Page 1
background image
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
Report on Form 6-K dated March 31, 2011
Commission File Number 1-14846
AngloGold Ashanti Limited
(Name of registrant)
76 Jeppe Street
Newtown, 2001
(P.O. Box 62117, Marshalltown, 2107)
South Africa
(Address of principal executive offices)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form
20-F or Form 40-F.
Form 20-F X                Form 40-F
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by
Regulation S-T Rule 101(b)(1):
Yes                No X

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by
Regulation S-T Rule 101(b)(7):
Yes                No X

Indicate by check mark whether the registrant by furnishing the information contained in this Form
is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the
Securities Exchange Act of 1934.
Yes                No X
Enclosure: Press release
ANGLOGOLD ASHANTI MINERAL RESOURCE AND ORE
RESERVE STATEMENT 2010
background image
gold
Mineral Resource and Ore Reserve
Report 2010
pure
background image
Scope of report
AngloGold Ashanti’s Mineral Resource and Ore Reserve are reported in accordance with the minimum standards described by the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2004 Edition), and also
conform to the standards set out in the South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral
Reserves (the SAMREC Code) 2007 edition.
The Mineral Resource is inclusive of the Ore Reserve component unless otherwise stated. Note also that all Mineral Resources and
Ore Reserves listed in this document are attributable unless otherwise stated.
Information is presented either by operating region, country, mine or project. The following tables and graphs are used to illustrate
developments across AngloGold Ashanti’s operations during 2010:
Mineral Resource and Ore Reserve comparison by region, country, mine and project; development sampling results; details of
average drill-hole spacing and type; Exclusive Mineral Resource; Mineral Resource below infrastructure; Mineral Resource and
Ore Reserve by-products; year-on-year reconciliation of the Mineral Resource and Ore Reserve; Inferred Mineral Resource in business
plan; Ore Reserve modifying factors; grade tonnage information on the Mineral Resource and lists of appointed competent persons.
Topics for brief discussion include Regional Overview; Country Overview; Mineral Resource estimation; Ore Reserve estimation;
Location; Geology; Exploration and Projects.
This document, the Mineral Resource and Ore Reserve Report 2010, is a key component of the AngloGold Ashanti suite of 2010
annual reports produced to record the company’s performance regarding its finances, operations and sustainability activities for the
12 months ended 31 December 2010. Other major documents in this suite of reports are the Annual Financial Statements 2010 and
the Sustainability Review 2010, both of which are available on the corporate website, www.anglogoldashanti.com.
The Annual Financial Statements 2010 contains a summary extract of AngloGold Ashanti’s Mineral Resource and Ore Reserve.
Note: Rounding of figures in this document may result in minor computational discrepancies. Throughout this report, dollar or
$ represents US dollar unless otherwise stated. All grade tonnage graphs in this document are for Mineral Resources.
background image
P
1
Contents
Our areas of focus in this report
Corporate profile
P2
Group overview
P4
Mineral Resource by country (attributable)
P7
Exclusive Mineral Resource
by country (attributable)
P8
Ore Reserve by country (attributable)
P9
Reconciliation of Mineral Resource
P10
Reconciliation of Ore Reserve
P12
South Africa
P14
South Africa
P16
Great Noligwa
P18
Kopanang
P23
Moab Khotsong
P28
Mponeng
P37
Savuka
P44
TauTona
P48
Surface operations
P53
Uranium
P58
Continental Africa
P60
Democratic Republic of the Congo
P62
Kibali
P63
Mongbwalu
P69
Ghana
P74
Iduapriem
P75
Obuasi
P82
Guinea
P91
Siguiri
P92
Mali
P103
Morila
P104
Sadiola
P106
Yatela
P114
Namibia
P120
Navachab
P121
Tanzania
P127
Geita
P128
Australasia
P136
Australia
P138
Sunrise Dam
P139
Tropicana
P145
Americas
P150
Argentina
P152
Cerro Vanguardia
P153
Brazil
P158
AGA Mineração
P159
Serra Grande
P179
Colombia
P184
Gramalote
P185
La Colosa
P187
United States of America
P190
Cripple Creek & Victor
P191
Definitions
P196
Glossary of terms
P198
Abbreviations
P202
Administrative information
P203
background image
United States
Cripple Creek & Victor 233,000oz
Colombia
La Colosa
Gramalote
Brazil
Serra Grande
77,000oz
AGA Mineração
338,000oz
Operations
Projects
Marine exploration
Argentina
Cerro Vanguardia
194,000oz
P
2
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Corporate profile
Corporate profile
Locations of operations
Headquartered in Johannesburg, South Africa,
AngloGold Ashanti has 20 operations on four
continents and several exploration programmes in
both the established and new gold-producing
regions of the world.
AngloGold Ashanti employed 62,046 people, including
contractors, in 2010 and produced 4.52Moz of gold
(2009: 4.60Moz), generating $5.3bn in sales revenue
(2009: $3.8bn). Capital expenditure in 2010 amounted
to $1,015m (2009: $1,027m). As at 31 December 2010,
AngloGold Ashanti’s Ore Reserve totalled 71.2Moz.
Each operation’s production ounces are detailed on the
map displayed.
gold
producer
A truly
of
global
background image
Mali
Morila
95,000oz
Sadiola
118,000oz
Yatela
60,000oz
Guinea
Siguiri
273,000oz
Ghana
Iduapriem
185,000oz
Obuasi
317,000oz
DRC
Mongbwalu
Kibali
Namibia
Navachab 86,000oz
Tanzania
Geita
357,000oz
New Zealand
Offshore areas
Australia
Sunrise Dam
396,000oz
Tropicana
South Africa
Vaal River
Great Noligwa
132,000oz
Kopanang
305,000oz
Moab Khotsong
292,000oz
Tau Lekoa
(1)
63,000oz
Surface operations
179,000oz
West Wits
Mponeng
532,000oz
Savuka
22,000oz
TauTona
259,000oz
(1)
Sold effective 1 August 2010
South Africa
Offshore areas
P
3
background image
P
4
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Group overview
Mineral Resources and Ore Reserves are reported in accordance with the minimum standards described by the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2004 Edition), and also conform to the
standards set out in the South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves
(The SAMREC Code, 2007 edition). Mineral Resources are inclusive of the Ore Reserve component unless otherwise stated.
Mineral Resource
When the 2009 Mineral Resource is restated to exclude the sale of Tau Lekoa (6.2Moz), the Mineral Resource is reduced from
226.7Moz to 220.5Moz. The total Mineral Resource remained steady, dropping slightly from 220.5Moz in 2009 to 220.0Moz in
December 2010. A year-on-year increase of 5.8Moz occurred before the subtraction of depletion and a decrease of 0.5Moz after the
subtraction of depletion. It should be noted that changes in economic assumptions from 2009 to 2010 resulted in the Mineral
Resource increasing by 3.5Moz whilst exploration and modelling resulted in an increase of 0.7Moz. The remaining increase of 1.6Moz
resulted from various other factors. Depletions from the Mineral Resource for 2009 totalled 6.3Moz.
The Mineral Resource has been estimated at a gold price of US$1,100/oz (2009: US$1,025/oz).
