost, After By-product Credits, per Ounce |
$ |
6.53 |
|
|
|
$ |
976 |
|
|
|
|
|
|||
AISC, Before By-product Credits, per Ounce |
$ |
29.83 |
|
|
|
$ |
1,241 |
|
|
|
|
|
|||
By-product credits per ounce |
(15.87 |
) |
|
|
(8 |
) |
|
|
|
|
|||||
AISC, After By-product Credits, per Ounce |
$ |
13.96 |
|
|
|
$ |
1,233 |
|
|
|
|
|
In thousands (except per ounce amounts) |
Current Estimate for Twelve Months Ended December 31, 2021 |
|||||||||||||||||
|
Greens
|
|
Lucky Friday |
|
San
|
|
Corporate(3) |
|
Total Silver |
|||||||||
Total cost of sales |
$ |
213,000 |
|
|
$ |
90,400 |
|
|
$ |
— |
|
|
|
|
$ |
303,400 |
|
|
Depreciation, depletion and amortization |
(55,000) |
|
|
(26,000) |
|
|
— |
|
|
|
|
(81,000) |
|
|||||
Treatment costs |
38,000 |
|
|
17,100 |
|
|
— |
|
|
|
|
55,100 |
|
|||||
Change in product inventory |
4,000 |
|
|
— |
|
|
— |
|
|
|
|
4,000 |
|
|||||
Reclamation and other costs |
4,500 |
|
|
1,000 |
|
|
— |
|
|
|
|
5,500 |
|
|||||
Cash Cost, Before By-product Credits (1) |
204,500 |
|
|
82,500 |
|
|
— |
|
|
|
|
287,000 |
|
|||||
Reclamation and other costs |
4,500 |
|
|
500 |
|
|
— |
|
|
|
|
5,000 |
|
|||||
Exploration |
4,000 |
|
|
— |
|
|
— |
|
|
|
|
4,000 |
|
|||||
Sustaining capital |
36,000 |
|
|
22,000 |
|
|
— |
|
|
|
|
58,000 |
|
|||||
General and administrative |
— |
|
|
— |
|
|
— |
|
|
34,500 |
|
|
34,500 |
|
||||
AISC, Before By-product Credits (1) |
249,000 |
|
|
105,000 |
|
|
— |
|
|
|
|
388,500 |
|
|||||
By-product credits: |
|
|
|
|
|
|
|
|
|
|||||||||
Zinc |
(86,000) |
|
|
(14,500) |
|
|
— |
|
|
|
|
(100,500) |
|
|||||
Gold |
(70,000) |
|
|
— |
|
|
— |
|
|
|
|
(70,000) |
|
|||||
Lead |
(28,000) |
|
|
(38,900) |
|
|
— |
|
|
|
|
(66,900) |
|
|||||
Total By-product credits |
(184,000) |
|
|
(53,400) |
|
|
— |
|
|
|
|
(237,400) |
|
|||||
Cash Cost, After By-product Credits |
$ |
20,500 |
|
|
$ |
29,100 |
|
|
$ |
— |
|
|
|
|
$ |
49,600 |
|
|
AISC, After By-product Credits |
$ |
65,000 |
|
|
$ |
51,600 |
|
|
$ |
— |
|
|
|
|
$ |
151,100 |
|
|
Divided by silver ounces produced |
9,850 |
|
|
3,600 |
|
|
— |
|
|
|
|
13,450 |
|
|||||
Cash Cost, Before By-product Credits, per Silver Ounce |
$ |
20.76 |
|
|
$ |
22.92 |
|
|
$ |
— |
|
|
|
|
$ |
21.34 |
|
|
By-product credits per silver ounce |
(18.68) |
|
|
(14.83) |
|
|
— |
|
|
|
|
(17.65) |
|
|||||
Cash Cost, After By-product Credits, per Silver Ounce |
$ |
2.08 |
|
|
$ |
8.09 |
|
|
$ |
— |
|
|
|
|
$ |
3.69 |
|
|
AISC, Before By-product Credits, per Silver Ounce |
$ |
25.28 |
|
|
$ |
29.17 |
|
|
$ |
— |
|
|
|
|
$ |
28.88 |
|
|
By-product credits per silver ounce |
(18.68) |
|
|
(14.83) |
|
|
— |
|
|
|
|
(17.65) |
|
|||||
AISC, After By-product Credits, per Silver Ounce |
$ |
6.60 |
|
|
$ |
14.34 |
|
|
$ |
— |
|
|
|
|
$ |
11.23 |
|
In thousands (except per ounce amounts) |
Current Estimate for Twelve Months Ended December 31, 2021 |
|||||||||||||
|
Casa Berardi |
|
Nevada
|
|
Total Gold |
|||||||||
Total cost of sales |
$ |
212,000 |
|
|
|
$ |
41,000 |
|
|
|
$ |
