UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549

FORM 20-F/A
Amendment No. 4

[ ]      50.0  
                     
BURKINA FASO                    
Danfora EEP   45     17     90.0  
Kiaka EEP   245     95     90.0  
                     
GHANA                    
AAMCOL RL   233     90     50.0  
Total Area     8,691     3,356     REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR (g) OF THE SECURITIES EXCHANGE ACT OF 1934

OR

[X]  ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 FOR THE FISCAL YEAR ENDED DECEMBER 31, 2004

OR

[ ]  TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from                                         to                                                          

Commission file number: 000-49888

RANDGOLD RESOURCES LIMITED

(Exact name of Registrant as specified in its charter
and translation of Registrant's name into English)

JERSEY, CHANNEL ISLANDS

(Jurisdiction of incorporation or organization)

La Motte Chambers, La Motte Street, St. Helier, Jersey JE1 1BJ, Channel Islands

(Address of principal executive offices)

Securities registered or to be registered pursuant to Section 12(b) of the Act.


Title of each class Name of each exchange on which registered
None                             

Securities registered or to be registered pursuant to Section 12(g) of the Act.

Ordinary Shares, U.S. Dollar ten cent par value per share

(Title of Class)

American Depositary Shares

(Title of Class)

Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act.

   

Overview

In 2004, exploration activities concentrated on the conversion of mineralized material to reserves and the expansion of the amount of mineralized material at both Morila and Loulo. We continued to expand our presence within the most prospective gold belts of West and East Africa and now have operations in six African countries boasting a portfolio of 115 targets on 8,700km2 of groundholding.

The development of our second mine at Loulo is well underway and exploration continues to add long-term value to the project. Deep drilling on the Yalea orebody confirmed the underground

35




potential of the deposit and the geological model of shear-hosted mineralization as well as the identification of numerous high-grade payshoots which do not always crop out at surface, down to vertical depths of 640 meters. The drilling also closed the gap to the P125 satellite deposit forming a continuous 2.7 kilometer zone of mineralization. In addition to the mineralized material conversion work, new conceptual targets are being drilled and reconnaissance work to the south of Yalea highlights a potential for a further two kilometer strike of mineralization.

At Morila mine, a review of the data is leading to the development of a new model, where it is interpreted that the deposit locates within the high-grade metamorphic core of a contact thermal aureole.

In Senegal, a first phase of reconnaissance drilling was completed on two targets. These identified significant mineralized systems and a pipeline of advanced targets is ready for drilling in early 2005.

Exploration recommenced on two permits in Burkina Faso, Danfora and Kiaka, after an absence of four years. We made our first venture into Ghana and are currently focused on building a portfolio in the country.

Tanzania is another important focus outside Mali and Senegal, where we hold the dominant land position in the Musoma greenstone belt one of the most under explored areas in Tanzania. In the Mara belt we have a focused approach exploring for a known style of mineralization beneath recent cover basalts. Drilling has intersected sulfide-bearing rocks and gold assay results are pending. A new concept has been developed to investigate similarities in banded iron formation hosted gold mineralization to those observed in the Southern Lake Victoria goldfields. Generative work continues to develop this concept and identify further exploration opportunities.

Our portfolio of projects in West and East Africa reflects our business strategy of organic growth through exploration and its overriding objective, which is to build sustainable mining projects with significant returns. This strategy is attested to by its discovery and development track record, which includes the Morila mine and the new Loulo mine under construction, both in Mali, and the three million ounce Tongon project, currently in the prefeasibility stage in the Côte d'Ivoire. We hold a well-balanced portfolio of targets across the various levels of the resource triangle.

Mali

Loulo

The principal focus this year was the conversion of mineralized material to reserves through drill testing of the underground potential of the Yalea and Loulo 0 orebodies as well as infill drilling on satellite deposits and the development of new targets.

At the Yalea deposit a total of 68 diamond drill holes for 39,590 meters have been completed of which 12,000 meters consisted of deep drilling. Results have been received down to a maximum vertical depth of 640 meters. The deep drilling has confirmed the geological model of shear hosted mineralization and the identification of numerous high-grade payshoots which do not crop out at surface. Drilling also closed the gap with the P125 deposit and confirmed continuous mineralization over a 2.7 kilometer north-south direction. The Yalea orebody is a big mineralized system possessing characteristics similar to multi-million ounce deposits such as Obuasi and Prestea in Ghana. It is still open to depth and along strike.

The new drill data have been incorporated into a new structural study of the orebody and the results show that it is more complex than first thought. A structural contour map has been produced and the grade model superimposed. The results show that:

•  The Yalea deeps high-grade zone appears to be related to a change in dip of the orebody;
•  In the north of the orebody the mineralization appears to be controlled by an apparent south plunging oreshoot which eventually joins the steep dipping high-grade zone further south. Interestingly, the south-plunging oreshoot corresponds to the line of intersection between the north/south trending Yalea shear zone and the northeast trending Yalea – Baboto thrust;

36




•  In the south of the orebody, there appears to be a steep plunging oreshoot which corresponds to a gentle left hand flexure. However, this is based on two drill intercepts; and
•  At shallow depths within the Yalea orebody the advanced grade control RC drilling has intersected shallow dipping north plunging oreshoots which correspond to the intersection between the main Yalea shear zone and footwall spays.

Follow-up surface exploration work along the Yalea structure confirmed continuation of the mineralization southwards for a further two kilometers. Reconnaissance diamond holes were drilled to test the structure and returned encouraging intercepts of 19 meters at 1.4g/t, eight meters at 2.7g/t and five meters at 2.8g/t. Subsequently a detailed dipole – dipole induced polarisation (IP) ground geophysical survey has been completed. Initially six lines over the Yalea orebody were surveyed as an orientation study to geophysically fingerprint the deposit followed by 200 meter spaced lines tested two kilometers to the south. A moderate to good, north-south chargeability anomaly characterizes the Yalea orebody over the six lines surveyed. To the south of the orebody the anomaly disappears but is then seen to redevelop some 600 meters to 800 meters further south for a distance of about one kilometer along a similar north-south trend. This is a prime target for further exploration. One drillhole, YSDH03 drilled in the anomalous area, intersected 1.47g/t over 11 meters from 107 meters and 1.33g/t over 20 meters from 169 meters. The two lines surveyed to the north of P125 do not indicate a continuation to the north-south anomaly, suggesting that the mineralization terminates.

Modeling to the north of Yalea - P125 identified 13 target areas along a 10 kilometer strike length which will be the focus of continued generative work. A diamond hole was completed to test the first of these and intersected multiple zones of mineralization between 85 and 120 meters vertically below surface.

At Loulo 0, an 8-hole diamond drill program completed infill drilling of the Loulo 0 orebody down to vertical depths of 400 meters. Gold mineralization is hosted within a folded and tourmaline altered greywacke. High-grade payshoots of plus 6g/t are associated with brecciated quartz vein stockworks and locate along the axial planes of folds. The orebody is still open at depth and along strike.

In addition to the two main orebodies there are a series of satellite deposits where resources have been defined, namely Loulo 0 West, Loulo 2, Loulo 3, P129 and Baboto, locating within a 12 kilometer radius of the plant site. Definition drilling is required to convert the mineralized material to reserves.

Elsewhere in the Loulo region of western Mali, a heads of agreement has been signed between us and the Cooperative des Orpailleurs de Sitakili. Artisanal gold workings operate over three sub-parallel zones, each measuring three kilometers by 150 meters. Permit applications have been submitted to government authorities, and once these have been approved exploration will start. Gold mineralization is associated with felsic dykes intruding a package of sedimentary rocks along the hinge zone of an antiformal structure. Artisanal gold workings operate over three sub-parallel zones, each measuring three kilometers by 150 meters.

Morila exploitation permit

Exploration has concentrated on the identification of additional ore close to the current pit and the conversion of the mineralized material to reserves. Additionally, drilling of conceptual targets has identified hidden mineralization at depth within shallow dipping structures.

On the western margin a program of 48 diamond drill holes has been completed on the orebody extension to the north-west of the pit with the intention of upgrading this mineralized material to a reserve and incorporating this into a mine plan. Multiple flat lying mineralized zones at depths between 40 and 200 meters were intersected.

At the Samacline target, 850 meters west of the current pit, previous drilling intersected 30 meters at 7.22g/t including five meters at 31.54g/t (SAN487) and four meters at 35.99g/t (SAN270). Mineralization locates within a gentle, north to north-northeast trending antiformal hinge within the

37




main flat lying Morila shear zone. SAM001 the first follow-up hole drilled, confirmed the model and intersected two meters at 18.84g/t (from 283 meters down hole), 10 meters at 3.43g/t (from 482 meters) and seven meters at 4.47g/t (from 485 meters). A further three holes have been completed, (SAM002, SAM003 and SAM007) the results have returned multiple gold intercepts.

Morila region

In the Morila region, work to date has not identified an orebody at surface but the presence of in situ gold mineralization, gold anomalism, alteration, prospective host rocks and a structural framework suggests similarities to the setting of Morila.

The Ntiola area locates within the continuation of the Morila – Domba north-west trending structural corridor, while further to the east the Dionkala permit locates in a second sub-parallel north-west trending corridor. At the Ntiola target area 15 RC holes totaling 2,598 meters were drilled. Eleven of these holes were testing IP chargeability anomalies, while the other four tested in situ mineralization. The chargeability anomalies appear to be generated by elevated amounts of pre/syn deformational pyrite and pyrrhotite which lie as plates or needles on the foliation planes within silicified, fine to medium grained clastic sediments and greywackes. The presence of these sulfides may be related to a regional metamorphic event; they are not associated with gold.

The drilling at Ntiola Main confirms the continuation of a mineralized structure of over 600 meters strike length. Intersections in both NTRC3 and NTRC4 indicate the presence of a mineralized structure of up to 40 meters wide. Alteration in this structure appears to be similar to Morila with sulfides on fine biotite filled fractures within heavily silicified medium grained, biotite rich meta-greywackes. These sediments are steeply dipping to the west. Both garnets and andalusite are visible in previously drilled core indicating a high temperature alteration as at Morila. The presence of this structure is highly relevant at a regional scale as it suggests that Morila is not a unique system. Ntiola remains a target for further work.

On the Dionkala permit, structural and geochemical data together with the first vertical derivative magnetic data define a broad dome shaped structure with a potential flat lying core that is within two kilometers of the intrusive contact. Most of the anomalous soil geochemical points appear to plot within a 1 kilometer wide zone parallel to the foliation suggesting anomalism detected to date is focused in a single broad horizon 10 – 12 kilometers long. This together with garnet bearing sediments and patchy fine grained arsenopyrite along biotite rich foliation represents a large system within which a Morila-sized orebody could be present. A program of five RC drill holes totaling 865 meters has been completed to test conceptual targets and confirmed this model but returned weak anomalous gold values.

On the Segala permit, which is part of the OMRD joint venture to the west of Morila, data integration and interpretation have led to the development of a new model for the Nemala target. The target locates in a north-east – south-west structural corridor which deflects around a large granitic intrusion, it is cross cut by north-west and north-south structures and is intruded by dolerites, gabbros and felsic dykes. Mineralization locates in the hinge zone of an anticline with a steep plunge to the northeast. Work is currently focused on defining reconnaissance drill locations.

Senegal

The Senegal portfolio includes three permits covering 1,200km2, located within the Sabodala volcano – sedimentary belt in the east of the country. Data integration and interpretation have defined four priority targets, in addition to two which have already been drilled, for reconnaissance drilling during the current field season; Sofia, Kaviar, KB main and Makana 2. On the Tomboronkoto permit at the Tombo target drilling has identified low-grade mineralized material. The target is being placed on hold while additional targets within the portfolio are evaluated.

On the Kounemba permit five holes were drilled at Bambaraya to follow up anomalous soil samples as well as 18 meters at 2.92g/t and eight meters at 4.50g/t in trenches (BBTR002 and 003 respectively) over a strike length of plus 1,500 meters. Two holes intersected encouraging results;

38




BBDH002 24 meters at 1.75g/t of gold (from 24 meters) including 12 meters at 3.17g/t and BBDH004, 300 meters further south intersected five meters at 1.31g/t. Mineralization is associated with quartz tourmaline veins and vein breccias hosted in sheared andesitic volcanics. The prospect lies within a 020o trending segment, which forms a gentle right hand flexure, within a larger north trending shear corridor.

It is thought that dextral movement within the north trending corridor has resulted in dilational opening along the 020o trending segment. Our next round of drilling will be designed to further test this target.

At the Makana 2 target, exploration work has highlighted that a circular soil anomaly is associated with a silicified dioritic intrusive hosting disseminated sulfides and returning a trench intercept of 29 meters grading 1.1g/t. Mineralization is open eastwards but the silicified hill is concealed beneath a laterite cap rock and will be drill tested in the current field season.

The Mandinka target in the north of the permit locates within the main transcurrent shear zone and has been identified from a regional 1,000 meter by 100 meter soil sampling which returned plus 0.025 ppm gold, N030° trending soil anomaly with dimensions of plus 10 kilometers long (open towards the north beyond the permit boundary) and between 300 meters (in the south) and 1,100 meters (in the north) wide. Detailed soil sampling (200 meter by 50 meter) has been completed. The first results have been received and return two prominent north 30o gold anomalies, the first measures 5,000 meters by 500 (plus 0.05 ppm) and the second 3,600 meters by 400 meters (plus 0.05 ppm). The anomaly occurs mainly in erosional windows with incised valleys draining the area.