Mineral Resource
Moz
Mineral Resource as at 31 December 2009
226.7
Sale of Tau Lekoa
-6.2
Restated 2009 Mineral Resource
220.5
Reductions
Great Noligwa
Due to economics and depletion
-2.4
TauTona
Transfers to Mponeng
-1.3
Siguiri
Revision to modelling procedures and increased costs
-1.0
Other
Total of non-significant changes
-3.6
Additions
Vaal River Surface
An economic study demonstrated that these tailings can
3.0
West Wits Surface
be economically reworked to recover uranium
1.3
Other
Total non-significant changes
3.5
Mineral Resource as at 31 December 2010
220.0
*
Rounding of numbers may result in computational discrepancies
Group overview
Mineral Resources and Ore Reserves
growth
underpin
{
background image
P
5
Ore Reserve
Moz
Ore Reserve as at 31 December 2009
71.4
Sale of Tau Lekoa
-0.8
Restated 2009 Ore Reserve
70.6
Reductions
Geita
Depletions and model changes
-0.9
Obuasi
Depletions and refinements to Ore Reserve estimation
-0.7
Siguiri
Remodelling in accordance with reconciliation and depletion
-0.7
TauTona
Depletion and transfers to Mponeng, minor model changes
-0.7
Other
Total non-significant changes
-1.2
Additions
Cripple Creek & Victor
MLE2 project study incorporated
1.4
Mponeng
Successful conversion drilling and minor transfers from TauTona
and Savuka
(1)
1.2
Sadiola
Additions from the Deep Sulphide project
0.8
Other
Total non-significant changes
1.3
Ore Reserve as at 31 December 2010
71.2
*
Rounding of numbers may result in computational discrepancies
(1)
Some of the Ore Reserves previously reflected against TauTona have now been transferred to Mponeng to facilitate the latter’s mine plan
Ore Reserve
When the 2009 Ore Reserve is restated to exclude Tau Lekoa (0.8Moz), the 2009 Ore Reserve is reduced from 71.4Moz to 70.6Moz.
Using the restated figure, the AngloGold Ashanti Ore Reserve increased from 70.6Moz in 2009 to 71.2Moz in December 2010.
A year-on-year increase of 6.2Moz occurred before the subtraction of 5.6Moz for depletion, resulting in an increase of 0.6Moz after
the subtraction of depletion. It should be noted that changes in the economic assumptions from 2009 to 2010 resulted in the
Ore Reserve increasing by 2.4Moz while exploration and modelling resulted in a further increase of 3.8Moz.
The Ore Reserve has been estimated using a gold price of US$850/oz (2009: US$800/oz).
background image
P
6
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Group overview
Group overview
By-products
Several by-products are recovered as a result of the processing of gold Ore Reserves. These include 21,591t of uranium oxide from
the South African operations, 443,761t of sulphur from Brazil and 34.6Moz of silver from Argentina. Details of by-product Mineral
Resources and Ore Reserves are provided later in this report.
External audit of Mineral Resource
During the course of the year and as part of the rolling audit programme, AngloGold Ashanti’s 2010 Mineral Resources at the following
operations were submitted for external audit by the Australian-based company Quantitative Group (QG):
Vaal Reef at Great Noligwa, Kopanang
Serra Grande
and Moab Khotsong mines
Cripple Creek & Victor
Cerro Vanguardia
Mongbwalu
AngloGold Ashanti’s 2010 Ore Reserves at the following operations were submitted for external audit by a number of international
consulting companies, namely:
Geita
AMC
Cripple Creek & Victor
Pincock Allen and Holt
Obuasi
AMC
Cerro Vanguardia
Xstract
Siguiri
AMC
Serra Grande
Xstract
Sunrise Dam: Underground
Optiro
AGA Mineração-Cuiabá
Xstract
The company has been informed that the audits identified no material shortcomings in the process by which AngloGold Ashanti's
Mineral Resources and Ore Reserves were evaluated. It is the company's intention to continue this process so that each of its
operations will be audited, on average, every three years.
Competent persons
The information in this report relating to Exploration Results, Mineral Resources and Ore Reserves is based on information compiled
by the Competent Persons. These individuals are identified in the operational sections of this report. The Competent Persons consent
to the inclusion of Exploration Results, Mineral Resource and Ore Reserve information in this report, in the form and context in which
it appears.
During the past decade, the company has developed and implemented a rigorous system of internal and external reviews of
Exploration Results, Mineral Resources and Ore Reserves. A documented chain of responsibility exists from the Competent Persons
at the operations to the company's Mineral Resource and Ore Reserve Steering Committee. Accordingly, the Chairman of the Mineral
Resource and Ore Reserve Steering Committee, VA Chamberlain, MSc (Mining Engineering), BSc (Hons) (Geology), MGSSA,
MAusIMM, assumes responsibility for the Mineral Resource and Ore Reserve processes for AngloGold Ashanti and is satisfied that
the Competent Persons have fulfilled their responsibilities.
background image
P
7
Mineral Resource by country (attributable)
Tonnes
Grade
Contained gold
As at 31 December 2010
Category
million
g/t
Tonnes
Moz
South Africa
Measured
26.51
15.30
405.52
13.04
Indicated
(1)
753.04
2.76
2,075.87
66.74
Inferred
40.82
13.81
563.55
18.12
Total
820.38
3.71
3,044.94
97.90
Democratic Republic of
Measured
–                          
the Congo
Indicated
59.67
3.64
217.41
6.99
Inferred
30.54
3.27
99.94
3.21
Total
90.21
3.52
317.35
10.20
Ghana
Measured
77.12
4.83
372.49
11.98
Indicated
83.38
3.82
318.84
10.25
Inferred
105.26
3.71
390.99
12.57
Total
265.76
4.07
1,082.33
34.80
Guinea
Measured
43.18
0.65
28.28
0.91
Indicated
101.78
0.77
78.19
2.51
Inferred
77.77
0.85
66.11
2.13
Total
222.73
0.77
172.58
5.55
Mali
Measured
15.52
1.36
21.17
0.68
Indicated
54.86
1.79
98.07
3.15
Inferred
19.87
1.66
32.98
1.06
Total
90.24
1.69
152.22
4.89
Namibia
Measured
23.30
0.86
20.09
0.65
Indicated
72.57
1.28
92.78
2.98
Inferred
23.33
1.13
26.41
0.85
Total
119.20
1.17
139.28
4.48
Tanzania
Measured
–                          
Indicated
80.32
3.37
270.88
8.71
Inferred
21.95
3.62
79.57
2.56
Total
102.27
3.43
350.46
11.27
Australia
Measured
34.88
1.74
60.55
1.95
Indicated
35.49
2.85
101.12
3.25
Inferred
19.84
2.90
57.63
1.85
Total
90.21
2.43
219.30
7.05
Argentina
Measured
11.12
1.50
16.63
0.53
Indicated
20.86
3.82
79.69
2.56
Inferred
10.20
3.19
32.55
1.05
Total
42.18
3.06
128.87
4.14
Brazil
Measured
11.18
6.39
71.43
2.30
Indicated
15.60
6.10
95.14
3.06
Inferred
30.80
6.81
209.73
6.74
Total
57.57
6.54
376.31
12.10
Colombia
Measured
–                           
Indicated
15.78
0.93
14.75
0.47
Inferred
414.06
0.98
406.06
13.06
Total
429.85
0.98
420.81
13.53
United States
Measured
283.04
0.78
221.76
7.13
Indicated
216.53
0.73
157.18
5.05
Inferred
79.61
0.75
59.66
1.92
Total
579.18
0.76
438.60
14.10
Total
Measured
525.84
2.32
1,217.92
39.16
Indicated
1,509.88
2.38
3,599.94
115.74
Inferred
874.07
2.32
2,025.18
65.11
Total
2,909.79
2.35
6,843.04
220.01
(1)
The reduction in grade relative to the Measured and Inferred Mineral Resource is due to the inclusion of 505Mt at 0.28g/t at tailings and rock dump
Mineral Resource.