253,000 |
|
|
Depreciation, depletion and amortization |
(87,500 |
) |
|
|
(5,600 |
) |
|
|
(93,100 |
) |
|
|||
Treatment costs |
400 |
|
|
|
4,600 |
|
|
|
5,000 |
|
|
|||
Change in product inventory |
(9,000 |
) |
|
|
(11,600 |
) |
|
|
(20,600 |
) |
|
|||
Reclamation and other costs |
300 |
|
|
|
500 |
|
|
|
800 |
|
|
|||
Cash Cost, Before By-product Credits (1) |
116,200 |
|
|
|
28,900 |
|
|
|
145,100 |
|
|
|||
Reclamation and other costs |
500 |
|
|
|
100 |
|
|
|
600 |
|
|
|||
Exploration |
3,800 |
|
|
|
— |
|
|
|
3,800 |
|
|
|||
Sustaining capital |
31,500 |
|
|
|
2,000 |
|
|
|
33,500 |
|
|
|||
AISC, Before By-product Credits (1) |
152,000 |
|
|
|
31,000 |
|
|
|
183,000 |
|
|
|||
By-product credits: |
|
|
|
|
|
|||||||||
Silver |
(600 |
) |
|
|
(550 |
) |
|
|
(1,150 |
) |
|
|||
Total By-product credits |
(600 |
) |
|
|
(550 |
) |
|
|
(1,150 |
) |
|
|||
Cash Cost, After By-product Credits |
$ |
115,600 |
|
|
|
$ |
28,350 |
|
|
|
$ |
143,950 |
|
|
AISC, After By-product Credits |
$ |
151,400 |
|
|
|
$ |
30,450 |
|
|
|
$ |
181,850 |
|
|
Divided by gold ounces produced |
127 |
|
|
|
21 |
|
|
|
148 |
|
|
|||
Cash Cost, Before By-product Credits, per Gold Ounce |
$ |
919 |
|
|
|
$ |
1,376 |
|
|
|
$ |
984 |
|
|
By-product credits per gold ounce |
(5 |
) |
|
|
(26 |
) |
|
|
(8 |
) |
|
|||
Cash Cost, After By-product Credits, per Gold Ounce |
$ |
914 |
|
|
|
$ |
1,350 |
|
|
|
$ |
976 |
|
|
AISC, Before By-product Credits, per Gold Ounce |
$ |
1,201 |
|
|
|
$ |
1,476 |
|
|
|
$ |
1,241 |
|
|
By-product credits per gold ounce |
(5 |
) |
|
|
(26 |
) |
|
|
(8 |
) |
|
|||
AISC, After By-product Credits, per Gold Ounce |
$ |
1,196 |
|
|
|
$ |
1,450 |
|
|
|
$ |
1,233 |
|
|
In thousands (except per ounce amounts) |
Current Estimate for Twelve Months Ended December 31, 2021 |
|||||||||||
|
Total Silver |
|
Total Gold |
|
Total |
|
||||||
Total cost of sales |
$ |
303,400 |
|
|
$ |
253,000 |
|
|
$ |
556,400 |
|
|
Depreciation, depletion and amortization |
(81,000) |
|
|
(93,100) |
|
|
(174,100) |
|
||||
Treatment costs |
55,100 |
|
|
5,000 |
|
|
60,100 |
|
||||
Change in product inventory |
4,000 |
|
|
(20,600) |
|
|
(16,600) |
|
||||
Reclamation and other costs |
5,500 |
|
|
800 |
|
|
6,300 |
|
||||
Cash Cost, Before By-product Credits (1) |
287,000 |
|
|
145,100 |
|
|
432,100 |
|
||||
Reclamation and other costs |
5,000 |
|
|
600 |
|
|
5,600 |
|
||||
Exploration |
4,000 |
|
|
3,800 |
|
|
7,800 |
|
||||
Sustaining capital |
58,000 |
|
|
33,500 |
|
|
91,500 |
|
||||
General and administrative |
34,500 |
|
|
— |
|
|
34,500 |
|
||||
AISC, Before By-product Credits (1) |
388,500 |
|
|
183,000 |
|
|
571,500 |
|
||||
By-product credits: |
|
|
|
|
|
|
||||||
Zinc |
(100,500) |
|
|
— |
|
|
(100,500) |
|
||||
Gold |
(70,000) |
|
|
— |
|
|
(70,000) |
|
||||
Lead |
(66,900) |
|
|
— |
|
|
(66,900) |
|
||||
Silver |
— |
|
|
(1,150) |
|
|
(1,150) |
|
||||
Total By-product credits |
(237,400) |
|
|
(1,150) |
|
|
(238,550) |
|
||||
Cash Cost, After By-product Credits |