The lithologies encountered include volcanic and volcano-sedimentary formations of the Mako supergroup (mainly andesites, rhyolites, tuffs) and sedimentary rocks of the Dialle basin (greywackes, argillites, quartzites and gossans) intruded by granites, gabbros and pegmatites.

On the Kanoumering permit, the Sofia target locates along the Tombo-Sofia structural corridor which can be traced from Tomboronkoto in the south for 35 kilometers to Sabodala in the north. The Sofia target is identified by a N30 trending, plus 3 kilometer soil anomaly (>0.1 ppm) at the sheared contact between ultramafic and a foliated tuffaceous andesitic package. Gold mineralization locates within silicified and foliated andesitic tuffs in contact with an outcropping mylonite - jasper zone. Gold is associated with silica-fuchsite-carbonate-pyrite alteration. Trenching highlights a broad, low-grade (+1g/t) envelope within which higher-grade zones have been outlined.

The major structures in the Sabodala belt which control the gross geologic architecture are generally sub-parallel to the north-east trend of the belt itself and are interpreted to be old thrusts along which terrane accretion has occurred. Gold mineralization is closely related to a far more subtle set of belt discordant structural corridors which trend north-south especially where they have reactivated the belt parallel structures. This intersection leads to structurally favorable sites for fluid focusing and gold deposition. Exploration will be primarily focused at the intersection of these two structural trends to supply a steady stream of targets with the potential to pass our criterion of plus two million ounces.

Tanzania

We have worked hard over the last year to expand our footprint in the major gold belts of Africa. Our efforts have been rewarded in Tanzania and we now hold the dominant land position in the Musoma greenstone belt, one of the most under explored areas in Tanzania, while in the Mara belt we are exploring for a known style of mineralization beneath recent cover basalts.

Within the Mara greenstone belt, where we are in joint venture with Barrick, induced polarization (IP) geophysical surveys were completed on two permits to test for gold mineralization beneath recent cover basalts on extensions to the structures which host the Gokona, Nyabigena and Nyabirama gold deposits currently being exploited by Placer Dome. The results returned coincident resistivity and chargeability anomalies on both grids with similar magnitudes to those over the Placer Dome orebodies. Dipole IP surveys were carried out over these anomalies to provide additional depth information for the anomalies and allow three dimensional modeling and selection of drill targets. A program of 26 drill holes for a total of 2,208 meters of reverse circulation drilling has been completed.

39




On the Nyabigena South permit, 11 RC drill holes for 973 meters have been completed over the Mughusi target area, which is the structural extension of Placer Dome's Nyabirama deposit. Two holes tested flat lying reefs hosted by foliated granodiorites; no anomalous gold values were intersected. Four holes tested geophysical targets intersecting granodiorites gneiss and weak finely disseminated pyrite; gold assay results returned no anomalous values. Five holes tested combined geological and geophysical targets intersecting weak anomalous zones (10 meters at 0.07g/t and three meters at 0.91g/t) associated with bands of pyrite, carbonate and silica alteration hosted by granodiorite gneiss. The drilling, albeit very widely spaced, confirmed the geological model and identified a large system of alteration. Results have, however, returned only very weak anomalous values. All the data are being incorporated into a generative study to drive further follow-up programs.

On the Mobrama East permit, 15 RC drill holes for 1,235 meters have been drilled to test two coincident IP resistivity and chargeability anomalies, which locate along the extension to structures hosting Placer Dome's Nyabigena and Gokona deposits. These are conceptual targets due to recent rift basaltic volcanics covering the area. On the eastern anomaly the drill holes intersected moderate amounts of disseminated pyrite (up to 3%) and pyrrhotite (up to 5%) within silicified intermediate intrusives, silicified greywackes and black shales. However, there was no coincident gold mineralization and this program will be completed in the next field season.

In the Musoma belt, early-stage reconnaissance work is underway to understand geological and structural controls on mineralization in order to evaluate and progress targets within the resource triangle. A feature of the most productive belts in Tanzania is their arcuate shape which is especially apparent in the inner and outer arcs which host the Bulyanhulu and Geita deposits respectively. Gold production from Nyabigena, Gokona and Nyabirama in the Mara belt, and Buhemba in the Musoma belt, highlights the prospectivity of this region to host world-class gold deposits. Generative work continues to identify further exploration opportunities.

Burkina Faso

We recommenced exploration in Burkina Faso. The completion of regional generative models highlighted the southern part of the country as highly prospective. On the basis of this study two permits were acquired, namely Danfora and Kiaka.

The Danfora permit covers a 45km area and locates along the Banfora greenstone belt in the south-west portion of the country. Exploration has highlighted a plus two kilometer long, gold bearing N40º trending shear zone developed along the contact between basalt and volcaniclastics. Detailed field mapping has outlined a plus 60 meter wide zone of mineralization hosted within the basalts and associated with carbonate–silica–sericite–graphite alteration containing disseminated pyrite and pyrrhotite. The host rock, alteration and structural setting are very similar to Syama in Mali. Reconnaissance lithosampling returned anomalous grades. A five hole reconnaissance diamond drill program was completed at the Moussobadougou 1 target. The holes confirmed the continuity of a 60 to 80 meter wide zone of shearing and strong alteration at the contact between basalts and volcaniclastics. Within this zone multiple gold intercepts occur.

The Kiaka permit, located in the southeast of the country is at an early stage of exploration. To date mapping and rock sampling have been completed. The host rock consists of strongly foliated biotite rich schists containing disseminated arsenopyrite and pyrite, the rocks are very similar in appearance to the host rocks at Morila, but the foliation is sub-vertical. The mineralized zone presently extends for more than 2.5 kilometers and modeling is underway to prioritize drill locations.

Ghana

A partnership has been established between us and Inter-Afrique Holdings (a Ghanaian company) to identify and exploit profitable business opportunities in Ghana's gold mining sector.

Our primary focus is to build a quality portfolio of projects within Ghana.

40




Côte d'Ivoire

In Côte d'Ivoire, exploration activities are still suspended pending resolution of the current political impasse. We continue to monitor the situation and hold regular meetings with the government.

Our portfolio in the north of the country includes the Nielle permit which hosts the 3 million ounce Tongon project and complementary satellite targets within a 10 kilometer radius, the Boundiali permit where the advanced target of Tiasso locates and three reconnaissance licenses, which amount to a ground holding of some 2,628km2.

Human Resources Report

We have had a sustainable development and social responsibility strategy since our inception. This strategy forms part of and is fully integrated into our overall business strategy. In common with the business strategy, the sustainable development and social responsibility strategy is regularly updated and has evolved over the years.

Efforts have been maintained during the year to further enhance community relations and to promote and manage the social impact of mining activities on the communities surrounding our operations at Loulo, Morila and elsewhere. Our operations carry out their community development activities in close co-operation with representative local community liaison and development committees set up through consultation and co-operation between the operations and the communities, with input being sought from non-governmental organizations, aid agencies and government departments. During 2004, funds in excess of $1.2 million were allocated specifically to sustainable community development activities at Loulo, Morila, Syama and at our exploration sites.

The Morila community development trust fund became operational early in 2004.

Prior to the sale of Syama to Resolute Mining during the year, we, in partnership with US AID and the Ministry of Mines in Mali, set up and funded an agricultural scheme costing $110,000. This involved initiating several micro-agricultural family businesses such as fish farming, and the stocking of some mine dams and other water sources in the area, chicken farms, irrigated vegetable gardens and donkey rearing. In addition, we were involved in initiating a trust fund for villages surrounding Syama which was funded by an arrangement between us and the International Finance Corporation.

In Senegal, we created a special bursary award system for the University of Senegal's faculty of Earth Sciences. In Mali, we participate in a Malian mining industry bursary scheme which has sent four Malian students to South Africa for mining-related degree courses.

Mark Bristow, our chief executive, accepted an invitation to join the President of Senegal's Economic Advisory Committee. Meetings were held with government ministers in Mali, Tanzania, Senegal, Ghana, Burkina Faso and Côte d'Ivoire. The President of Burkina Faso visited our representative office in Johannesburg and Loulo was visited by the Malian Minister of Mines during the year. Such regular liaison with governments of the countries in which we operate form part of our focus on building and maintaining effective relationships.

At a national level in Mali, during calendar year 2004, an amount of $17 million was paid to the Malian government in payroll taxes, duties, royalties and dividends by our operations and a further amount of approximately $77 million was paid to Malian businesses for goods and services rendered.

Manpower

Human capital

As we develop and expand, every effort is being made to employ excellent people. Through leadership, a sense of ownership and interpersonal influence, these people are motivated to do "what needs to be done" to make us grow.

"What needs to be done" is defined by consultative strategic planning, which is refreshed at regular intervals and results in its strategy being owned by all our employees. This strategy provides

41




the foundation for the long-term plan (including manpower plans), the fundamental principles of our business, the framework for effective decision making and the action required from our people, the initiating of change and improvements and, most importantly, a rallying point. It enables us to organize our resources and optimize the application of our human capital.

In 2004, there were two significant changes in our leadership structure. Firstly, the exploration and evaluation functions were merged under the leadership of Adrian Reynolds, general manager exploration and evaluation. The new team includes exploration management, managing a very busy exploration program across six countries.

The second major change concerns the building of a top-class operational team for the Loulo mine currently being constructed. Most of the key appointments have been made ahead of the start of operations at Loulo, scheduled for 2005. Amadou Konta has been appointed general manager, becoming the first Malian to head a large gold mine in Mali.

Through involving employees in the business, motivating them and empowering them we have maintained enviable safety, health and low voluntary turnover records at its operations. Our operations have won national safety awards at Syama and Morila, have reduced the incidence of diseases such as malaria in the areas in which they operate and have maintained voluntary turnover of less than 1% per annum.

Corporate

During 2004 we employed 12 persons based in Africa and Europe.

Operational Center

Our operational center is situated in Bamako and has 15 employees that provide financial, accounting, legal and logistical services to exploration projects and mining operations in Mali and the West African region.

Exploration

Exploration had a total complement of 38 permanent and 71 fixed-term contract employees at December 2004. This number was reduced during the year with the transfer of the Mali West exploration team to the Loulo mine.

Loulo

Loulo currently employs 32 persons on a full-time basis and 119 fixed-term contractor staff, employed for the duration of the construction project, through the Malian labor broking company UPS.

Morila

While the number of permanent employees of Morila SA was stable during the year, the number of contractor employees was significantly reduced with the completion of the processing plant extension project.

Seven Bridges Trading 14 (Pty) Limited

We opened a small support subsidiary company in Johannesburg during the year to take over the administrative support services previously supplied by Randgold & Exploration. Seven Bridges employs 15 persons.

Personnel Administration

Standard performance management, job evaluation and housing procedures and systems are operating successfully. Refresher courses have been undertaken to ensure these are fully comprehended by the workforce.

42




Training and Development

This year the focus has been on management skills, slimes dam design, ore evaluation, induction and safety training.

Regulatory and Environmental Matters

Our business is subject to extensive government and environment-related controls and regulations, including the regulation of the discharge of pollutants into the environment, disturbance of and threats to endangered species and other environmental matters. Generally, compliance with these regulations requires us to obtain permits issued by government agencies. Some permits require periodic renewal or review of their conditions. We cannot predict whether we will be able to renew those permits or whether material changes in permit conditions will be imposed. To the extent that the countries in which we have exploration and mining permits have no established environmental laws, we are currently working to ensure that our operations are in compliance with environmental standards set by the World Bank in relation to air emissions and water discharges. In accordance with our stated policy, we accrue estimated environmental rehabilitation costs based on the net present value of future rehabilitation cost estimates which are recognized and provided for in the financial statements and capitalized to mining assets on initial recognition. The present value of additional environmental disturbances created are capitalized to mining assets against an increase in rehabilitation provision.

Mineral Rights

Although we believe that our exploration permits will be renewed when they expire, based on the current applicable laws in the respective countries in which we have obtained permits, we cannot assure you that those permits will be renewed on the same or similar terms, or at all. In addition, although the mining laws of Mali, Côte d'Ivoire, Senegal, Burkina Faso, Ghana and Tanzania provide a right to mine should an economic orebody be discovered on a property held under an exploration permit, we cannot assure you that the relevant government will issue a permit that would allow us to mine. All mineral rights within the countries in which we are currently prospecting are state-owned. Our interests effectively grant us the right to develop and participate in any mine development on the permit areas.

Environmental Matters

The major liabilities for environmental rehabilitation relate to the Morila mine in Mali. Although limited environmental rehabilitation regulations exist in Mali, management has adopted a responsible rehabilitation program following the standards set by the World Bank.

None

(Title of Class)

Indicate the number of outstanding shares of each of the issuer's classes of capital or common stock as of the close of the period covered by the Annual Report.

As of December 31, 2004, the Registrant had outstanding 59,226,694 ordinary shares, par value $0.05 per share.