background image
P
8
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Group overview
Group overview
Exclusive Mineral Resource by country (attributable)
Tonnes
Grade
Contained gold
As at 31 December 2010
Category
million
g/t
Tonnes
Moz
South Africa
Measured
15.29
17.73
271.14
8.72
Indicated
563.41
1.65
927.58
29.82
Inferred
19.64
18.69
367.04
11.80
Total
598.34
2.62
1,565.75
50.34
Democratic Republic of
Measured
the Congo
Indicated
26.23
2.93
76.72
2.47
Inferred
30.54
3.27
99.94
3.21
Total
56.77
3.11
176.66
5.68
Ghana
Measured
29.69
6.96
206.52
6.64
Indicated
34.46
2.45
84.26
2.71
Inferred
105.26
3.71
391.01
12.57
Total
169.41
4.02
681.79
21.92
Guinea
Measured
4.46
0.80
3.59
0.12
Indicated
34.07
0.77
26.22
0.84
Inferred
77.77
0.85
66.11
2.13
Total
116.30
0.82
95.91
3.08
Mali
Measured
4.69
0.75
3.50
0.11
Indicated
18.27
1.69
30.79
0.99
Inferred
19.09
1.70
32.37
1.04
Total
42.05
1.59
66.66
2.14
Namibia
Measured
9.03
0.58
5.24
0.17
Indicated
42.83
1.11
47.50
1.53
Inferred
23.33
1.13
26.41
0.85
Total
75.20
1.05
79.15
2.54
Tanzania
Measured
–                           –
Indicated
41.62
2.93
121.83
3.92
Inferred
21.95
3.62
79.57
2.56
Total
63.57
3.17
201.40
6.48
Australia
Measured
10.83
0.93
10.10
0.32
Indicated
12.10
2.92
35.29
1.13
Inferred
19.84
2.90
57.63
1.85
Total
42.77
2.41
103.02
3.31
Argentina
Measured
1.36
3.61
4.91
0.16
Indicated
16.70
2.20
36.72
1.18
Inferred
9.95
2.97
29.56
0.95
Total
28.01
2.54
71.18
2.29
Brazil
Measured
6.37
6.15
39.19
1.26
Indicated
8.35
6.10
50.93
1.64
Inferred
28.08
6.78
190.31
6.12
Total
42.81
6.55
280.44
9.02
Colombia
Measured
–                            –
Indicated
15.78
0.93
14.75
0.47
Inferred
414.06
0.98
406.06
13.06
Total
429.85
0.98
420.81
13.53
United States
Measured
135.85
0.75
102.38
3.29
Indicated
137.77
0.71
98.42
3.16
Inferred
69.52
0.77
53.85
1.73
Total
343.14
0.74
254.66
8.19
Total
Measured
217.57
2.97
646.57
20.79
Indicated
951.59
1.63
1,551.01
49.87
Inferred
839.05
2.15
1,799.86
57.87
Total
2,008.21
1.99
3,997.44
128.52
background image
P
9
Ore Reserve by country (attributable)
Tonnes
Grade
Contained gold
As at 31 December 2010
Category
million
g/t
Tonnes
Moz
South Africa
Proved
12.03
8.24
99.07
3.19
Probable
(1)
191.99
4.41
845.74
27.19
Total
204.02
4.63
944.81
30.38
Democratic Republic of
Proved
the Congo
Probable
33.44
4.21
140.69
4.52
Total
33.44
4.21
140.69
4.52
Ghana
Proved
44.01
3.13
137.85
4.43
Probable
49.30
4.41
217.28
6.99
Total
93.31
3.81
355.13
11.42
Guinea
Proved
39.05
0.62
24.38
0.78
Probable
67.44
0.74
49.71
1.60
Total
106.49
0.70
74.08
2.38
Mali
Proved
4.96
2.23
11.03
0.35
Probable
39.18
1.78
69.82
2.24
Total
44.14
1.83
80.86
2.60
Namibia
Proved
14.27
1.02
14.49
0.47
Probable
29.74
1.45
42.99
1.38
Total
44.01
1.31
57.48
1.85
Tanzania
Proved
–                          
Probable
40.92
3.20
131.06
4.21
Total
40.92
3.20
131.06
4.21
Australia
Proved
24.05
2.10
50.45
1.62
Probable
23.39
2.81
65.83
2.12
Total
47.44
2.45
116.28
3.74
Argentina
Proved
9.54
1.22
11.63
0.37
Probable
8.57
5.32
45.62
1.47
Total
18.10
3.16
57.25
1.84
Brazil
Proved
6.91
5.80
40.06
1.29
Probable
7.40
5.26
38.88
1.25
Total
14.30
5.52
78.94
2.54
United States
Proved
147.19
0.81
119.37
3.84
Probable
78.76
0.75
58.76
1.89
Total
225.95
0.79
178.13
5.73
Total
Proved
302.00
1.68
508.32
16.34
Probable
570.12
2.99
1,706.39
54.86
Total
872.12
2.54
2,214.71
71.20
(1)
The reduction in grade relative to the Proved Ore Reserve is due to the inclusion of 111Mt at 0.49g/t at tailings and rock dump Ore Reserve.
background image
P
10
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Group overview
Group overview
Reconciliation of Mineral Resource
as at 31 December 2010
Au Content (attributable) Moz
Previous
Gold
Metho-
Current
year
Depletion
price
Cost
Exploration
dology
Other
year
South Africa Region
Great Noligwa
6.941
-0.195
0.270
-2.471
-0.058
0.076
-0.055
4.508
Kopanang
10.036
-0.564
0.032
-0.052
-0.382
0.057
9.128
Moab Khotsong
20.452
-0.381
0.041
-0.086
0.287
20.312
Tau Lekoa
6.195
-0.083
-6.112
Vaal River Surface
1.860
-0.185
3.135
-0.010
0.085
4.886
Mponeng
49.828
-0.697
0.203
-1.435
0.002
1.648
49.549
Savuka
3.843
-0.044
-0.002
-0.249
-0.127
-0.331
3.090
TauTona
6.196
-0.304
-0.100
0.102
-0.159
-0.852
4.883
West Wits Surface
0.195
-0.007
1.342
0.002
0.010
1.543
Total
105.546
-2.46
0.546
1.766
-1.743
-0.113
-5.645
97.899
Continental Africa Region
Kibali
8.889
-0.576
0.740
-0.119
-0.171
-0.414
-0.048
8.299
Mongbwalu
2.098
-0.194
1.904
Iduapriem
4.601
-0.227
0.721
-0.322
0.500
5.273
Obuasi
29.525
-0.350
0.110
0.502
-0.262
29.525
Siguiri
6.588
-0.370
0.300
-0.643
0.035
-0.599
0.236
5.548
Morila
0.331
-0.098
0.010
0.001
0.244
Sadiola
3.755
-0.130
0.483
0.562
-0.201
0.002
4.472
Yatela
0.145
-0.071
0.039
0.055
0.004
0.006
0.178
Navachab
3.728
-0.132
0.154
-0.116
0.395
0.302
0.147
4.478
Geita
11.449
-0.425
0.535
-0.576
0.331
-0.047
11.267
Total
71.109
-2.379
2.982
-1.776
0.986
0.232
0.034
71.188
Australasia Region
Sunrise Dam
3.618
-0.360
0.044
-0.006
0.016
0.029
0.015
3.356
Tropicana
3.510
-0.687
1.007
-0.135
3.695
Total
7.128
-0.36
0.044
-0.693
1.023
-0.106
0.015
7.051
Americas Region
Cerro Vanguardia
3.884
-0.188
0.485
-0.038
4.143
AGA Mineração
10.884
-0.405
-0.054
0.603
-0.031
0.167
11.165
Serra Grande
1.029
-0.078
-0.018
0.933
Gramalote
1.086
1.086
La Colosa
12.317
0.126
12.443
CC&V
13.738
-0.483
0.721
-0.043
0.337
-0.950
0.781
14.101
Total
42.938
-1.154
0.667
-0.043
1.425
-1.037
1.074
43.871
Grand total
226.721
-6.353
4.239
-0.746
1.691
-1.024
-4.522
220.009
background image
P
11
Au Content (attributable) Moz
Net
diff
%
Comments
-2.43
-35.05
Decrease due to footprint reduction; movement from the Mineral Resource to Inventory and change in the Mineral
Resource cut-off.