$ |
49,600 |
|
|
$ |
143,950 |
|
|
$ |
193,550 |
|
|
AISC, After By-product Credits |
$ |
151,100 |
|
|
$ |
181,850 |
|
|
$ |
332,950 |
|
|
Divided by ounces produced |
13,450 |
|
|
148 |
|
|
|
|
||||
Cash Cost, Before By-product Credits, per Ounce |
$ |
21.34 |
|
|
$ |
984 |
|
|
|
|
||
By-product credits per ounce |
(17.65) |
|
|
(8) |
|
|
|
|
||||
Cash Cost, After By-product Credits, per Ounce |
$ |
3.69 |
|
|
$ |
976 |
|
|
|
|
||
AISC, Before By-product Credits, per Ounce |
$ |
28.88 |
|
|
$ |
1,241 |
|
|
|
|
||
By-product credits per ounce |
(17.65) |
|
|
(8) |
|
|
|
|
||||
AISC, After By-product Credits, per Ounce |
$ |
11.23 |
|
|
$ |
1,233 |
|
|
|
|
(1) | Includes all direct and indirect operating costs related directly to the physical activities of producing metals, including mining, processing and other plant costs, third-party refining and marketing expense, on-site general and administrative costs, and royalties, after by-product revenues earned from all metals other than the primary metal produced at each unit. AISC, Before By-product Credits also includes on-site exploration, reclamation, and sustaining capital cost. |
|
|
(2) | The unionized employees at Lucky Friday were on strike from March 2017 until January 2020, and production at Lucky Friday had been limited from the start of the strike until the ramp-up was substantially completed in the fourth quarter of 2020. Costs related to ramp-up activities totaling $6.3 million, along with $1.8 million in non-cash depreciation expense, in the first quarter of 2020 have been excluded from the calculations of cost of sales and other direct production costs and depreciation, depletion and amortization, Cash Cost, Before By-product Credits, Cash Cost, After By-product Credits, AISC, Before By-product Credits, and AISC, After By-product Credits. |
|
|
(3) | AISC, Before By-product Credits for our consolidated silver properties includes corporate costs for general and administrative expense, exploration and sustaining capital. |
|
|
(4) | In late March, the Government of Quebec ordered the mining industry to reduce to minimum operations as part of the fight against the COVID-19 virus, causing us to suspend our Casa Berardi operations from approximately March 24 until April 15, when limited mining operations resumed, resulting in the reduced mill throughput. Suspension-related costs totaling $0.9 million for the first quarter of 2020 are reported in a separate line item on our consolidated statements of operations and excluded from the calculations of cost of sales and other direct production costs and depreciation, depletion and amortization and Cash Cost and AISC, After By-product Credits, per Gold Ounce. |
|
|