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

[X] Yes              [ ] No        

Indicate by check mark which financial statement item the registrant has elected to follow.

[ ] Item 17      [X] Item 18

(APPLICABLE ONLY TO ISSUERS INVOLVED IN BANKRUPTCY PROCEEDINGS DURING THE PAST FIVE YEARS)

Indicate by a checkmark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.

[X] Yes              [ ] No        




This Amendment on Form 20-F/A is being filed in order to amend Randgold Resources Limited's Annual Report on Form 20-F for the fiscal year ended December 31, 2004, as originally filed with the Securities and Exchange Commission on June 29, 2005 and as amended on September 23, 2005, October 12, 2005 and October 19, 2005. This Amendment is being filed for the purpose of providing additional details to our disclosures in the financial statements attached to the original report, pursuant to comments received from the Staff of the U.S. Securities and Exchange Commission in connection with its review of our Registration Statement on Form F-3, originally filed on August 19, 2005 and amended on September 23, 2005, October 12, 2005 and October 19, 2005.

Marketing

We derive the majority of our income from the sale of gold produced by Morila in the form of dore, which we sell under an agreement with the Rand Refinery (Pty) Ltd. Under the agreement, we receive the ruling gold price on the day after dispatch, less refining and freight costs, for the gold content of the dore gold. We have only one customer with whom we have an agreement to purchase all of our gold production. The "customer" is chosen annually on a tender basis from a selected pool of accredited refineries and international banks to ensure competitive refining and freight costs. Unlike other precious metal producers, gold mines do not compete to sell their product given that the price is not controlled by the producers.

For the convenience of the reader, this Amendment includes the complete text of all Items of the Form 20-F, as amended. However, other than the amendments described above, no changes have been made to these or any other Items to the Form 20-F/A filed on October 19, 2005. This Amendment continues to speak as of the date of the original filing of the Form 20-F and, except as described above, does not purport to amend or update the information contained in the Form 20-F filed on June 29, 2005, or reflect any events that have occurred after the Form 20-F was filed.

i




Table of Contents

Glossary Of Mining Technical Terms


Index   Page No.
Item 1. Identity of Directors, Senior Management and Advisers   1  
Item 2. Offer Statistics and Expected Timetable   1  
Item 3.:0pt; margin: 0pt; text-indent: 0pt; padding-bottom: 0pt; background-color: #ffffff;">Property

Our operational mining area is comprised of Morila operations of 200 square kilometers and the Loulo mining permit of 372 square kilometers. Our exploration permits are detailed above.

Effective on October 1, 1997, we entered into a service agreement with Randgold & Exploration. Under the terms of the service agreement, Randgold & Exploration provides office accommodations,

43




payroll administration and other services from their base for our staff. On February 2, 2003, we entered into a new services agreement with Randgold & Exploration. The cost of the services under the services agreement is approximately $55,000 per month, subject to review and negotiation on a quarterly basis.

Reimbursements for fiscal 2003 amounted to $0.6 million.

We also lease offices in London, Dakar, Abidjan, Bamako, Ouagadougou, Mwanza, Accra and Jersey.

The service agreement between us and Randgold & Exploration was terminated by mutual agreement effective from the first of April 2004.

In order to continue to source certain services from South Africa, Seven Bridges Trading 14 (Proprietary) Limited, or Seven Bridges, a wholly owned subsidiary of ours was created.

We have entered into a service agreement with Seven Bridges whereby Seven Bridges will provide certain administrative services to us.

Seven Bridges charges us a monthly fee based on the total employment cost plus 50 percent.

Legal Proceedings

The dispute with Rolls-Royce relating to the failure of the Syama power plant, which it acquired on a 10 year finance lease agreement dated February 25, 2000 was settled out of court in December 2002. In terms of the settlement reached, Syama agreed to pay Rolls-Royce $5.3 million for the balance of the plant and Rolls-Royce has withdrawn all claims and litigation against Syama, us and Randgold & Exploration. Syama had paid an amount of $4 million to Rolls-Royce on December 31, 2003. Resolute assumed the outstanding balance of this settlement when it acquired the Syama mine.

We are not a party to any material legal or arbitration proceedings, nor is any of our property the subject of pending material legal proceedings.

Health and Safety Regulations

Morila has an Hygiene and Security Committee made up of elected labor and specialist management representatives, as outlined in the respective labor code. A similar structure is being implemented for Loulo. This committee designates, from its members, a consultative technical sub-committee charged with the elaboration and application of a concerted policy of improvement of health and security conditions at work. Its composition, attributions and operational modalities are determined by legal provisions and regulations.

The chairman of this committee coordinates monthly committee meetings, sets the agendas with his secretariat, monitors resolutions and signs off on committee determinations.

The committee's secretariat ensures under the supervision of the chairman that:

•  follow-up activities such as action resulting from the regular surveys and inspections are carried out; and
•  health and safety manuals and updates are distributed, posters are posted on notice boards and safety committee minutes and reports are distributed.

Morila's medical officer sits on the Hygiene and Security Committee and advises on the following:

•  working conditions improvements;
•  general hygiene on the operation;
•  ergonomics;
•  protection of workers safety in the workplace; and
•  medical checks and eye and ear testing.

44




The Hygiene and Security Committee forms, from within its membership, two consultative commissions, the Commission of Inquiry and the Educational Commission. The Commission of Inquiry:

•  investigates accidents and makes recommendations to avoid repetitions;
•  ensures plant, machinery and equipment have adequate protection to avoid injury; and
•  updates and revises safety and health manuals.

The Educational Commission:

•  provides information and training on safe practices and potential risks;
•  provides first aid training;
•  administers and promotes the safety suggestion scheme; and
•  explains, where necessary, the contents of the safety and health manual.

All employees are covered by the state's social security scheme and our medical reimbursement scheme, that reimburses a large portion of expenses related to medical treatment and medicines. Dental and optical expenses are also covered to 50%.

45




A.    ORGANIZATIONAL STRUCTURE

The following chart identifies our subsidiaries and our percentage ownership in each subsidiary:

Key Information   1  
Item 4. Information on the Company   12  
Item 5. Operating and Financial Review and Prospects   47  
Item 6. Directors, Senior Management and Employees   62  
Item 7. Major Shareholders and Related Party Transactions   70  
Item 8. Financial Information   72  
Item 9. The Offer and Listing   72  
Item 10. Additional Information   74  
Item 11. Quantitative and Qualitative Disclosures About Market Risk   89B.    PROPERTY, PLANT AND EQUIPMENT

For a discussion of our principal properties, including mining rights and permits, see "Item 4. Information about the Company—A. History and Development of the Company" and "Item 4. Information about the Company—B. Business Overview." We have all material legal rights necessary to entitle us to exploit such deposits in respect of the Morila mine in Mali to April 2022, and Loulo in Mali to 2029.

The exploration permits in Côte d'Ivoire, Mali and Senegal give us the exclusive right for a fixed time period, which is open to renewal, to prospect on the permit area.

Once a discovery is made, we, as the permit holder, then commence negotiations with the respective governments as to the terms of the exploration or mining concession. Depending on the country, some of the terms are more open to negotiation than other, but the critical areas which can be agreed to are the government's interest in the mine, taxation rates, repatriation of profits and the employment of expatriates and local labor.

46




Item 5.    Operating and Financial Review and Prospects

Statements in this Annual Report concerning our business outlook or future economic performance; anticipated revenues, expenses or other financial items; and statements concerning assumptions made or expectations as to any future events, conditions, performance or other matters, are "forward-looking statements" as that term is defined under the United States Federal securities laws. Forward-looking statements are subject to risks, uncertainties and other factors which could cause actual results to differ materially from those stated in such statements. Factors that could cause or contribute to such differences include, but are not limited to, those set forth under "Item 3. Key Information–D. Risk Factors" in this Annual Report as well as those discussed elsewhere in this Annual Report and in our other filings with the Securities and Exchange Commission.

General

We earn all of our revenues in U.S. dollars and the majority of our transactions and costs are denominated or based in U.S. dollars, excluding the Morila mining contract which is denominated in Euros. We also have South African Rand and Communauté Financière Africaine franc denominated costs, which are primarily wages and local material purchases.

Impact of Malian Economic and Political Environment

Our current significant operatitd>

 
Item 12. Description of Securities Other Than Equity Securities   93  
Item 13. Defaults, Dividend Arrearages and Delinquencies   93  
Item 14. Material Modification to the Rights of Security Holders and Use of Proceeds   93  

Impact of Favorable Tax Treaties

We are a Jersey incorporated company and are not subject to income taxes in Jersey.

In Mali, Morila SA is subject to a five year tax exemption which expires on November 14, 2005. Once the tax exemption expires, Morila SA will be taxed at the greater of 35% of taxable income or 0.75% of gross revenue. The benefit of this exemption was to increase our net income by $11.7 million, $22.5 million and $31.7 million for the years ended December 31, 2004, 2003 and 2002, respectively. Somilo SA also benefits from a five year tax exemption which will expire on the fifth anniversary of the first commercial production.

Revenues

Substantially all of our revenues are derived from the sale of gold. As a result, our operating results are directly related to the price of gold. Historically, the price of gold has fluctuated widely. The gold price is affected by numerous factors over which we have no control. See "Item 3. Key Information – Risk factors – The profitability of our operations, and the cash flows generated by our operations, are affected by changes in the market price for gold which in the past has fluctuated widely."

We follow a hedging strategy the aim of which is to secure a floor price which is sufficient to protect us in periods of capital expenditure and debt finance, while at the same time allowing significant exposure to the spot gold price. Accordingly, we have made use of hedging arrangements. In addition, in terms of the Morila project loan, we were required to hedge fifty percent of approximately thirty six percent of Morila's first five years of production. These hedges were closed out during the year.

Our financing arrangements for the development of Loulo includes provisions for gold price protection. At March 31, 2005, 365,000 ounces had b" valign="bottom" colspan="3">Item 15.

Controls and Procedures   93  
Item 16. Reserved Significant changes in the price of gold over a sustained period of time may lead us to increase or decrease our production, which could have a material adverse impact on our revenues.

47




Our Realized Gold Price

The following table sets out the average, the high and the low afternoon London Bullion Market fixing price of gold and our average U.S. dollar realized gold price during the years ended December 31, 2004, 2003, and 2002.


  Year Ended December 31,
  2004 2003 2002
  93  
Average   409     363     310  
Item 16A. Audit Committee Financial Expert   93  
Item 16B. Code of Ethics   93  
High   454     416     Item 16C. Principal Accountant Fees and Services   93  
Item 17. Financial Statements   95  
Item 18. Financial Statements   96  
Item 19. Exhibits   97  

ii




GLOSSARY OF MINING TECHNICAL TERMS

The following explanations are not intended as technical definitions, but rather are intended to assist the reader in understanding some of the terms as used in this Annual Report.


Birrimian: Geological time era, about 2.1 billion years ago.
Carbonate: A mineral typically found in quartz veins and as a product of hydrothermal alteration of sedimentary rock.
Carbon-In-Leach (CIL): 349  
Low   375     320     278  
Average realized gold price(1)   382     345     308  
            A process similar to CIP (described below) except that the ore slurries are not leached with cyanide prior to carbon loading. Instead, the leaching and carbon loading occur simultaneously.
Chalcopyrite: A mineral compound of copper, iron and sulphide.
Clastic: Rocks built up of fragments of pre-existing rocks which have been produced by the processes of weathering and erosion.
Craton: A part of the earth's crust that has attained stability and has been little deformed for a long time.
Cut-off grade: The grade at which the total profit from mining the orebodies, under a specified set of mining parameters, is maximized.
Development: Activities required to prepare for mining activities and maintain a planned production level and those costs to enable the conversion of mineralized material to reserves.
Dilution: Mixing of ore grade material with non-ore grade/waste material in the mining process.
Disseminated: A term used to describe fine particles of the ore mineral dispersed through the enclosing rock.
Dyke: A sheet-like body of igneous rock which is discordant to bedding or foliation.
       
(1) Our average realized gold price differs from the average gold price as a result of different realized prices achieved on the Morila hedge book.

Costs

Our operations currently comprise one open pit operation mined by contractors. Milling operations are undertaken by the mine. Total cash costs in the year ended December 31, 2004 made up approximately 87% of total costs and comprised mainly mining and milling costs, including, labor and consumable stores costs. Consumable stores costs include diesel and reagent costs. Contractor costs represented 41% of total cash costs, with diesel and reagent costs making up 33% of total cash costs. Direct labor costs accounted for approximately 11% of total cash costs. For a definition of cash costs, please refer to "Item 3 – Key Information".

The price of diesel acquired for the Morila operation continued to increase during the year ended December 31, 2004 which impacted negatively on the total cash costs. Should these prices increase further, this could impact significantly on total cash cost mainly as a result of the high volume of diesel consumed to generate power and to run the mining fleet. Mining contractor costs which are Euro denominated, also increased during 2004. This was exacerbated by the weakening of the dollar against the Euro which increased our reported US dollar costs.

The remainder of our total costs consists primarily of amortization and depreciation, exploration costs, interest expense and general and administration or corporate charges.