-0.90
-9.04
Reclassification of the Mineral Resource; changes in structure; re-evaluation of local and macro estimates; inter-shaft
transfers and movement to Inventory.
-0.14
-0.68
The changes are all data driven. New data and changes of estimation parameters resulted in lower values.
-6.19
Tau Lekoa was sold to Simmer and Jack Ltd; effective on 1st August 2010.
3.02
162.24
Changes were mainly due to depletions; reinstatement of 3.1Moz from Inventory (due to new extraction method for
uranium) and aerial survey updates, additions and grade adjustments.
-0.27
-0.55
Model change on Elsburgs resulted in lowered values; upgrade in WUDLS; upgrade of CLR below 120 to Indicated
Mineral Resource; gain due to CLR boundary change between Mponeng, TauTona and Savuka mines.
-0.75
-19.52
Changes mainly due to lower values; depletions; reconciliation adjustment; Mponeng transfers and transfers to
Inventory.
-1.31
-21.14
The changes were mainly due to depletions; value changes; geological structure changes; intershaft transfers and
inventory changes.
1.34
691.28
Changes were mainly due to depletions; reinstatement of 1.3Moz from Inventory (due to new extraction method for
uranium) and aerial survey updates, additions and grade adjustments.
-7.64
-7.24
-0.58
-6.63
The decrease is due to corrections from old underground workings whilst a change in open pit wireframing
methodology caused a loss of Mineral Resource at the KCD pit.
-0.19
-9.24
Infill drilling allowed for an upgrade of confidence.
0.67
14.56
The increase in gold price caused the Mineral Resource open pit shell to expand.
Decrease due to depletion was offset by exploration and reclassification of Mineral Resource categories.
-1.04
-15.79
Mineral Resource was factored to reflect a change in selectivity and the observed reconciliation.
-0.08
-26.28
Mining activity is restricted to processing of stockpiles.
0.71
19.09
Increase is mainly due to successful exploration programmes in 2010 and the higher gold price used in the
optimisations.
0.03
22.76
Increase is mainly due to exploration and the higher gold price.
0.74
20.12
Exploration drilling confirmed the downplunge extension to the vein swarms in the Main and North pits.
-0.18
-1.58
The increase in gold price caused the Mineral Resource open pit shells to expand.
0.07
0.11
-0.26
-7.24
Changes largely due to depletion, with a small increase in the underground Mineral Resource due to model change.
Reduction at Golden Delicious due to reporting within an optimisation shell for the first time.
0.18
5.27
Decrease in open pit due to the use of contract mining costs rather than owner mining costs, and reporting
Havana inside pit design rather than shell. Decreases were offset by discovery of Boston Shaker and extensions to
Havana Deeps.
-0.07
-1.08
0.25
6.66
Change due to positive exploration results in 2010 (0.45Moz of gold and 10.4Moz of silver from vein resources).
0.28
2.58
Cuiabá +230,000oz (Serrotinho); Raposos -176,000oz (exclusion of low grade at N10); Morro da Glória +80,000oz
(new orebodies) and Lamego +34,000oz (Carruagem).
-0.09
-9.32
Exploration during 2010 resulted in Mineral Resource conversion but no extensions or additions to the current
orebodies.
No additional work was done since the previous year.
0.12
1.02
No additional boreholes have been drilled since the previous year, but gains are due to an additional 1g/t Au envelope
and the higher gold price that was used.
0.36
2.64
Additions from exploration and a higher gold price.
0.93
2.17
-6.71
-2.96
background image
P
12
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Group overview
Group overview
Reconciliation of Ore Reserve
as at 31 December 2010
Au Content (attributable) Moz
Previous
Model
Change in
New ounces
Scope
Current
year
Depletion
Other
change
economics     from projects
change
year
South Africa Region
Great Noligwa
1.601
-0.104
0.144
0.047
-0.388
0.114
1.415
Kopanang
3.350
-0.564
-0.167
0.487
3.106
Moab Khotsong
7.137
-0.304
-0.008
0.637
0.028
7.490
Tau Lekoa Reserve
0.798
-0.083
-0.714
Vaal River Surface
1.737
-0.184
-0.012
0.012
-0.014
1.539
Mponeng
12.716
-0.538
-0.337
0.063
2.000
13.904
Savuka
0.688
-0.022
0.666
TauTona
2.732
-0.331
-0.216
-0.160
0.030
2.056
West Wits Surface
0.183
-0.007
0.012
0.010
0.003
0.200
Total
30.942
-2.137
-1.131
0.442
-0.388
0
2.648
30.376
Continental Africa Region
Kibali Reserve
4.136
0.352
-0.141
0.277
-0.100
4.523
Iduapriem
2.397
-0.248
0.034
0.030
-0.031
0.312
2.494
Obuasi
9.648
-0.576
0.312
-0.461
8.923
Siguiri
3.073
-0.285
-0.015
-0.342
0.008
-0.057
2.382
Morila
0.321
-0.098
0.001
0.224
Sadiola
1.457
-0.208
0.123
-0.010
0.906
0.030
2.298
Yatela
0.044
-0.071
0.105
0.078
Navachab
1.625
-0.118
-0.033
0.374
1.848
Geita
5.066
-0.456
-0.043
-0.260
-0.031
-0.062
4.214
Total
27.767
-2.06
0.557
-0.434
0.213
0.906
0.036
26.984
Australasia Region
Sunrise Dam
1.728
-0.391
0.059
0.114
-0.133
1.377
Tropicana
2.311
-0.012
0.043
0.051
-0.031
2.361
Total
4.039
-0.391
0.047
0.157
0.051
0
-0.164
3.738
Americas Region
Cerro Vanguardia
1.879
-0.191
0.013
0.106
0.001
0.033
1.841
AGA Mineração
2.179
-0.363
0.264
0.094
-0.019
-0.008
2.146
Serra Grande
0.348
-0.079
-0.012
0.137
-0.002
0.392
CC&V
4.291
-0.483
0.050
1.869
5.727
Total
8.697
-1.116
0.265
0.387
-0.021
1.87
0.025
10.106
Grand total
71.445
-5.704
-0.262
0.552
-0.145
2.776
2.545
71.204
background image
P
13
Au Content (attributable) Moz
Net
diff
%
Comments
-0.18
-11.62
Reduction as a result of further restructuring of the underground mineable footprint.
-0.24
-7.28
Decrease due to depletions and model changes as a result of new information.