(5) | Production was suspended at the Hollister and Midas mines and Aurora mill in the latter part of 2019. Suspension-related costs at Nevada Operations totaling $3.6 million and $4.0 million for the first quarters of 2021 and 2020, respectively, are reported in a separate line item on our consolidated statements of operations and excluded from the calculations of cost of sales and other direct production costs and depreciation, depletion and amortization and Cash Cost and AISC, After By-product Credits, per Gold Ounce. |
Reconciliation of Net Income (Loss) Applicable to Common Stockholders (GAAP) to Adjusted Net Income (Loss) Applicable to Common Stockholders (non-GAAP)
This release refers to a non-GAAP measure of adjusted net income (loss) applicable to common stockholders and adjusted net income (loss) per share, which are indicators of our performance. They exclude certain impacts which are of a nature which we believe are not reflective of our underlying performance. Management believes that adjusted net income (loss) per common share provides investors with the ability to better evaluate our underlying operating performance.
Dollars are in thousands (except per share amounts) |
Three Months Ended March 31, |
||||||||
|
2021 |
|
|
2020 |
|
||||
Income (loss) income applicable to common stockholders (GAAP) |
$ |
18,833 |
|
|
|
$ |
(17,323 |
) |
|
Adjusting items: |
|
|
|
||||||
Gain on derivatives contracts |
(473 |
) |
|
|
(7,893 |
) |
|
||
Ramp-up and suspension costs |
4,318 |
|
|
|
12,996 |
|
|
||
Provisional price gains |
(552 |
) |
|
|
(2,610 |
) |
|
||
Environmental accruals |
2,882 |
|
|
|
— |
|
|
||
Additional interest associated with early repayment of long-term debt |
— |
|
|
|
2,902 |
|
|
||
Loss on extinguishment of debt |
— |
|
|
|
1,666 |
|
|
||
Net foreign exchange loss (gain) |
2,064 |
|
|
|
(6,636 |
) |
|
||
Unrealized loss on investments |
3,506 |
|
|
|
978 |
|
|
||
Gain on disposition of properties, plants, equipment and mineral interests |
9 |
|
|
|
(104 |
) |
|
||
Adjusted net income (loss) applicable to common stockholders |
$ |
30,587 |
|
|
|
$ |
(16,024 |
) |
|
Weighted average shares - basic |
534,101 |
|
|
|
523,215 |
|
|
||
Weighted average shares - diluted |
540,527 |
|
|
|
523,215 |
|
|
||
Basic and diluted adjusted net income (loss) per common share |
$ |
0.06 |
|
|
|
$ |
(0.03 |
) |
|
Reconciliation of Net Income (Loss) (GAAP) and Debt (GAAP) to Adjusted EBITDA (non-GAAP) and Net Debt (non-GAAP)
This release refers to the non-GAAP measures of adjusted earnings before interest, taxes, depreciation and amortization ("Adjusted EBITDA"), which is a measure of our operating performance, and net debt to adjusted EBITDA for the last 12 months (or "LTM adjusted EBITDA"), which is a measure of our ability to service our debt. Adjusted EBITDA is calculated as net income (loss) before the following items: interest expense, income and mining tax provision (benefit), depreciation, depletion, and amortization expense, acquisition costs,, foreign exchange gains and losses, unrealized gains and losses on derivative contracts, suspension-related costs, provisional price gains and losses, stock-based compensation, unrealized gains and losses on investments, provisions