The three-year duty exemption period, ended on November 14, 2004 and duties became payable in accordance with the Malian duty regime on all imported goods. On average, it is anticipated that this will have the effect of increasing the costs of imported goods by 7%, which equates to an overall increase of 1% on total costs. Furthermore, costs will increase as the depth of mining increases.

Critical Accounting Policies

Our significant accounting policies are more fully described in note 2 to our consolidated financial statements. Some of our accounting policies require the application of significant judgment by management in selecting the appropriate assumptions for calculating financial estimates. By their nature, these judgments are subject to an inherent degree of uncertainty and are based on our historical experience, terms of existing contracts, management's view on trends in the gold mining industry and information from outside sources.

Management believes the following critical accounting policies, among others, affect its more significant judgments and estimates used in the preparation of our consolidated financial statements and could potentially impact our financial results and future financial performance.

Our significant accounting policies include those discussed below.

Joint Venture Accounting

We account for our investment in joint ventures under the benchmark treatment for joint ventures under IFRS, which involves the incorporation of our proportionate share of the joint

48




ventures' assets, liabilities, income, expenses and cash flows in the consolidated financial statements under appropriate headings. Should this method of accounting not be permitted in the future, the results of each joint venture would need to be equity accounted. This would require the recognition in the income statement, on a separate line, of our share of the joint ventures' profit or loss for the year. Our interest in the joint venture would be carried on the balance sheet at an amount which would reflect its share of the net assets of the joint venture.

EEP:

Exclusive exploration permit.
EP: Exploration permit.
Exploration: Activities associated with ascertaining the existence, location, extent or quality of mineralized material, including economic and technical evaluations of mineralized material.
Fault: A fracture or a zone of fractures within a body of rock.
Feldspar: An alumino-silicate mineral.
Fold: A flexure of planar structures within the rocks.
Foliation: A term used to describe planar arrangements of minerals or mineral bands within rocks.
Footwall: The underlying side of a fault, orebody or stope.

iii





Fragmentation: The breakage of rock during blasting in which explosive energy fractures the solid mass into pieces; the distribution of rock particle sizes after blasting.
g/t: This would result in a presentation of our balance sheet and income statement that differs significantly from the current presentation, but would have no impact on our net income or our net asset value.

Amortization of Mining Assets

Amortization charges are calculated using the units of production method and are based on tonnes processed through the plant as a percentage of total expected tonnes to be processed over the lives of our mines. A unit is considered to be produced at the time it is physically removed from the mine. The lives of the mines are based on proven and probable reserves as determined in accordance with SEC industry guide number 7. The estimate of the total expected future lives of our mines and therefore the amortization charge to operations, could be materially different from the actual amount of gold mined in the future and the actual lives of the mines due to changes in the factors used in determining our mineral reserves. These factors could include: (i) an expansion of proven and probable reserves through exploration activities; (ii) differences between estimated and actual cash costs of mining, due to differences in grade, metal recovery rates and foreign currency exchange rates; and (iii) differences between actual gold prices and gold price assumptions used in the estimation of reserves. Such changes in reserves could similarly impact the useful lives of assets depreciated on a straight-line basis, where those lives are limited to the life of the mine, which in turn is limited to the life of the proven and probable reserves.

Gram of gold per metric tonne.
Gold reserves: The gold contained within proven and probable reserves on the basis of recoverable material (reported as mill delivered tonnes and head grade).
Grade: The quantity of metal per unit mass of ore expressed as a percentage or, for gold, as grams of gold per tonne of ore.
Valuation of Long-Lived Assets

Management annually reviews the carrying value of our long-lived assets to determine whether their carrying values, as recorded in our consolidated financial statements, are appropriate. In determining if the asset can be recovered, we compare the value in use amount to the carrying amount. If the carrying amount exceeds the value in use amount, we will record an impairment charge in the income statement to write down the asset to the value in use amount. To determine the value in use amount, management makes its best estimate of the future cash inflows that will be obtained each year over the life of the mine and discounts the cash flow by a rate that is based on the time value of money adjusted for the risk associated with the applicable project. In estimating future cash flows, assets are grouped at the lowest level for which there are identifiable cash flows that are largely independent of future cash flows form other asset groups. With the exception of other mine-related exploration potential and, all assets at a particular operation are considered together for purposes of estimating future cash flows.

These reviews are based on projections of anticipated future cash flows to be generated by utilizing the long-lived assets. While management believes that these estimates of future cash flows are reasonable, different assumptions regarding projected gold prices and production costs as discussed above under amortization of mining assets could materially affect the anticipated cash flows to be generated by the long-lived assets. The ability to achieve the estimated quantities of recoverable minerals from exploration stage mineral interests involves further risks in addition to those factors applicable to mineral interests where proven and probable reserves have been identified, due to the lower level of confidence that the identified mineralized material can ultimately be mined economically.

Greenstone:

A field term used to describe any slightly metamorphosed rock.
Greywacke: Type of sedimentary rock.
Head grade: The grade of the ore as delivered to the metallurgical plant.
Hydrothermal: Pertaining to the action of hot aqueous solutions on rocks.
Igneous: Hedging and Financial Derivatives

We account for our hedging and financial derivatives in accordance with International Accounting Standard No. 39 Financial Instruments: Recognition and Measurement, or IAS 39. The determination

49




of the fair value of hedging instruments and financial derivatives, when marked-to-market, takes into account estimates such as projected interest rates unt;padding-top: 12pt; background-color: #cceeff;" align="left" valign="top" colspan="3">A rock or mineral that solidified from molten or partially molten material.

In situ: In place or within unbroken rock or still in the ground.
Intrusive: A rock produced by the emplacement and subsequent solidification of hot magma in pre-existing rock.
Kriging: An interpolation method that minimizes the estimation error in the determination of reserves.
Landsat: Spectral images of the Earth's surface.
Leaching: Dissolution of gold from the crushed and milled material, including reclaimed slime, for absorption and concentration on to the activated carbon.
Lower proterozoic: Era of geological time between 2.5 billion and 1.8 billion years before the present.
Measures: Conversion factors from metric units to U.S. units are provided below:

Metric Unit   U.S. Equivalent
1 tonne = 1 t = 1.10231 tons
1 gram = 1 g = 0.03215 ounces
1 gram per tonne = 1 g/t = 0.02917 ounces per ton
1 kilogram per tonne = 1 kg/t = 29.16642 ounces per ton
1 kilometer = 1km = 0.621371 miles
1 meter = 1m = 3.28084 feet
1 centimeter = 1cm = 3.937 inches
1 millimeter = 1mm = 0.03937 inches
1 square kilometer = 1 sq km = 0.3861 miles

iv



These estimates may differ materially from actual gold prices, interest rates and foreign currency exchange rates prevailing at the maturity dates of the hedging and financial derivatives and, therefore, may materially influence the values assigned to the hedging and financial derivatives, which may result in a charge to or an increase in our earnings at the maturity date of the hedging and financial derivatives. In addition, certain hedging and financial derivatives are accounted for as cash flow hedges, whereby the effective portion of changes in fair market value of these instruments are deferred in other reserves and will be recognized in the statements of consolidated operations when the underlying production designated as the hedged item is sold. All derivative contracts qualifying for hedge accounting are designated against the applicable portion of future production from proven and probable reserves, where management believes the forecasted transaction is probable of occurring. To the extent that management determines that such future production is no longer probable of occurring due to changes in the factors impacting the determination of reserves, as discussed above under amortization of mining assets, gains and losses deferred in other reserves would be reclassified to the statements of consolidated operations immediately.

Environmental Rehabilitation Costs

We provide for environmental rehabilitation costs and related liabilities based on our interpretations of current environmental and regulatory standards with reference to World Bank guidelines. In addition, final environmental rehabilitation obligations are estimated based on these interpretations and in line with responsible programs undertaken by similar operations elsewhere in the world, with provisions made over the expected lives of our mines. While management believes that the environmental rehabilitation provisions made are adequate and that the interpretations applied are appropriate, the amounts estimated for the future liabilities may differ materially from the costs that will actually be incurred to rehabilitate our mine sites in the future.

If management determines that an insufficient rehabilitation provision has been created, earnings will be adjusted as appropriate in the period that the determination is made.

Deferred Stripping

In general, mining costs are allocated to production costs, inventories and ore stockpiles, and are charged to mine production costs when gold is sold. However, at our open pit mines, which have diverse grades and waste-to-ore ratios over the mine, we defer the costs of waste stripping in excess of the expected pit life average stripping ratio. These mining costs, which are commonly referred to as "deferred stripping" costs, are incurred in mining activities that are generally associated with the removal of waste rock. The deferred stripping method is generally accepted in the mining industry where mining operations have diverse grades and waste-to-ore ratios; however industry practice does vary. Stripping costs (including any adjustment through the deferred stripping asset) is treated as a production cost and included in its valuation of inventory.

The expected pit life stripping ratios are recalculated annually in light of additional knowledge and changes in estimates. These ratios are calculated as the ratio of the total of waste tonnes deferred at the calculation date and future anticipated waste to be mined, to anticipated future ore to be mined. Changes in the mine plan, which will include changes in future ore and waste tonne to be mined, will therefore result in a change of the expected pit life average stripping ratio, which will impact prospectively on amounts deferred or written back.

If the expected pit life average stripping ratio is revised upwards, relatively lower stripping costs will, in the future, be deferred in each period, or a relatively higher amount of charges will be written back, thus impacting negatively upon earnings. The opposite is true when the expected pit life average stripping ratio is revised downwards, resulting in more costs being deferred and a positive impact on earnings during the period of cost deferral. Any costs deferred will be expensed in future periods over the life of the Morila mine, resulting in lower earnings in future periods. If we were to expense stripping costs as incurred, there might be greater volatility in our results of operations.

50




During 2004, a committee of the Emerging Issues Task Force ("EITF") began discussing the accounting treatment for stripping costs incurred during the production phase of a mine under U.S. GAAP. In March 2005, the EITF reached a consensus (ratified by the Financial Accounting Standards Board) that stripping costs incurred during the production phase of a mine are variable production costs that should be included in the costs of inventory produced during the period that the stripping costs are incurred. The EITF consensus is effective for the first reporting period in fiscal years beginning after December 15, 2005, with early adoption permitted. The Company will therefore adopt the consensus of the EITF for US GAAP purposes on January 1, 2006, and anticipates recording a cumulative effect of a change in accounting principle on that date. The cumulati"left">

Metamorphism: Alteration of rocks and minerals by a combination of heat, pressure and chemical processes over a long time period.
Metallurgical plant: A processing plant used to treat ore and extract the contained gold.

  2004 2003 2002
Net income as reported Metallurgy: In the context of this document, the science of extracting metals from ores and preparing them for sale.
Mill delivered tonnes: A quantity, expressed in tonnes, of ore delivered to the metallurgical plant.
Milling/mill: The comminution of the ore, although the term has come to cover the broad range of machinery inside the treatment plant where the gold is separated from the ore.
Mineable: That portion of a mineralized deposit for which extraction is technically and economically feasible.
Mineralization: The presence of a target mineral in a mass of host rock.
Mineralized material: A mineralized body which has been delineated by appropriately spaced drilling and/or underground sampling to support a sufficient tonnage and average grade of metals to warrant further exploration.
  A deposit of mineralized material does not qualify as a reserve until a comprehensive evaluation based upon unit cost, grade, recoveries, and other material factors conclude legal and economic feasibility.
Moz: Million troy ounces.
Mt: Million metric tonnes.
Open pit: Mining in which the ore is extracted from a pit. The geometry of the pit may vary with the characteristics of the orebody.
Orebody: A continuous, well-defined mass of material containing sufficient minerals of economic value to make extraction economically feasible.
Orogenic: Of or related to mountain building, such as when a belt of the Earth's crust is compressed by lateral forces to form a chain of mountains.
Ounce: One troy ounce, which equals 31.1035 grams.
Oxide: Soft, weathered rock.
Payshoot: A defined zone of economically viable mineralization.

v





Probable reserves: Reserves for which quantity and grade and/or quality are computed from information similar to that used for proven reserves, but the sites for inspection, sampling, and measurement are farther apart or are otherwise less adequately spaced. The degree of assurance, although lower than that for proven reserves, is high enough to assume continuity between points of observation.
Prospect: An area of land with insufficient data available on the mineralization to determine if it is economically recoverable, but warranting further investigation.
Prospecting license or permits: An area for which permission to explore has been granted.
PL: Prospecting License.
PLR: Prospecting License (reconnaissance).
Proven reserves: Reserves for which quantity is computed from dimensions revealed in outcrops, trenches, workings or drill holes; grade and/or quality are computed from the results of detailed sampling; and the sites for inspection, sampling and measurement are spaced so closely and the geologic character is so well defined that size, shape, depth and mineral content of reserves are well-established.
Pyrite: A brassy-colored mineral of iron sulphide (compound of iron and sulfur).
Pyrrhotite: A mineral compound of iron and sulphide.
Quartz: A mineral compound of silicon and oxygen.
Quartzite: Metamorphic rock with interlocking quartz grains displaying a mosaic texture.
Refining: The final stage of metal production in which final impurities are removed from the molten metal by introducing air and fluxes. The impurities are removed as gases or slag.
Regolith: Weathered products of fresh rock, such as soil, alluvium, colluvium, sands, and hardened oxidized materials.
Rehabilitation: The process of restoring mined land to a condition approximating its original state.
Reserve: That part of a mineral deposit which could be economically and legally extracted or produced at the time of the reserve determination.
Reverse circulation (RC) drilling: A drilling method.
Rotary Air Blast (RAB) drilling: A drilling method.
Sampling: Taking small pieces of rock at intervals along exposed mineralization for assay (to determine the mineral content).

vi





ound-color: #cceeff;" align="right" valign="bottom" colspan="1"> 
Sedimentary: Sourced from erosion of other rocks.
Shear zone: An elongated area of structural deformation.
Silica: A naturally occurring dioxide of silicon.
18,793     47,526     Stockpile: A store of unprocessed ore.
Stope: 65,728  
Adjustment to income as a result of not deferring stripping costs   (1,067   (1,620   (3,462
Net income   The underground excavation within the orebody where the main gold production takes place.
Stripping: The process of removing overburden to expose ore.
Stripping ratio: Ratio of waste material to ore material needed to be moved in an open pit mine.
Sulphide: A mineral characterized by the linkages of sulfur with a metal or semi-metal, such as pyrite or iron sulphide. Also a zone in which sulfide minerals occur.
Tailings: Finely ground rock from which valuable minerals have been extracted by milling.
Tectonic: Deformation related to orogenic events.
Tonalite: A type of igneous rock.
Tonnage: Quantities where the ton or tonne is an appropriate unit of measure. Typically used to measure reserves of gold-bearing material in situ or quantities of ore and waste material mined, transported or milled.
Tonne: One tonne is equal to 1,000 kilograms (also known as a "metric" ton).
17,726     45,906     62,266  

See "Item 5 – Operating and Financial Review and Prospects – Recent Accounting Pronouncements".