0.35
4.94
Increase due to model changes as a result of new information.
-0.79
Tau Lekoa was sold to Simmer and Jack Ltd; effective on 1st August 2010.
-0.19
-11.40
Decrease due to normal depletions.
1.18
9.34
Increase mainly due to inclusion of TauTona ground below 120 level and Savuka areas; upgrade of the Mineral Resource.
-0.02
-3.19
The remainder of the Savuka Ore Reserves are to be mined by Mponeng.
-0.67
-24.74
Decrease due to depletion and transfer of ground to Mponeng.
0.01
9.28
Increase due to additions to the Mponeng marginal ore dump.
-0.56
-1.82
0.38
9.35
The increase is due to an improved Mineral Resource to Ore Reserve ratio due to a re-design of the underground
mining layout by SRK Consulting.
0.09
4.04
Increase due to updates made to the higher-grade Ajopa geological model and well as the geological models for
Blocks 7 and 8 South.
-0.72
-7.51
The overall decrease is due to improved integrity of information and refinement of the processes that were used to
generate the 2010 Ore Reserve.
-0.69
-22.49
The decrease is due to depletions, geological model changes having a negative impact on grade and significantly
higher operating costs.
-0.09
-30.22
The decrease in Ore Reserve is almost entirely due to depletion of the stockpile inventory.
0.84
57.72
Increase due to new Mineral Resource models, economic changes, additions from the Deep Sulphide project and
the upgrading of Tambali.
0.03
77.27
Increase is due to favourable economic changes that have more than offset the annual depletion.
0.22
13.72
Increase due to a new Mineral Resource model providing additional resources in the Main and North pits; also due to
the outcome of the first phase of an optimisation project which has resulted in a larger pit shell and an increased plant
feed schedule.
-0.85
-16.82
Decrease is due to depletion as well as geological model changes which negatively affected the grades within the
Nyankanga and Geita Hill pit shells.
-0.78
-2.81
-0.35
-20.31
Change in mine economics has modified the planned mining method in GQ and Astro from bulk to selective, reducing
recoverable ounces by selectivity and sterilisation.
0.05
2.16
Gains due to Mineral Resource model update and the BFS economic assumptions, resulting in cut-off grade changes.
These gains were offset by design changes and a small amount of material being removed from the schedule due to
negative cash-flow.
-0.30
-7.45
-0.03
-2.02
No significant changes. Depletion of 0.19Moz was compensated for by 0.11Moz increase due to model change
and 0.03Moz of scope change (ounces that were planned for open pit but are now allocated to underground).
-0.03
-1.51
No significant changes. Depletion of 0.36Moz was compensated by 0.26Moz increase due to additional Ore Reserves
from Cuiabá.
0.04
12.64
Change due to model changes of 0.14Moz. The new Ore Reserves are from Palmeiras and Pequizão.
1.43
33.47
Added Ore Reserves in 2010 due to the MLE 2 project.
1.40
16.20
-0.24
-0.33
background image
P
14
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa
South Africa
Ensuring a
future
profitable
West Wits operations
Mponeng
Savuka
TauTona
West Wits Surface operations
South Africa
Vaal River operations
Great Noligwa
Kopanang
Moab Khotsong
Vaal River Surface operations
for deep-level mining
background image
P
15
Regional overview
AngloGold Ashanti’s South Africa operations comprise six deep-level mines and the surface operations. They are:
The Vaal River operations – Great Noligwa, Kopanang, Moab Khotsong and the surface processing operation. The fourth deep-
level mine in this region, Tau Lekoa, was sold during the course of the year.
The West Wits operations – Mponeng, Savuka and TauTona and a surface processing operation.
Together, these operations produced 1.78Moz of gold in 2010, or 39% of group production, and 1.5Mlbs of uranium as a by-product.
The Mineral Resource in South Africa, attributable to AngloGold Ashanti, totalled 97.90Moz at year-end, including an attributable Ore
Reserve of 30.38Moz.
All Mineral Resources and Ore Reserves listed are attributable unless otherwise stated.
Mineral Resource by region
as at 31 December 2010
Tonnes
Grade
Contained gold
Category
million
g/t
Tonnes
Moz
South Africa Region
Measured
26.51
15.30
405.52
13.04
Indicated
(1)
753.04
2.76
2,075.87
66.74
Inferred
40.82
13.81
563.55
18.12
Total
820.38
3.71
3,044.94
97.90
Ore Reserve by region
as at 31 December 2010
Tonnes
Grade
Contained gold
Category
million
g/t
Tonnes
Moz
South Africa Region
Proved
12.03
8.24
99.07
3.19
Probable
(2)
191.99
4.41
845.74
27.19
Total
204.02
4.63
944.81
30.38
(1)
The reduction in grade relative to the Measured and Inferred Mineral Resource is due to the inclusion of 505Mt at 0.28g/t at tailings and rock dump
Mineral Resource.
(2)
The reduction in grade relative to the Proved Ore Reserve is due to the inclusion of 111Mt at 0.49g/t at tailings and rock dump Ore Reserve.
background image
P
16
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa
Country overview
The South African operations comprise six underground mines located in two geographical regions on the Witwatersrand Basin called
the Vaal River and West Wits operations.
The primary reefs mined by the Vaal River operations are the Vaal Reef (VR) and the Ventersdorp Contact Reef (VCR), and the
secondary Crystalkop Reef (C Reef).
The West Wits operations are situated near the town of Carletonville. The primary reefs mined are the Carbon Leader Reef (CLR)
and the VCR.
All six operations are 100% owned by AngloGold Ashanti. In addition, the Vaal River Surface and West Wits Surface operations mine
the waste rock dumps and tailings dams which result from the mining and processing of the primary and secondary reef horizons.
Mineral Resource estimation
A multi-disciplinary approach is adapted to Mineral Resource estimation whereby inputs are required from the geoscience, survey
and mine planning departments. A computerised system called the Mineral Resource Inventory System (MRIS) integrates all the input
information to produce the final Mineral Resource per operation. Mineral Resource estimates are computed from a composite grid of
value estimates, comprising various block sizes. The macro block sizes vary from 210m x 210m to 420m x 420m with micro blocks
of 30m x 30m.
Compound lognormal macro co-kriging estimation techniques are used to produce estimates for the larger block sizes. This
technique uses the Bayesian approach whereby the assayed (observed) data in the mined-out areas are used to infer the population
characteristics of the area ahead of current mining. The geological model forms the basis for this estimation and all surface borehole
information from the peripheral areas of the mine lease play a crucial role in determining the geological model boundaries. Simple
kriging is used for the 30m block sizes and these estimates are constrained by the weight of the mean.
The Mineral Resource is initially reported as inclusive of the Ore Reserve as they form the basis for the Ore Reserve conversion
process. Mineral Resource cut-offs are computed by operation, for each reef horizon. These cut-offs incorporate a profit margin that
is relevant to the business plan. Mineral Resource grade tonnage curves are produced for the individual operations, which show the
potential of the orebody at different cut-offs. These curves are produced for dimensions equivalent to a practical mining unit for
underground operations.
Ore Reserve estimation
All mine designs are undertaken using the Cadsmine ® software package and include the delineation of mining or stoping areas for
each mining level and section, usually leading from an extension to the existing mining sequence, and the definition of the necessary
development layouts. The in situ Mineral Resource is scheduled monthly for the full Life-Of-Mine (LOM) plan. The value estimates for
these schedules are derived directly from the MRIS.