for closed operations, and interest and other income (expense). Net debt is calculated as total debt, which consists of the liability balances for our Senior Notes and 2021 Notes and capital leases, less the total of our cash and cash equivalents and short-term investments. Management believes that, when presented in conjunction with comparable GAAP measures, Adjusted EBITDA and net debt to LTM adjusted EBITDA are useful to investors in evaluating our operating performance and ability to meet our debt obligations. The following table reconciles net (loss) income and debt to Adjusted EBITDA and net debt:
Dollars are in thousands |
Three Months Ended March 31, |
|
Twelve Months Ended March 31, |
||||||||||||||||
|
2021 |
|
|
2020 |
|
|
2021 |
|
|
2020 |
|
||||||||
Net income (loss) |
$ |
18,971 |
|
|
|
$ |
(17,185 |
) |
|
|
$ |
19,366 |
|
|
|
$ |
(91,209 |
) |
|
Plus: Interest expense |
10,744 |
|
|
|
16,311 |
|
|
|
44,002 |
|
|
|
54,093 |
|
|
||||
Plus: Income and mining taxes |
4,634 |
|
|
|
(1,062 |
) |
|
|
5,831 |
|
|
|
(17,947 |
) |
|
||||
Plus: Depreciation, depletion and amortization |
49,331 |
|
|
|
39,666 |
|
|
|
166,795 |
|
|
|
200,397 |
|
|
||||
Plus: Acquisition costs |
— |
|
|
|
— |
|
|
|
20 |
|
|
|
632 |
|
|
||||
(Less)/Plus: Foreign exchange (gain) loss |
2,064 |
|
|
|
(6,636 |
) |
|
|
13,305 |
|
|
|
(1,533 |
) |
|
||||
(Less)/Plus: (Gain) loss on derivative contracts |
(10,962 |
) |
|
|
(10,437 |
) |
|
|
5,053 |
|
|
|
(6,623 |
) |
|
||||
Plus: Ramp-up and suspension costs |
4,318 |
|
|
|
12,996 |
|
|
|
16,233 |
|
|
|
22,269 |
|
|
||||
(Less)/Plus: Provisional price gains |
(552 |
) |
|
|
(2,610 |
) |
|
|
(5,950 |
) |
|
|
(2,683 |
) |
|
||||
Plus/(Less): (Loss) gain on disposition of properties, plants, equipment and mineral interests |
9 |
|
|
|
(104 |
) |
|
|
685 |
|
|
|
4,539 |
|
|
||||
Plus: Stock-based compensation |
500 |
|
|
|
1,219 |
|
|
|
5,739 |
|
|
|
5,307 |
|
|
||||
Plus: Provision for closed operations and environmental matters |
4,529 |
|
|
|
1,548 |
|
|
|
9,170 |
|
|
|
6,868 |
|
|
||||
Plus/(Less): Unrealized loss (gain) on investments |
3,506 |
|
|
|
978 |
|
|
|
(7,740 |
) |
|
|
3,463 |
|
|
||||
Plus: Other |
(997 |
) |
|
|
423 |
|
|
|
2,806 |
|
|
|
2,805 |
|
|
||||
Adjusted EBITDA |
$ |
86,095 |
|
|
|
$ |
35,107 |
|
|
|
$ |
275,315 |
|
|
|
$ |
180,378 |
|
|
Total debt |
|
|
|
|
$ |
525,002 |
|
|
|
$ |
690,222 |
|
|
||||||
Less: Cash, cash equivalents and short-term investments |
|
|
|
|
$ |
(139,750 |
) |
|
|
$ |
(215,715 |
) |
|
||||||
Net debt |
|
|
|
|
$ |
385,252 |
|
|
|
$ |
474,507 |
|
|
||||||
Net debt/LTM adjusted EBITDA (non-GAAP) |
|
|
|
|
1.4 |
|
|
2.6 |
|
Category: Earnings
View source version on businesswire.com: https://www.businesswire.com/news/home/20210506005366/en/
Contacts
Russell Lawlar
Senior Vice President, CFO and Treasurer
Jeanne DuPont
Senior Communication Coordinator
800-HECLA91 (800-432-5291)
Investor Relations
Email: hmc-info@hecla-mining.com
Website: www.hecla-mining.com