Recent Accounting Pronouncements

IFRS

Total cash costs:

Total cash costs, as defined in the Gold Institute standard, include mine production, transport and refinery costs, general and administrative costs, movement in production inventories and ore stockpiles, transfers to and from deferred stripping and royalties.
Trenching: Making elongated open-air excavations for the purposes of mapping and sampling.
Trend: The arrangement of a group of ore deposits or a geological feature or zone of similar grade occurring in a linear pattern.
Waste: Rock mined with an insufficient gold content to justify processing.
Weathered: Rock broken down by erosion.

vii




Statements in this Annual Report concerning our business outlook or future economic performance; anticipated revenues, expenses or other financial items; and statements concerning assumptions made or expectations as to any future events, conditions, performance or other matters, are "forward-looking statements" as that term is defined under the United States federal securities laws. Forward-looking statements are subject to risks, uncertainties and other factors which could cause actual results to differ materially from those stated in such statements. Factors that could cause or contribute to such differences include, but are not limited to, those set forth under Item 3. Key Information—D. Risk Factors in this Annual Report as well as those discussed elsewhere in this Annual Report and in our other filings with the Securities and Exchange Commission.

We are incorporated under the laws of Jersey, Channel Islands with the majority of our operations located in West Africa. Our books of account are maintained in U.S. dollars and our annual and interim financial statements are prepared on a historical cost basis in accordance with International Financial Reporting Standards, or IFRS. IFRS differs in significant respects from generally accepted accounting principles in the United States, or U.S. GAAP. This Annual Report includes a discussion of the relevant differences between IFRS and U.S. GAAP, and Note 24 to our consolidated financial statements included in this Annual Report sets forth a reconciliation from IFRS to U.S. GAAP of net income and shareholders' equity. We have also included in this Annual Report the audited financial information for the years ended December 31, 2004 and 2003 and 2002 of Société des Mines de Morila SA, or Morila SA. The financial information included in this Annual Report has been prepared in accordance with IFRS, and except where otherwise indicated, is presented in U.S. dollars. For a definition of cash costs, please see Item 3. Key Information—A. Selected Financial Data.

Unless the context otherwise requires, "us", "we", "our", or words of similar import, refer to Randgold Resources Limited and its subsidiaries and affiliated companies.

PART 1

Item 1.    Identity of Directors, Senior Management and Advisers

Not applicable.

Item 2.    Offer Statistics and Expected Timetable

Not applicable.

Item 3.    Key Information

A.    SELECTED FINANCIAL DATA

The following selected historical consolidated financial data have been derived from, and should be read in conjunction with the more detailed information and financial statements, including our audited consolidated financial statements for the years ended December 31, 2004, 2003, and 2002 and as at December 31, 2004 and 2003 which appear elsewhere in this Annual Report. The historical consolidated financial data as at December 31, 2001 and 2000 have been derived from our audited consolidated financial statements not included in this Annual Report.

The financial data, other than total cash costs and total cash cost per ounce, have been prepared in accordance with IFRS unless otherwise noted. Total cash costs and total cash cost per ounce are non-GAAP financial measures. For further information, refer to footnote 1 on page 3. In Note 24 to our audited consolidated financial statements, we present the principal differences between IFRS and U.S. GAAP and a reconciliation of our net income and shareholders' equity to U.S. GAAP.

1





  Year Ended
December 31,
2004
IFRS 3 – Business Combinations

All business combinations within the scope of IFRS 3 must be accounted for using the purchase method. The pooling of interests method is prohibited. Costs expected to be incurred to restructure an acquired entity's (or the acquirer's) activities must be treated as post-combination costs, unless the acquired entity has a pre-existing liability for restructuring its activities. Intangible items acquired in a business combination must be recognized as assets separately from goodwill if they meet the definition of an asset, are either separable or arise from contractual or other legal rights, and their faire value can be measure reliably. Identifiable assets acquired, and liabilities and contingent liabilities incurred or assumed, must be initially measured at faire value. Amortisation of goodwill and intangible assets with indefinite useful lives is prohibited. Instead they must be tested for impairment annually, or more frequently if events or changes in circumstances indicate a possible impairment.

Effective for the year beginning January 1, 2005

IFRS 5 – Non-current Assets Held for Sale and Discontinued Operations

IFRS 5 requires assets that are expected to be sold and meet specific criteria to be measured at the lower of carrying amount and fair value less costs to sell. Such assets should not be depreciated and should be presented separately in the balance sheet. It also requires operations that form a major line of business or area of geographical operations to be classified as discontinued when the assets in the operations are classified as held for sale. These requirements relating to assets held for sale and the timing of the classification of discontinued operations are substantially the same as the equivalent requirements in U.S. GAAP. The type of operation that can be classified as discontinued is narrower than under U.S. GAAP.

51




Effective for the year beginning January 1, 2005

Other developments – IASB

14 IAS standards were improved (1, 2, 8, 10, 16, 17, 21, 24, 27, 28, 31, 33, 36, 40) and IAS 15 withdrawn. The changes have removed accounting choices and are expected to result in better reporting. New guidelines and significantly enhanced disclosures have been introduced. Limited revisions were also made to IAS 32 and 39.

The improvements and amendments are effective for periods beginning on or after January 1, 2005. Earlier adoption is encouraged.

All changes to each individual standard must be implemented at a point – selective application is prohibited.

IFRIC Interpretations

IFRIC Interpretation 1 – Changes in Existing Decommissioning, Restoration and Similar Liabilities

This Interpretation addresses how the effect of the following events that change the measurement of an existing decommissioning, restoration or similar liability should be accounted for :

a)  a change in the estimated outflow of resources embodying economic benefits (e.g. cash flows) required to settle the obligation;
b)  a change in the current market-based discount rate as defined in paragraph 47 of IAS 37 (this includes changes in the time value of money and the risks specific to the liability); and
c)  an increase that reflects the passage of time (also referred to as the unwinding of the discount).

Effective for the year beginning January 1, 2005.

U.S. GAAP

In December 2004, the Financial Accounting Standards Board, or the FASB, issued Statement of Financial Accounting Standards No. 123R "Share-Based Payment", or FAS 123R. FAS 123R revised Statement of Financial Accounting Standards No. 123 "Accounting for Stock-Based Compensation" and supersedes Accounting Principles Board Opinion No. 25 "Accounting for Stock Issued to Employees" and its related implementation guidance. FAS 123R requires measurement and recording to the financial statements the costs of employee services received in exchange for a award of equity instruments based on the grant-date fair value of the award, recognized over the period during which an employee is required to provide service in exchange for such award. We will adopt the provisions of FAS 123R on January 1, 2006 and anticipate using the modified prospective application. Accordingly, compensation expense will be recognized for all newly granted awards and awards modified, repurchased, or cancelled after July 1, 2005. Compensation costs for the unvested portion of awards that are outstanding as of July 1, 2005 to be recognized ratably over the remaining vesting period. The compensation costs for the unvested portion of awards will be based on the fair value at date of grant as calculated for our pro forma disclosure under FAS 123. The effect on net income and earnings per share in the periods following adoption of FAS 123R are expected to be consistent with our pro forma disclosure under FAS 123, except that estimated forfeitures will be considered in the calculation of compensation expense under FAS 123R. Additionally, the actual effect on net income and earnings per share will vary depending upon the number and fair value of options granted in 2005 compared to prior years.

In November 2004, the FASB issued Statement of Financial Accounting Standards No. 151, "Inventory Costs – an amendment of ARB NO. 43, Chapter 4," which clarifies the accounting for abnormal amounts of idle facility expense, freight, handling costs and wasted material as current

52




period costs. It also requires that allocations of fixed production overheads to the costs of conversion be based on the normal capacity of the production facilities. The Statement applies to inventory costs incurred in the first fiscal year beginning after June 15, 2005. We are currently determining the impact on our financial position and results from operations.

During 2004, a committee of the EITF began discussing the accounting treatment for stripping costs incurred during the production phase of a mine. In March 2005, the EITF reached a consensus (ratified by the FASB) that stripping costs incurred during the production phase of a mien are variable production costs that should be included in the costs of inventory produced during the period that the stripping costs are incurred. The EITF consensus is effective for the first reporting period in fiscal years beginning after December 15, 2005, with early adoption permitted. We are currently evaluating the impact on our financial position and results of operations.

A.    OPERATING RESULTS

Our operating and financial review and prospects should be read in conjunction with our financial statements, accompanying notes thereto, and other financial information appearing elsewhere in this Annual Report.

Years Ended December 31, 2004 and 2003

Revenues

Total revenues decreased by $32.8 million, or 28.1%, from $116.5 million for the year ended December 31, 2003 to $83.7 millspan="3">Year Ended
December 31,
2003

Year Ended
December 31,
2002
Year Ended
December 31,
2001
Year Ended
December 31,
2000
STATEMENT OF OPERATIONS DATA: (In thousands, except per share and per ounce data)
Product Sales

From the year ended December 31, 2003 to the year ended December 31, 2004, gold sales revenues decreased by $36.2 million, or 33.1%, from $109.6 million to $73.3 million. This was mainly due to 114,897 less ounces available for sale as a result of a drop in head grade from 8.33g/t to 5.20 g/t compounded by a decrease of 3.1% in recoveries, partially offset by an increase in throughput of 7.5% and an improved average gold price per ounce of $382 for 2004 compared to $345 for 2003.

Interest Income

Interest income amounts consist primarily of interest received on cash held at banks. Interest income of $1 million for the year ended December 31, 2004, is consistent with the interest income of $1 million for the year ended December 31, 2003.

Exchange Gains

The exchange gain for the year ended December 31, 2004 of $1.0 million is lower than the exchange gain of $3.8 million, for the year ended December 31, 2003 as the prior year figure includes realized -10pt;padding-top: 0pt; background-color: #ffffff;" align="left" valign="bottom" colspan="3">Amounts in accordance with IFRS

                             
Revenues $ 83,743   $ 116,505   $ 134,651 Other Income

Other income of $1.5 million for the year ended December 31, 2004 consists mainly of cost recoveries of $0.7 million, compared to $0.9 million for the year ended December 31, 2003 and various other income received at Morila and on a corporate level.

 

$ 87,507   $ 201,385  
Operating income   35,850     77,936     100,021   Profit on sale of Syama

In April 2003, we entered into an option agreement with Resolute Mining, over our interest in the Syama Mine in Mali. In terms of the agreement, Resolute Mining was given a 12 month period in which to conduct a full due diligence over Syama.

53




On April 5, 2004, Resolute Mining exercised its option to buy our 80% interest in the Syama Mine. Resolute Mining paid us $9.9 million, resulting in a profit on sale of $7.1 million (after transaction fees of $1.2 million). Furthermore, at a gold price of more than $350 per ounce, we would receive a royalty of $10 per ounce on the first million ounces of production from Syama and $5 per ounce on the next three million ounces based on the attributable ounces acquired by Resolute Mining. No royalty has been received during the year ended December 31, 2004, since the Syama mine is still on care and maintenance.

Costs and Expenses

Total Cash Costs

The following table sets out our total ounces produced and total cash cost per ounce for the years ended December 31, 2004 and 2003 (for a definition of cash costs, please see "Item 3. Key Information – A. Selected financial data"):


  Year Ended December 31,
    31,999     1,885  
Net income 2004 2003
  Ounces $ Per Ounce Ounces $ Per Ounce
Morila (40% share)   204,194   18,793 **    47,526         184     317,597     100  

From the year ended December 31, 2003 to the year ended December 31, 2004, our total cash cost per ounce increased $84 per ounce, or 84%, from $100 per ounce to $184 per ounce, as a result of decreased production ounces and increases in diesel and mining contractor costs.