Modifying factors are applied to the in situ Mineral Resource to arrive at an Ore Reserve. These factors comprise a dilution factor to
accommodate the difference between the mill width and the stoping width as well as the MCF.
South Africa
background image
P
17
Development sampling results – January to December 2010
Development values represent actual results of sampling, no allowances having been made for adjustments necessary in estimating
ore reserves.
Statistics are shown
Advanced
Sampled
Sampled
in metric units
metres
Sampled Ave. channel
gold
uranium
South Africa
(total)
metres
width (cm)
Ave. g/t
Ave. cm.g/t
Ave. kg/t Ave. cm.kg/t
Vaal River
Great Noligwa
Vaal Reef
2,432
20
75.0
49.72
3,729
2.43
182.01
Kopanang
Vaal Reef
24,724
3,132
23.3
55.06
1,283
3.00
70.82
Moab Khotsong
Vaal Reef
20,939
1,806
119.9
27.41
3,287
1.19
142.75
West Wits
Mponeng
Ventersdorp Contact Reef
16,636
1,092
58.4
32.02
1,870
Savuka
Carbon Leader Reef
315
58
55.8
60.29
3,364
0.67
37.22
TauTona
Ventersdorp Contact Reef
362
70
173.3
9.26
1,605
0.02
3.91
Carbon Leader Reef
11,584
560
28.5
98.63
2,811
0.89
26.11
background image
P
18
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Great Noligwa
Location
Great Noligwa is located about 15km south-east of the town of Orkney, in the southern part of the Klerksdorp Goldfield. The Great
Noligwa mining lease area is about 49km2 and is constrained to the north by Aurora gold mine, to the east by Buffelsfontein gold
mine, to the south by Moab Khotsong gold mine and to the west by Kopanang gold mine.
The economic horizons are exploited between 1,500 and 2,600m below surface through a mining method that gains access to the
gold bearing reefs through footwall haulages and return airway development. Cross-cuts are developed every 180m from the
haulages to the reef horizon. Raises are then developed on-reef to the level above and the reef is mined out on strike.
Geology
The VR is the principal economic horizon at Great Noligwa and the C Reef is the secondary economic horizon. Both reefs are part
of the Witwatersrand Supergroup and are stratigraphically located near the middle of the Central Rand Group. The C Reef forms the
top of the Johannesburg Subgroup, while the VR is on average 260 to 270m below the C Reef, but still in the top third of the
Johannesburg Subgroup.
The VR unit can reach a maximum thickness of 2m and consists of a thin basal conglomerate (the C facies) and a thicker sequence
of upper conglomerates (the A facies). These two sedimentary facies are separated by the B facies, which is a layer of barren
orthoquartzites. The A facies is the principal economic horizon within the VR, but remnants of the C facies may be sporadically
preserved below the A facies. High gold values in the VR are often associated with high uranium values as well as the presence of
carbon at the base of the VR. Uranium is a very important by-product of Great Noligwa.
The C Reef has been mined on a limited scale in the central part of Great Noligwa, where the high-grade north-south orientated
channel containing two economic horizons has been exposed. To the east and the west of the channel the C Reef is poorly developed
with relatively small areas of economic interest. As in the case of VR, high uranium values are also often associated with high gold
values and the presence of a 5mm to 2cm carbon seam at the base of the conglomerate. To the north the C Reef sub-crops against
the Gold Estates Conglomerates and in the extreme south of the mine the C Reef has been eliminated by deep Kimberley Erosion
Channel and the Jersey fault.
Projects
Drilling is ongoing in a fault zone containing remnant blocks of VR. This ground is situated in the eastern part of the mining lease area
and is referred to as the Fish Block. The reef blocks are situated in a high-grade geozone within the Zuiping A fault loss area. During
the year a total of 15 boreholes were drilled (1,041m) from which six reef intersections were achieved. A total of 1,620m of diamond
drilling is planned for 2011 to increase the geological confidence in the proposed mining area and to test for upside potential in the
north-east of the project area.
South Africa
Great Noligwa
background image
P
19
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Great Noligwa
Category
million
g/t
Tonnes
Moz
Crystalkop Reef
Measured
1.90
7.69
14.60
0.47
Indicated
2.72                       10.28
27.96                         0.90
Inferred                                       0.60
10.15
6.07
0.20
Total                                           5.22
9.32
48.64
1.56
Vaal Reef
Measured
4.54
15.09
68.54
2.20
Indicated                                    1.28
15.00
19.23
0.62
Inferred                                      0.30
12.66
3.80
0.12
Total                                          6.12
14.95
91.57
2.94
Great Noligwa
Total
11.34
12.36
140.20
4.51
Reef intersection
No reef intersection
Planned holes for 2011
100m
Legend
160m (throw on fault)
160m
Reef blocks in Zuiping “A” fault
background image
P
20
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Great Noligwa
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole Other
Comments
Great Noligwa
Measured
5 x 5
Chip sampling
Indicated
100 x 100
Diamond drilling
Inferred
200 x 200
Diamond drilling
Grade control     
See Measured category
Exclusive Mineral Resource
The Exclusive Mineral Resource for the Measured category of VR is 1.2Mt at a grade of 20.86g/t. The Indicated Mineral Resource is
0.4Mt at a grade of 17.41g/t and the Inferred Mineral Resource is 0.15Mt at a grade of 14.17g/t.
The Exclusive Mineral Resource for the Measured category of the C Reef is 1.2Mt at a grade of 7.11g/t. The Indicated Mineral
Resource is 1.7Mt at a grade of 10.78 g/t. No Inferred category was classified in the Exclusive Mineral Resource.
Both the VR and C Reef Exclusive Mineral Resource are from areas located beyond the window of opportunity and beyond mine
infrastructure. 62% of the total Exclusive Mineral Resource tonnes are from the C Reef horizon and 38% from the VR horizon.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Great Noligwa
Category
million
g/t
Tonnes
Moz
Measured                                   2.42
14.08
34.00
1.09
Indicated                                    2.20
12.13
26.69
0.86
Inferred                                      0.15
14.17
2.13
0.07
Great Noligwa
Total
4.77
13.18
62.82
2.02
South Africa
Great Noligwa
Great Noligwa:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
Change
6.94
2009
-0.20
Depletion
0.27
Gold
price
-0.06
Explo-
ration
0.08
Metho-
dology
4.51
2010
-2.47
Cost
-0.06
Other
Great Noligwa:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
1.60
1.55
1.50
1.45
1.40
1.35
1.30
1.25
1.20
1.15
Change
1.60
2009
-0.10
Depletion
0.05
Model
change
0.00
New
ounces
from
projects
0.11
Scope
change
1.42
2010
-0.39
Change in
Economics
0.14
Other
background image
P
21
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Great Noligwa
Category
million
g/t
Tonnes
Moz
Crystalkop Reef
Proved
0.71
5.48
3.88
0.12
Probable                                     0.96
5.93
5.72
0.18
Total                                           1.67
5.74
9.60
0.31
Vaal Reef
Proved
3.32
8.19
27.18
0.87
Probable                                     0.83
8.66
7.23
0.23
Total                                           4.15
8.29
34.41
1.11
Great Noligwa
Total
5.83
7.55
44.01
1.41
Inferred Mineral Resource in business plan
Some Inferred Mineral Resource was included in the optimisation process. The Inferred Mineral Resource for the VR is estimated at
0.3Mt at 12.66g/t. For the C Reef it is estimated at 0.6Mt at a grade of 10.15g/t. The Mineral Resource is scattered throughout the
mine in the form of pillars left behind by previous mining extraction as well as pillars within the major fault loss zones.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Great Noligwa
million
g/t
Tonnes
Moz
Comments
Vaal Reef
0.15
7.05
1.06
0.03
Included in business plan but not published
as Ore Reserve
Total
0.15
7.05
1.06
0.03
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Cut-off
Stoping
Gold
change
value
value
width
Dilution
Great Noligwa
price
rate
g/t Au
cmg/t Au
(cm)
(%)
MCF%
MetRF%
Mine
850
8.71
11.13
1,800
161.7
52          63.20           95.99
background image
South Africa
Great Noligwa
P
22
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Great Noligwa
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Geo Steyn
SACNASP
400312/05
10 years
Ore Reserve
Andre Kruger
PLATO
PMS0114
33 years
Great Noligwa
– underground (metric)
Tonnes above cut-of
f (millions)
0
20
Average grade 
above cut-off (g/t)
15
10
5
12
10
8
6
4
2
0
30
28
26
24
22
20
18
16
14
12
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
background image
P
23
Location
Kopanang is located in the Orange Free State province, approximately 170km south-west of Johannesburg and 10km south-east of the
town of Orkney. The mine has been in production since 1984 and was originally known as Vaal Reef 9 Shaft. Kopanang’s current mine
lease incorporates an area of 35km2, directly west of neighbouring Great Noligwa mine and bound to the south by the Jersey Fault.