Transfer to Deferred Stripping Costs

The increase in the transfer to deferred stripping costs of $0.5 million or approximately 15% from $3.5 million for the year ended December 31, 2003 to $4.0 million for the year ended December 31, 2004, was due to the relative waste stripped being more in the y#cceeff;">65,728

    17,759

Depreciation and Amortization

Depreciation and amortization charges decreased by $1.6 million, or 16% from $10.3 million for the year ended December 31, 2003 to $8.7 million for the year ended December 31, 2004. The decrease was mainly due to the reclassification of assets which took place in 2003. The charge in 2004 is therefore comparable with the charge in 2002.

 

  24,361  
Basic earnings/(loss) per share ($)   0.32 **    0.83   1.31 Interest Expense

Interest expense for the year ended December 31, 2004 was $1.6 million and $1.9 million for the year ended December 31, 2003 and comprised mainly interest on our attributable share of the Morila project financing facility. The decrease is due to the loan being fully repaid in June 2004.

(Gain)/loss on Derivative Financial Instruments

The gain on derivative financial instruments of $2.2 million for the year ended December 31, 2004 and the loss on financial instruments of $1.7 million for the year ended December 31, 2003, represents the change in the fair value between December 31, 2004 and 2003, for those derivative financial instruments that did not qualify for hedge accounting.

The Loulo instruments were previously deemed speculative for accounting purposes and any marked-to-market movements had to be accounted for through the income statement. With the completion of the final mining schedules and feasibility study, as well as credit approval of the project financing, the hedged ounces were rolled out and matched to future production. This means that the marked-to-market valuation is now accounted for in equity. The Morila hedge book was fully utilized in 2004.

54




Royalties

Royalties decreased by $2.3 million, or 31%, from $7.6 million for the year ended December 31, 2003 to $5.3 million for the year ended December 31, 2004. The decreased royalties reflect decreased gold sales.

General and Administrative Expenses

General and administrative costs comprise various expenses associated with providing administration support services to the Morila mine. These charges increased to $6.8 million for the year ended December 31, 2004 from $6.1 million for the year ended December 31, 2003 reflecting the payment of custom duties since November 2003, and an increase in site administration and environmental expenditure.

Exploration and Corporate Expenditure

Exploration and corporate expenditures were $15.5 million for the year ended December 31, 2004 and $17 million for the year ended December 31, 2003. The expenditure for both years reflects largely activities which are focused on the defining of additional mineralized materials and converting them to reserve ounces, in particular for the Loulo Project, and additional drilling programs in Senegal, the Morila region and more recently Tanzania, Burkina Faso and Ghana. The decrease in expenditure of $1.5 million from the prior year, is the result of savings in exploration related staff expenditure.

Exchange Losses

The exchange losses for the year ended December 31, 2004 of $1.4 million and $1.9 million for the year ended December 31, 2003 relate primarily to Morila and result from the weakening of the U.S. dollar against other currencies in which goods and services are denominated.

Other Expenses

Other expenses of $1.1 million for the year ended December 31, 2004 consist mainly of costs associated with the care and maintenance of Syama for the period ending March 2004 and insurance costs. Other expenses of $4.9 million for the year ended December 31, 2003 comprise operational and other costs associated with the care and maintenance of Syama, insurance costs and tax penalties paid.

Minority Interests

The minority interest for the years ended December 31, 2003 represents the net of the 20% minority share of the losses in the Syama mine and the 20% minority share of losses on the Loulo Project. No minority interest was booked in 2004, as all costs directly related to the construction of the Loulo mine were capitalized and the Syama mine was sold in April 2004.

Share – Based Payments

Shared-based expenses are as a result of our adopting IFRS 2 from January 1, 2005, in accordance with the standards provisions. The standard requires an entity to recognize share-based payment transactions in its financial statements. The effect of the change is a charge of $1.3 million for the year ended December 31, 2004. No share options were granted from November 7, 2002 to December #000000; font-weight: normal; font-style: normal;background-color: #ffffff;"> 

0.29   0.37
Fully diluted earnings per share ($)   0.31 **    Years Ended December 31, 2003 and 2002

Revenues

Total revenues decreased by $18.2 million, or 13.5%, from $134.7 million for the year ended December 31, 2002 to $116.5 million for the year ended December 31, 2003.

Product Sales

From the year ended December 31, 2002 to the year ended December 31, 2003, gold sales revenues decreased by $21.8 million, or 16.6%, from $131.4 million to $109.6 million. The effect of the lower grades, partially offset by an improved average sales price of gold per ounce of $345 compared to $308 for 2002, resulted in the reduction in revenue from gold sales.

55




Interest Income

Interest income amounts consist primarily of interest received on cash held at banks. Interest income of $1 million for the year ended December 31, 2003, compared to $0.2 million for the year ended December 31, 2002, reflected interest earned on our higher cash balances during the year.

Exchange Gains

The exchange gain for the year ended December 31, 2003 of $3.8 million is higher than the exchange gain of $2.4 million, for the year ended December 31, 2002 as it includes an unrealized exchange gain of $0.9 million and a reali" valign="bottom" colspan="1" nowrap="nowrap">0.83

  1.30   0.29   0.37
Weighted average number of shares used in computation of basic earnings per share (3)   58,870,632 Other Income

Other income of $2.1 million for the year ended December 31, 2003 consists mainly of option fees receivable of $0.7 million, reversal of the doubtful debts provision of $0.5 million and recoveries of $0.9 million, compared to $0.5 million for the year ended December 31, 2002.

Costs and Expenses

Total Cash Costs

The following table sets out our total ounces produced and total cash cost per ounce for the years ended December 31, 2003 and 2002 (for a definition of cash costs, please see "Item 3. Key Information – A. Selected financial data"):


    57,441,360
  Year Ended December 31,
  2003 2002
  Ounces   50,295,640   61,035,295   66,124,418
Weighted average number of shares used in computation of fully diluted earnings per share (3)   59,996,257     57,603,364   50,817,466   61,523,810   66,588,904
Amounts in accordance with U.S. GAAP (2)                              
Revenues               16,723     48,613  
Loss from operations before joint venture   (8,274   (24,621   (31,081   (16,703 color: #ffffff;">$ Per Ounce Ounces $ Per Ounce
Morila (40% share)   317,597     100     421,126     74  

From the year ended December 31, 2002 to the year ended December 31, 2003, our total cash cost per ounce increased $26 per ounce, or 35%, from $74 per ounce to $100 per ounce, as a result of decreased production and increases in diesel and mining contractor costs.

Transfer to Deferred Stripping Costs

The decrease in the transfer to deferred stripping costs of $1.5 million or approximately 30% from $5 million for the year ended December 31, 2002 to $3.5 million for the year ended December 31, 2003, was due to the actual waste stripped being less in the year ended December 31, 2003 than in the year ended December 31, 2002 but still in excess of the life of the mine estimated stripping ratio.

Depreciation and Amortization

Depreciation and amortization charges increased by $1.5 million, or 17% from $8.8 million for the year ended December 31, 2002 to $10.3 million for the year ended December 31, 2003. The increase was mainly due to the reclassification of assets in the fixed asset register into various categories. Previously, all assets were amortized over the life of the mine. Depreciation and amortization in both years were largely related to Morila assets. There was no depreciation and amortization charge for the Syama mine as all assets had been impaired in previous years.

Interest Expense

Interest expense for the year ended December 31, 2003 was $1.9 million and comprised mainly interest on our attributable share of the Morila project financing facility.

  (15,179
Equity income of Morila joint venture   25,162     67,230   Interest expense for the year ended December 31, 2002 was $3.7 million and comprised interest on our attributable share of the Morila project financing facility as well as the $35 million syndicated loan and revolving credit facility, which was repaid during the year.

Loss on Derivative Financial Instruments

The loss on derivative financial instruments of $1.7 million for the year ended December 31, 2003 and $0.3 million for the year ended 2002, represents the change in the mark-to-market, between December 31, 2002 and 2003, for those financial instruments that did not qualify for hedge accounting.

56




The loss on financial instruments at December 31, 2003 mainly results from the mark-to-market valuation of the forward sales and forward rate agreements taken out as part of the Loulo Project financing. These have been taken out at the corporate level and are currently classified as speculative and are therefore accounted for through the profit and loss statement.

Morila has style="font-family: serif; font-size: 8pt; color: #000000; font-weight: normal; font-style: normal;background-color: #cceeff;"> 

90,522     32,482     Royalties

Royalties decreased by $1.6 million, or 17%, from $9.2 million for the year ended December 31, 2002 to $7.6 million for the year ended December 31, 2003. The decreased royalties reflect decreased gold sales.

General and Administrative Expenses

General and administrative costs comprise various expenses associated with providing administration support services to the Morila mine. These charges increased to $6.1 million for the year ended December 31, 2003 from $4.1 million for the year ended December 31, 2002 reflecting an increase in site administration, environmental expenditure and head office charges.

Exploration and Corporate Expenditure

Exploration and corporate expenditures were $17 million for the year ended December 31, 2003 and are consistent with $16.7 million for the year ended December 31, 2002. The expenditure for both years reflects largely activities which are focused on the defining of additional mineralized materials and converting them to reserve ounces, in particular for the Loulo Project, and additional drilling programs in Senegal, the Morila region and Tanzania.

Exchange Losses

The exchange losses for the year ended December 31, 2003 of $1.9 million and $1.9 million for the year ended December 31, 2002 relate primarily to Morila and result from the weakening of the U.S. dollar against other currencies in which goods and services are denominated.

7,908

 
Net income   16,888     42,960     59,661 Other Expenses

Other expenses of $4.9 million for the year ended December 31, 2003 and for the year ended December 31, 2002 of $5.7 million comprise operational and other costs associated with the care and maintenance of Syama, insurance costs and tax penalties paid.

Minority Interests

The minority interest for the years ended December 31, 2003 and 2002 represents the net of the 20% and 26% respectively minority share of the losses in the Syama mine and the 20% minority share of losses on the Loulo Project.

B.    LIQUIDITY AND CAPITAL RESOURCES

Cash Resources

Operations

 

  16,435     24,323  
Basic earnings per share ($)   0.29     0.75   1.19   0.27   0.37
Fully diluted earnings per share ($)   Net cash provided by operations was $4.3 million for the year ended December 31, 2004 and $51.2 million for the year ended December 31, 2003. The $46.9 million decrease was mainly the result of lower grades and lower production at Morila, compared to the previous year.

Net cash provided by operations was $51.2 million for the year ended December 31, 2003 and $70.6 million for the year ended December 31, 2002. The $19.4 million decrease was the result of lower grades and lower production at Morila, compared to the previous year.

Investing

0.29

    0.74   1.17   0.27   0.37
Weighted average number of shares used in computation of basic earnings per share (3)   58,870,632     57,441,360   50,295,640   61,035,295   66,124,418
Weighted average number of shares used in computation of fully diluted earnings per share (3)   59,996,257     57,603,364   50,817,466   61,523,810   66,588,904
Non-GAAP measures           Investing activities for the year ended December 31, 2004 utilized $57 million compared to $6 million utilized for the year ended December 31, 2003. This was due to development expenditure incurred in 2004 in the construction of the Loulo Mine.

57




Investing activities for the year ended December 31, 2003 utilized $6 million as compared to $5.5 million utilized for the year ended December 31, 2002. Both years represent ongoing capital expenditure at Morila.

Financing

Financing activities for the year ended December 31, 2004 generated net cash of $25.5 million compared to net cash generated of $0.6 million for the year ended December 31, 2003. The net cash generated in the year ended December 31, 2004 related mainly to the first draw down of $35 million on the Loulo Project loan in December 2004, partially offset by repayment of the Morila project loan.

Credit and Loan Facilities

 

                 
Total cash costs ($ per ounce) (1)   184     100     74     153     260  
* Reflects adjustments resulting from the sub-division of shares
** Reflects adoption of IFRS 2: Share-based payment.

  At
December 31,
2004
At
December 31,
2003
At
December 31,
2002
At
December 31,
2001
At
December 31,
2000
BALANCE SHEET AMOUNTS IN ACCORDANCE WITH IFRS                              
Total assets $ 268,461   $ 224,534   On April 7, 2000, we concluded a $90 million loan with a consortium of financial lenders led by NM Rothschild for the development of Morila. We referred to this loan as the Morila Project Loan. The loan carried interest at U.S. three month LIBOR plus 2% per annum. At December 31, 2003, the interest rate on this loan was 3.29%. The loan was scheduled to be repaid over 5 years with the first payment having been made on June 30, 2001, and was collateralized by the assets of Morila. Also, we had pledged our interest in Morila Limited and related assets and the Morila joint venture had pledged its interest in Morila and related assets to secure Morila's obligations under the Morila Project Loan Agreement. In addition to the periodic payments of principal, Morila was required to make interest payments at periodic intervals. The loan was fully repaid in June 2004.

During the year ended December 31, 2000, Morila entered into a finance lease for five Rolls-Royce generators under the terms of a Deferred Terms Agreement between us and Rolls-Royce. The lease is repayable over ten years commencing April 1, 2001 and bears interest at a variable rate of which at December 31, 2004 was approximately 20% per annum. Our attributable share of this finance lease amounted to $5.8 million at December 31, 2004 and $6.7 million at December 31, 2003. Together with AngloGold Ashanti, we have guaranteed the repayment of the lease.

Somisy and Randgold Resources Mali SARL, our subsidiaries, had a Communauté Financière Africaine franc denominated, uncollateralized overdraft facility of approximately $1.6 million with Banque de Developpement du Mali bearing interest at a fixed interest rate of 10.25% per annum at December 31, 2003. The Somisy facility was taken over by Resolute Mining as part of the sale of Syama.

On August 28, 2002, the Syama hedge transactions were closed through a cancellation agreement with NM Rothschild. On that date, we agreed to buy gold call options to offset existing positions with NM Rothschild comprised of 148,500 ounces at $353/ounce at a cost of $1,805,760. In lieu of the existing premium, NM Rothschild agreed to lend us that amount on a pre-agreed payment schedule requiring us to repay the loan monthly through the 2004 fiscal year. This loan carried interest at the relevant interbank rate plus 3%, which equated to an average rate of 4.37% at December 31, 2003. The liability was fully paid by the end of 2004.

Morila also has a finance lease with Air Liquide relating to three oxygen generating units. The lease is payable over 10 years commencing December 1, 2000 and bears interest at a variable rate which at December 31, 2004 stood at approximately 3.09%.

Somilo SA also has a $0.6 million loan from the Government of Mali. This loan is uncollateralized and bears interest at the base rate of the Central Bank of West African States plus 2% per annum. This loan is repayable from cash flows of the Loulo mine after the repayment of all other loans. At December 31, 2004, the interest rate on this loan was 7%.

The $60 million Loulo Project Loan was arranged by NM Rothschild & Sons Limited and SG Corporate & Investment Banking, who have been joined in the facility by Absa Bank and HVB Group, and is repayable between June 2006 and September 2009.

A first installment of $35 million was drawn against the project loan in December 2004. The loan is collateralized over the assets of the Loulo Project. Additionally, we have pledged our interest in

58




Randgold Resources (Somilo) Limited and related assets, and Randgold Resources (Somilo) Limited has pledged our interest in Somilo and related assets to secure Somilo's obligations under this loan. The loan is guaranteed by us until economic completion of the project has been achieved, which is expected before December 31, 2007. The loan bears interest at LIBOR plus 1.75% pre-completion of the Loulo capital program, or at any time when we continue to be a guarantor of the facility. Post completion until the fourth anniversary of signing facility documentation, the interest rate is LIBOR plus 2.10% and thereafter 2.25%. The weighted average interest rate for the year amounted to 4.17%.

Under the term of this loan, we are required to enter into certain gold price forward sales. 365,000 ounces of gold have been sold forward over the financial years 2005 to 2009, at an average forward price of $432 per ounce. The facilities are margin free.

Various debt covenants apply to the loan, including:

$ 173,858   •  Hedging arrangements reasonably acceptable to N M Rothschild & Sons Limited will remain in place. We will continue to provide evidence to the effect that we or Somilo Limited have entered into committed hedging agreements and that the proceeds of sale of gold are sufficient to ensure that, as at all calculation dates scheduled, it is and will continue to be in compliance with required financial ratio's ;
•  Limitations on material asset disposals and acquisitions;
•  Restrictions with regards to the repayment of inter-company debt or dividend payments by Somilo;
•  Maintain insurance with reputable insurance companies;
•  Establish a Debt Service Reserve Account with the minimum credit balance on all dates equal to the aggregate principal amount of and interest accruing on the loan and the aggregate amount of premium accruing in connection with the Political Risk Insurance during the six month period commencing on such date;
•  Limitations on additional indebtedness by us; and
•  Certain financial ratios need to be adhered to throughout the loan agreement.

Corporate, Exploration, Development and New Business Expenditures

Our expenditures on corporate, exploration, development and new business activities for the past three years are as follows:


"bottom" colspan="1">$
  Year Ended December 31,
  2004 2003 2002
Area (dollars in thousands)
Africa   8     190     239  
Burkina Faso   957     119,554   $ 178,471  
Long-term loans   40,718     6,832     19,307     57,147     44,071  
Share capital   2,961     2,926       944  
Mali   4,767     7,597     8,521  
  2,766     2,246     3,307  
Additional paid-in capital Tanzania   3,343     1,756      
Côte d'Ivoire   949     1,603     5,190  
Senegal   3,932     2,749     1,791  
Merger transaction costs         102,342     200,244     190,618     161,830     240,742  
Accumulated profit/(loss)   100,213     (18,580   (66,106 3,112      
Ghana   (131,834   (149,593
Other reserves     (14,347   (7,403   (8,293   (1,745   2,388  
Shareholders' equity   191,169     177,187     118,985     30,497     96,844  
                               
AMOUNTS IN ACCORDANCE WITH U.S. GAAP (2)                              
Total assets   245,026     193,458     136,789     78,107     132,587 1,589          
Total exploration and corporate expenditure   15,529     17,007  
Long-term debt       16,686  
                   

None of the above-mentioned expenditures have been capitalized.

The main focus of exploration work is on our advanced projects in Mali West, around Morila and in Senegal and more recently Tanzania, Burkina Faso and Ghana.

The Tongon project in Côte d'Ivoire is at an earlier stage of feasibility, where the data currently available is less accurate but of a sufficient level of detail for preliminary economic analysis to be

59




40,718

    6,832     19,307     57,147     44,071  
Shareholders' equity   187,253     177,187     118,771     undertaken. As a result of the political situation in Côte d'Ivoire, which started in September 2002, no further exploration activity has been possible on the project.

Contractual Obligations and Commercial Commitments

Our contractual obligations and commercial commitments consist primarily of credit facilities, as described above. The related obligations as at December 31, 2004 are set out below:


30,359     93,903  
    Contractual Obligations 1 Year 1-5 Years After 5 Years Total
                        (dollars in thousands)
Long-term debt       35,042         35,042  
Short-term borrowings                
Capital lease obligations   1,156     4,392     1,284     6,832      

2




The following table lists the costs of producing gold, determined in accordance with IFRS, and reconciles this GAAP measure to total cash costs as defined by the Gold Institute's guidance, as a non-GAAP measure, for each of the periods set forth below:


Costs Year Ended
December 31,
2004
Year Ended
December 31,
2003
Year Ended
December 31,
2002
Year Ended
December 31,
2001
Year Ended
December 31,
2000
Mine production costs   37,468     26,195     22,706     37,349     43,823  
Depreciation and amortization   8,738     10,269     8,765     7,097     12,208  
General and administration expenses   6,986     7,098     4,128     11,262  
Unconditional purchase obligations   17,119             17,119  
Total contractual cash obligations   18,275     39,434       9,332  
Transport and refinery costs   233     408     588     547     237  
Royalties   5,304     7,648     9,185     5,801     3,718  
Movement in production inventory and ore stockpiles   (8,512   (6,229   (145   1,284     58,993  
Other long-term obligations   (813   537     15,131       5,153  
Transfer to deferred stripping costs   (3,999   (3,484   (5,043   (1,991   (367
Total cost of producing gold determined in accordance with IFRS   3,701     19,369  
            46,218     41,905              

Working Capital

Management believes that our working capital resources, by way of internal sources and banking facilities, are sufficient to fund our currently foreseeable future business requirements.

C.    RESEARCH AND DEVELOPMENT, PATENTS AND LICENSES, ETC.

We are not involved in any research and development and have no registered patents or licenses.

D.    TREND INFORMATION

Our financial results are subject to the movement in gold prices. In the past fiscal year, the general trend has been upwards and this has had an impact on revenues. However it should be noted that fluctuations in the price of gold remain a distinct risk to us.

Gold Market

The gold market is relatively liquid compared with many other commodity markets, with the price of gold generally quoted in U.S. dollars. The physical demand for gold is primarily for fabrication purposes, and gold is traded on a world-wide basis. Fabricated gold has a variety of uses, including jewelry (which accounts for 85% of fabricated demand), electronics, dentistry, decorations, medals and official coins. In addition, central banks, financial institutions and private individuals buy, sell and hold gold bullion as an investment and as a store of value.

Historically, gold has been used as a store of value because it tends to retain its value in relative terms against basic goods in times of inflation and monetary crisis. Therefore, large quantities of gold in relation to annual mine production are held for this purpose. This has meant that, historically, the potential total supply of gold has been far greater than annual demand. Thus, while current supply and demand plays some part in determining the price of gold, this does not occur to the same extent as for other commodities.

Instead, gold prices have been significantly affected, from time to time, by macro-economic factors such as expectations of inflation, interest rates, exchange rates, changes in reserve policy by central banks, and global or regional political and economic crises. In times of inflation and currency devaluation, gold has traditionally been seen as refuge, leading to increased purchases of gold and a support for the price of gold.

Interest rates affect the price of gold on several levels. High real interest rates increase the cost of holding gold, and discourage physical buying in developed economies. High U.S. dollar interest rates

60




also make hedging of forward selling attractive because of the higher contango premiums (differential between LIBOR and gold lease rates) obtained in the forward prices. Increased forward selling in turn has an impact on the spot price at the time of sale.

Changes in reserve policies of central banks have affected the gold market and gold price on two levels. On the physical level, a decision by a central bank to decrease or to increase the percentage of gold in bank reserves-color: #ffffff;white-space:nowrap;" align="left" valign="bottom"> 

  40,184     59,252     74,104  
Less: Non-cash costs included in total cost of producing gold:
depreciation and amortization
  (8,738 The volatility of gold prices is illustrated in the following table, which shows the annual high, low and average of the afternoon London Bullion Market fixing price of gold in U.S. dollars for the past ten years. On December 31, 2004, the morning fixing price of gold on the London Bullion Market was $438 per ounce.


  Price Per Ounce ($)
Year High   (10,269   (8,765   Low Average
1995   396     (7,097   (12,208
Total cash costs using the Gold
institute's guidance
  372     384  
1996   415     37,480     367     388  
1997   367     283     331  
1998   313     273   31,636     31,419     52,155     294  
1999   326     253     279  
2000   61,896  
Ounces produced (our share)   204,194     313     264    "bottom" colspan="1">  317,596     421,127     298,375     279  
2001   293     256     183,225  
Total production cost per ounce under IFRS   226     132     95 271  
2002   349     278     310  
2003       199     404  
Total cash cost per ounce using Gold Institute's guidance   184     100     74     175   338
* These figures include costs for Syama at 100%. Our attributable share (including 75% of cash costs associated with Syama) amounted to $153 per ounce in 2001 and $260 in 2002.

1.    Total cash cost and total cash cost per ounce are non-GAAP measures. We have calculated total cash costs and total cash costs per ounce using guidance issued by the Gold Institute. The Gold Institute was a non profit industry association comprised of leading gold producers, refiners, bullion suppliers and manufactures. This institute has now been incorporated into the National Mining Association. The guidance was first issued in 1996 and revised in November 1999. Total cash costs, as defined in the Gold Institute's guidance, include mine production, transport and refinery costs, general and administrative costs, movement in production inventories and ore stockpiles, transfers to and from deferred stripping, and royalties. The transfer to and from deferred stripping is calculated based on the actual historical waste stripping costs, as applied to a life of mine estimated stripping ratio. The costs of waste stripping in excess of the life of mine estimated stripping ratio, are deferred, and charged to production, at the average historical cost of mining the deferred waste, when the actual stripping ratio is below the life of mine stripping ratio. The net effect is to include a proportional share of total estimated stripping costs for the life of the mine, based on the current period ore mined. Total cash costs per ounce are calculated by dividing total cash costs, as determined using the Gold Institute guidance, by gold ounces produced for the periods presented. We have calculated total cash costs and total cash costs per ounce on a consistent basis for the periods presented. Total cash costs and total cash costs per ounce should not be considered by investors as an alternative to operating profit or net profit attributable to shareholders, as an alternative to other IFRS or U.S. GAAP measures or an indicator of our performance. The data does not have a meaning prescribed by IFRS or US GAAP and therefore amounts presented may not be comparable to data presented by gold producers who do not follow the guidance provided by the Gold Institute. In particular depreciation and amortization would be included in a measure of total costs of producing gold under IFRS and U.S GAAP, but is not included in total cash costs under the guidance provided by the Gold Institute. The total cost of producing gold calculated in accordance with IFRS and U.S. GAAP would provide investors with an indication of earnings before interest expense and taxes, when compared to the average realized price. The Company has therefore provided an IFRS measure of total cash cost and total cash per ounce as required by securities regulations that govern non-GAAP performance

3




measures. Furthermore, while the Gold Institute has provided a definition for the calculation of total cash costs and total cash costs per ounce, the calculation of these numbers may vary from company to company and may not be comparable to other similarly titled measures of other companies. However, we believe that total cash costs per ounce are useful indicators to investors and management of a mining company's performance as it provides an indication of a company's profitability and efficiency, the trends in cash costs as the company's operations mature, and a benchmark of performance to allow for comparison against other companies. Within this annual report, the Company's discussion and analysis is focused on the "total cash cost" measure as defined by the Gold Institute.