Dolomites of the Transvaal Supergroup outcrop on surface, resulting in a very subdued topography with very few rock exposures.
Geology
Gold and uranium-bearing conglomerates of the Central Rand Group are mined at Kopanang, the most important of which is the VR.
Gold is the primary commodity at Kopanang, with uranium oxide being extracted as a by-product. The economic VR and C Reef
conglomerates are exposed via a twin-shaft system that reaches a depth of 2,340m. The VR is exploited at depths ranging from
1,300 to 2,600m below surface. Kopanang almost exclusively mines the VR, although minor amounts of gold are also extracted from
the C Reef, which is stratigraphically about 250m above the VR. The VR and C Reef generally dip towards the south-east at between
10° and 30°.
The VR is a medium to high-grade reef consisting of a basal conglomerate called the Stilfontein Reef, occasionally overlying remnant
Grootdraai conglomerate units, with an overlying Upper Vaal unit. Current terminology separates the reef into A, B and C facies, where
the C facies is the basal Stilfontein and/or Grootdraai conglomerates.
The overlying Upper Vaal or A facies is split into three distinct sub facies; the VR A Bottom, Middle and Top, which consist of a series
of small pebble conglomerates and grits containing very little gold. Further to the east at Great Noligwa, the A facies becomes more
robust, is better developed and displays high gold values.
The B facies is simply a fine-grained, cross bedded, light grey, black speckled orthoquartzite that separates the A and C facies.
The basal C facies conglomerate of the VR is the main gold carrier on Kopanang. It varies very little in thickness, with 7 to 10cm being
typical. The conglomerate comprises mostly quartz (92-98%) and chert (2-8%), with occasional porphyry clasts (<2%). The matrix is
generally very pyritic and the base is non-channelised, often containing a well developed carbon seam.
The C Reef contains two economic conglomerates, although the lower-most conglomerate is only preserved as small remnants. Gold
concentrations are typically associated with a basal carbon seam. The C Reef sub-crops in the north against the Gold Estates
member of the Kimberley Formation. To the south of this unconformity, the reef can be eliminated by either the Kimberley erosion
channels or bedding parallel faulting.
South Africa
Kopanang
background image
P
24
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Kopanang
South Africa
Kopanang
Kopanang is situated in a structurally complex area of the Witwatersrand Basin, which has been subjected to numerous tectonic
events. The complexity of the faulting at Kopanang became evident during initial surface diamond borehole drilling. Prior to 1970,
12 surface boreholes had been drilled on the farm Pretoriuskraal 53 and only five of these intersected the VR, the rest had been
faulted out. Approximately 20% of the ground in the mine lease area has been eliminated due to the presence of faulting.
At least nine structural events, of differing ages, are thought to have affected the reef at Kopanang. The interaction of the resultant
geological structures can be very complicated since many of these faults have been reactivated at latter stages, or been active over
long periods of time. The tectonic time frame ranges from late Archaean to Cretaceous and therefore involves some 2.7 billion years
of structural deformation.
Exploration
The exploration at Kopanang is focussed around target blocks that will be explored from underground drilling. The VR target blocks are
situated in the shaft fault area and the ground below 68 level. Additional to this ground, the western portion of the mine lease (Gencor
1E area) forms a potential mineable area and is being explored by a combination of exploration drilling and underground development.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Kopanang
Category
million
g/t
Tonnes
Moz
Crystalkop Reef
Measured
0.07
12.18
0.87
0.03
Indicated                                    0.41
12.13
5.00
0.16
Inferred                                      0.89
13.75
12.18
0.39
Total                                           1.37
13.18
18.06
0.58
Vaal Reef EDOM
Measured
0.18
11.66
2.06
0.07
Indicated                                     1.36
12.20
16.62
0.53
Inferred                                       0.15
9.31
1.41
0.05
Total                                           1.69
11.89
20.08
0.65
Vaal Reef Base
Measured
3.15
16.02
50.53
1.62
Indicated                                   16.79
10.97
184.13
5.92
Inferred                                      1.09
10.18
11.11
0.36
Total                                         21.03
11.68
245.77
7.90
Kopanang
Total
24.09
11.78
283.90
9.13
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Kopanang
Measured
5 x 5
Chip sampling
Indicated
200 x 200
GBH drilling
Inferred
1,000 x 1,000
Surface boreholes
Grade control     
See Measured category
background image
P
25
Exclusive Mineral Resource
Approximately 47% of the Exclusive Mineral Resource is expected to be taken up in safety and remnant pillars, areas beyond the
window of opportunity and areas beyond infrastructure.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Kopanang
Category
million
g/t
Tonnes
Moz
Measured                                   2.48
15.88
39.34
1.26
Indicated                                    8.60
9.32
80.17
2.58
Inferred                                      1.75
11.45
20.05
0.64
Kopanang
Total                                         12.83
10.87
139.56
4.49
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Kopanang
Category
million
g/t
Tonnes
Moz
Measured
0.02
7.77
0.17
0.01
Indicated
0.25
14.73
3.68
0.12
Inferred
0.26
12.03
3.15
0.10
Kopanang
Total                                           0.53
13.13
7.00
0.23
Kopanang:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
10.1
10.0
9.9
9.8
9.7
9.6
9.5
9.4
9.3
9.2
9.1
9.0
Change
10.04
2009
-0.56
Depletion
0.03
Gold
price
-0.38
Explo-
ration
0.00
Metho-
dology
9.13
2010
-0.05
Cost
0.06
Other
Kopanang:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
3.4
3.3
3.2
3.1
3.0
2.9
2.8
2.7
2.6
Change
3.35
2009
-0.57
Depletion
-0.17
Model
change
0.00
New
ounces
from
projects
0.49
Scope
change
3.11
2010
0.00
Change in
Economics
0.00
Other
background image
P
26
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Kopanang
South Africa
Kopanang
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Kopanang
Category
million
g/t
Tonnes
Moz
Crystalkop Reef
Proved
0.02
5.66
0.09
Probable                                     0.33
6.98
2.29
0.07
Total                                          0.34
6.92
2.38
0.08
Vaal Reef EDOM
Proved
0.07
6.32
0.43
0.01
Probable                                      1.51
5.39
8.14
0.26
Total                                           1.58
5.43
8.57
0.28
Vaal Reef Base
Proved
1.16
8.00
9.24
0.30
Probable                                    11.51
6.64
76.41
2.46
Total                                         12.67
6.76
85.65
2.75
Kopanang
Total
14.59
6.62
96.61
3.11
Inferred Mineral Resource in business plan
Some Inferred Mineral Resources were included in the business plan during the optimisation process. The Inferred Mineral Resource
for VR is estimated at 1.3Mt at 11.40g/t and the C Reef is estimated at 0.9Mt at 14.20g/t. The Inferred Mineral Resource consist
mainly of the outer perimeters of the mining lease area, plus pillars left behind by previous mining extraction as well as pillars within