2.    Under IFRS, we account for our interest in Morila Limited using the proportionate consolidation method, whereby our proportionate share of Morila Limited's assets, liabilities, income, expenses and cash flows are incorporated in our consolidated financial statements under the appropriate headings. Under U.S. GAAP, we equity account for our interest in Morila Limited. This requires that we recognize our share of Morila Limited's net income as a separate line item in the statement of operations, equity income of Morila joint venture. In the balance sheet, we reflect as an investment our share of Morila Limited's net assets. While this results in significantly different financial statement presentation between IFRS and U.S. GAAP, it has no impact on our net income or our net asset value except for any difference between IFRS and U.S. GAAP which relates to Morila.

3.    Effective June 11, 2004, we undertook a split of our ordinary shares, which increased our issued share capital from 29,273,685 to 58,547,370 ordinary shares. In connection with this share split our ordinary shareholders of record on June 11, 2004 received two (2) $0.05 ordinary shares for every one (1) $0.10 ordinary share they held. See Item 4. Information on the Company – A. History and Development of the Company.

B.    CAPITALIZATION AND INDEBTEDNESS

Not applicable.

C.    REASONS FOR THE OFFER AND USE OF PROCEEDS

Not applicable.

D.    RISK FACTORS

In addition to the other information included in this Annual Report, you should carefully consider the following factors, which individually or in combination could have a material adverse effect on our business, financial condition and results of operations.

Risks Relating to Our Business

Because we depend upon Société des Mines de Morila SA, and our interest in Morila Limited, for substantially all of our revenues and cash flow, our business will be harmed if Morila's revenues or its ability to pay dividends are adversely impacted.

We hold our ownership interest in Morila through our 50% ownership interest in Morila Limited, which in turn owns 80% of Société des Mines de Morila SA, the direct owner of Morila, or the Morila mine. During 2004, substantially all of our revenues and cash flows were derived solely from sales of gold mined at Morila, and we expect that this mine will continue to provide substantially all of our operating revenue and cash flows for at least the next twelve months. As a result, our results of operations, cash flows and financial condition could be materially and adversely affected by any of the following factors:

•  fluctuations in the price of gold realized by Morila;
•  the failure of Morila to produce expected amounts of gold; and
•  any disputes which may arise between us and AngloGold Ashanti Limited, or AngloGold Ashanti, with respect to the management of Morila Limited.

4




The profitability of our operations, and the cash flows generated by our operations, are affected by changes in the market price for gold which in the past has fluctuated widely.

Substantially all of our revenues and cash flows have come from the sale of gold. Historically, the market price for gold has fluctuated widely and has been affected by numerous factors over which we have no control, including:

•  the demand for gold for industrial uses and for use in jewelry;
•  international or regional political and economic trends;
•  the strength of the U.S. dollar, the currency in which gold prices generally are quoted, and of other currencies;
•  416     320     363  
financial market expectations regarding the rate of inflation;
•  interest rates;
•  speculative activities;
•  actual or expected purchases and sales of gold bullion holdings by central banks or other large gold bullion holders or dealers;
•  2004   454     375     409  

61




Item 6.    Directors, Senior Management and Employees

A.    DIRECTORS AND SENIOR MANAGEMENT

Our Articles of Association provide that the board must consist of no less than two and no more than 20 directors at any time. The board currently consists of 7 directors.

hedging activities by gold producers; and

•  the production and cost levels for gold in major gold-producing nations.

The volatility of gold prices is illustrated in the following table, which shows the quarterly high, low and average of the afternoon London Bullion Market fixing price of gold in U.S. dollars for the past two years and the first quarter of 2005.


    Price per ounce ($)
Year   High Low Average
2005 Our Articles of Association provide that any new director should be reelected by the shareholders at the annual general meeting following the date of the director's appointment. Furthermore, each director is subject to reelection on a rotation basis every three years as required by our Articles of Association and the Companies (Jersey) Law, 1991. Dr. D.M. Bristow and Mr. R.A. Williams' positions as executive directors were the subject of an ordinary resolution at the annual general meeting held on April 25, 2005, as requested by our Articles of Association.

According to the Articles of Association, the board meets at intervals determined by the board from time to time.

The address : serif; font-size: 10pt; color: #000000; font-weight: normal; font-style: normal;background-color: #cceeff;">First Quarter

  443.00     411.10  

Executive Directors

D. Mark Bristow (46) Chief Executive Officer. Dr Bristow was appointed a director in August 1995 and Chief Executive Officer in October 1995. A geologist with more than 22 years' experience in the mining industry, he holds a Ph. D. in Geology from Natal University, South Africa. Prior to this he held executive responsibility for the exploration and new business activities of Randgold & Exploration from 1992 to 1995. During the period 1995 to 1997 he also directed the re-engineering of the reserve management functions of the gold mining of the Randgold & Exploration Group and its affiliated gold mining companies. He has held directorships in Harmony Gold Mining Company Limited and DRD Gold Limited.

Roger A. Williams (41) Finance Director. Mr. Williams is a chartered accountant with 17 years experience in finance including eight years in the mining industry. Prior to joining us in January 1997, he was a financial manager for Kimberly-Clark of Southern Africa and an audit manager with Deloitte & Touche in the United Kingdom. In November 2001 he was appointed an alternate director and was appointed as Finance Director in April 2002.

Non-Executive Directors

Philippe Liétard (56) Non-Executive Chairman; Mr. Liétard was appointed a director in February 1998. Mr. Liétard was managing director of the Global Natural Resources Fund from 2000 to 2003. Prior to July 2000, he was director of the Oil, Gas and Mining Department of the International Finance Corporation. His experience in corporate and project finance with UBS, IFC and the World Bank extends over 30 years, most of them in the minerals business and in Africa. Mr. Liétard is now an independent consultant and a promoter of mining and energy investments. He was appointed a director in February 1998 and chairman in November 2004.

Bernard H. Asher (68) Non-Executive Director; Chairman of the audit committee and Member of the remuneration committee. 1986 – 1998, he was an executive director of HSBC Holdings plc and chairman of HSBC Holdings subsidiary, HSBC Investment Bank plc. He was chairman of Lonrho Africa plc, vice-chairman of the Court of Governors of the London School of Economics and of the Legal & General Group plc and a director of Morgan Sindall plc. He is Chairman of Lion Trust Asset Management and a senior independent director of Morgan Sindall plc. He was appointed a director in June 1997 and senior independent director in October 2003.

Jean-Antoine Cramer (73) Non-Executive Director; Member of the audit committee. Mr. Cramer was appointed a director in June 1997. Mr. Cramer was senior partner in Messieurs Cramer & Cie, a Geneva portfolio management company and was president of the Corporate Association of Geneva Investment Managers and lectures on various topics relating to politics and economics.

62




Robert I. Israel (55) Non-Executive Director; Chairman of the remuneration committee. Mr. Israel was appointed a director in June 1997. Mr. Israel is a partner at Compass Advisers, LLP. Until April 2000, Mr. Israel served as a managing director of Schroder & Co. Inc. and head of its Energy Department. He has 26 years of experience in corporate finance, especially in the natural resources sector.

Aubrey L. Paverd (66) Non-Executive Director; Member of the audit committee. Dr. Paverd was appointed a non-executive director in August 1995. He is also a director of the Peruvian mining company Cia. Minas Buenaventura. Dr. Paverd is now an independent consultant. He has 42 years of international geological experience.

Executive Officers

David Haddon (47) General Counsel and Secretary. Having overseen our administrative obligations from our incorporation in 1995, Mr. Haddon assumed full secretarial responsibility when we became listed on the London Stock Exchange in July 1997. He has over 20 years of legal and administrative experience. He assumed the responsibility as general counsel in January 2004. He is a director of Seven Bridges Trading 14 (Pty) Limited.

Bill Houston (57) General Manager — Human Resources. Mr. Houston joined us in 1992 as group training and development manager and olspan="1"> 

427.35  
2004

Amadou Konta (47) General Manager – Loulo. Amadou has a degree in civil engineering as well as several management and project management qualifications. He was appointed mine foreman and superintendent at Syama mine and served as mine manager from 1997. In 2001 he was promoted as our construction manager in Mali and was appointed Loulo general manager on October 1, 2004.

Victor Matfield (40) Manager - Corporate Finance. Mr. Matfield is a chartered accountant with 12 years experience in the mining industry. He was appointed corporate finance manager in August 2001, prior to that he served as financial manager of the Syama mine and of the Morila capital project. He is a director of Seven Bridges Trading 14 (Pty) Limited.

Chris Prinsloo (54) Group Commercial and Financial Manager. Mr. Prinsloo became Group Financial Manager in January 2002. He has 32 years of experience in the mining industry. He is a director of Somilo SA and Morila SA.

Richard Quarmby (45) Technical Manager. Mr. Quarmby is a qualified chemical engineer with extensive experience in the mining industry. He joined our metallurgical team in 1997, playing a pivotal role in the development and implementation on site of the Syama and Morila metallurgical plant designs. His responsibilities include metallurgical development through liaising with partner consultants and evaluating all technical and economic implications with the aid of both proprietary and in-house developed software.

Adrian J. Reynolds (50) General Manager — Exploration and Evaluation. Mr. Reynolds has 24 years experience in the exploration and mining industries and was part of the team that developed our original strategy. He leads the exploration team and manages the evaluation of early stage and development projects. He is responsible for the Morila technical oversight and for compilation of our technical audits, due diligences and feasibility studies. He is a director of Morila Limited and Somilo SA.

Mahamadou Samake (57) General Manager — Randgold Resources Mali. Mr. Samake is the general manager of the Bamako office and is a director of our Malian subsidiaries. He is also a professor of company law at the University of Mali.

John Steele (44) General Manager — Capital Projects. Mr. Steele has overseen the capital expansion program at the Syama mine and at the beginning of July 1998, assumed the position of general manager capital projects for the Randgold Resources Group, overseeing the construction of Morila. He is a director of Somilo SA and Morila Limited and is currently leading the Loulo construction project.

63




Our Articles of Association provide that the longest serving one-third of directors retire from office at each annual general meeting. Retiring directors normally make themselves available for re-election and are re-elected at the annual general meeting on which they retire. Our officers who are also directors retire as directors in terms of the Articles of Association, but their service as officers is regulated by standard industry employment agreements.

The date of appointment, date of expiration and length of service for each of our directors is set forth in the table below:


Director Date of
Appointment
Date of Expiration
of Term
Number of Years
Service
Executive                  
D.M. Bristow   8/11/95     5/31/08     9  
R.A. Williams   5/01/02     5/31/0c="spacer.gif" height="1" width="2">                    
  Fourth Quarter   454.20     411.25     433.77  
  Third Quarter   415.65     391.40     401.30  
  Second Quarter     3  
Non-Executive       427.25     375.15                  
B.H. Asher   6/12/97     5/05/06     7  
J.A. Cramer   6/12/97     5/05/06     7  
R.I. Israel   6/12/97     5/05/07     7  
P. Liétard   2/11/98     5/05/07     6  
A.L. Paverd   7/29/95     5/05/06 393.27  
  First Quarter   425.50     390.50       9  
        408.44  
2003                    

None of our directors and executive officers was selected under any arrangements or understandings between that director or executive officer and any other person. All of our non-Executive directors, are considered independent directors.

B.    COMPENSATION

Our objective is to provide senior management, including executive directors, with a competitive remuneration package which will attract and retain executives of the highest caliber and will encourage and reward superior perftyle="font-family: serif; font-size: 10pt; color: #000000; font-weight: normal; font-style: normal;background-color: #cceeff;"> 

           
  Fourth Quarter   416.25     370.25     391.92  
  Third Quarter   390.70     342.50     363.24  
  Second Quarter   371.40     319.90     346.74  
  First Quarter   382.10     329.45   We have no liability in respect of retirement provisions for executive directors. We do, however, provide a vehicle in the form of a defined contribution fund into which employees, including executive directors, may contribute for the purpose of providing for retirement. While we make an annual contribution on behalf of our employees, we do not do so on behalf of our executive directors.

Each executive director receives a basic salary. Executive directors do not receive any fees. Executive directors are paid an annual bonus which is determined by the annual performance of our share price.

The board has accepted the recommendations of the remuneration committee relating to non-executive directors' fees. Following acceptance by the board, the recommendations were submitted to shareholders and were approved on the annual general meeting held on April 25, 2005, as follows:

•  A general retainer to all non-executive directors of $45,000;
•  An annual committee assignment fee of $25,000, with an additional premium for membership of the audit committee of $10,000;
•  The chairman of a board committee to receive a committee assignment fee of $40,000;
•  The senior independent director, in addition to the general annual retainer but in lieu of any committee assignment fee, to receive an additional $75,000;
•  The non-executive chairman, in addition to the general annual retainer but in lieu of any committee assignment fee, to receive an additional $90,000;

64




•  An award to each director of $30,000 to be translated into a number of "restricted" shares. The shares are to vest over a three year period from the date of the award, January 1, 2005. Vesting would accelerate on the following conditions:
•  Termination other than resignation or dismissal;