major fault loss zones. The table below indicates the Inferred Mineral Resource included in the business plan but not published as
part of the Ore Reserve.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Kopanang
million
g/t
Tonnes
Moz
Comments
Crystalkop Reef
0.19
11.51
2.23
0.07
Vaal Reef EDOM
0.10
7.02
0.68
0.02
Vaal Reef Base
0.31
7.79
2.42
0.08
Total                                                        0.60
8.86
5.32
0.17
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Cut-off
Stoping
Gold
change
value
value
width
Dilution
Kopanang
price
rate
g/t Au
cmg/t Au
(cm)
(%)
MCF%
MetRF%
Crystalkop
Reef
850
8.71
4.81
500
104.0
51          69.15           95.55
Vaal
Reef
850
8.71
4.81
500
104.0
48          69.15           95.55
background image
P
27
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Brenda Freese
GSSA
966602
13 years
Ore Reserve
Andre Johnson
SACNASP
400011/06
21 years
Kopanang
– underground (metric)
Tonnes above 
cut-off (millions)
0
20
Average grade
 above cut-off (g/t)
25
20
15
10
5
0
35
30
25
20
15
10
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
5
15
10
Stilfontein Quartzite/
C-Facies Grits
Vaal Reef
C-Facies
MB5 Footwall
Stilfontein
Conglomerate
Grootdraai
Conglomerate
Reef “Carbon”
background image
P
28
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Moab Khotsong
Shaft bottom -4,026.8mBD
Reef
Old MM shaft
Main shaft
Backfill shaft
Sub RV Shaft
115L
114L
111L
108L
105L
103L
99L
98 Inner L
92 Inner L
82 Inner L
106L
103L
Shaft bottom -3,649.3mBD
102L
101L
100L
95L
85L
80L
79L
78L
77L
76L
73L
70L
64L
1200L
Top mine
Middle mine
Lower mine
Project
Zaaiplaats 2
below 101L
Location
Moab Khotsong is the newest deep level gold mine in South Africa. It is situated near the towns of Orkney and Klerksdorp and is
about 180km south-west of Johannesburg.
Following the successful exploration of the VR in the Moab Khotsong lease area, which lies to the south and is contiguous with the
Great Noligwa lease area, a decision was taken in late 1989 to exploit the Moab Khotsong Mineral Resource. Shaft sinking started
in 1991 and the first gold was produced in October 2003.
The AngloGold Ashanti Board approved the Moab Khotsong Project in its revised form in April 2003. The middle mine consists of a
main shaft system and a sub vertical shaft system which are utilised to exploit the VR to depths between 2,600 and 3,054m below
surface on the downthrown side of the Die Hoek and Jersey fault complex. A feasibility study of the lower mine (Zaaiplaats) was
recently completed. The project will exploit the gold bearing VR to depths of 3,455m below collar. The main shaft was commissioned
in June 2002 and the rock ventilation shaft in March 2003. Ore Reserve development on 85, 88, 92, 95, 98 and 101 levels is
progressing to plan. Stoping operations commenced in November 2003 and the mine will reach full production in 2013.
Geology
The Mineral Resource at Moab Khotsong is structurally complex and highly faulted, with large fault-loss areas. Mining is based on a
scattered mining method with an integrated backfill support system combined with bracket pillars. The raise lines are spaced 200m
apart on the dip of the reef, with 25m-long panels. Backfill is carried to within 4m of the advancing stope faces and 75% of the total
area extracted is likely to be backfilled.
The geological setting of Moab Khotsong is one of crustal extension, bounded in the north-west and south-east by major
south-dipping fault systems with north-dipping Zuiping faults sandwiched between them. The Die Hoek and Buffels East faults
structurally bound the reef blocks of the Moab middle mine to the north-west and south-east respectively. The northern boundary is
a Zuiping-type fault. The southern boundary fault of the Moab middle mine is currently not defined.
South Africa
Moab Khotsong
Moab Khotsong
Schematic diagram
background image
P
29
Due to the magnitude of the displacement across the Die Hoek fault (more than 700m down to the south) geological structures
encountered on the up-thrown side of the fault cannot be projected to the down-thrown side and vice versa. It is only once the
development is through the Die Hoek fault that geological mappings have any bearing on the reef blocks, and a considerable amount
of exploration drilling is required to accurately delineate these blocks in this structurally complex area.
The C Reef is preserved in the northern part of the mine where the reef has been intersected by a number of boreholes.
No development or stoping has taken place on the C Reef at Moab Khotsong to date.
Projects
The initial investment and development of Moab Khotsong was, in part, taken with a view that the new mine would be well-positioned
to exploit additional surrounding ore blocks. The most important of these blocks will be the Zaaiplaats block, positioned to the
south-west of the current Moab Khotsong infrastructure, and extending some 400m deeper than the existing mine. The Moab
Khotsong business plan, without growth projects, is expected to produce some 3Moz of gold until 2022, when the mine is scheduled
to close. The Zaaiplaats project will provide an additional 5Moz, a life extension of some 13 years, and the opportunity to bring in
additional blocks will that rely on the new project infrastructure to be explored and accessed.
Project study work exploiting the Zaaiplaats block began in 2003, and in 2006, the study was successfully taken through the scoping
and pre-feasibility phases. In 2007 strategic intent was obtained and Ore Reserves were published on the back of a comprehensive
pre-feasibility study. The subsequent feasibility study was completed by the end of 2008 and showed competitive returns. The
renewed success of the study was largely as a result of a much healthier gold price environment and outlook, and incorporated
several technical changes, one being flatter declines that will be excavated by means of trackless machinery.
background image
P
30
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Moab Khotsong
An important issue was encountered whilst developing the current Moab Khotsong middle mine, where the intersection of complex
geological structures had a significant impact on the location of infrastructure, safety, production and cost performance of the mine.
Accordingly, work on the project was slowed until a higher level of confidence in the geological structural setting for Moab Khotsong
and Zaaiplaats was in place.
As operations at Moab Khotsong stabilised, it was considered appropriate to start the process of developing the
Zaaiplaats opportunity with a modified approach of pre-development that will facilitate drilling platforms for the gathering of orebody
and structural information, together with the possibility of earlier gold production given the drilling outcomes expected.
This pre-development also retains the option to fundamentally change the orebody extraction approach through technology.
Exploration
Brownfields exploration is currently focussed on improving confidence in the geological model. Four surface drilling machines,
targeting the Zaaiplaats Mineral Resource, and four long inclined borehole (LIB) machines, targeting middle mine Mineral Resource
blocks, were in operation during 2010. The areas targeted by the four surface machines were on the periphery of the proposed
Zaaiplaats mining area, where multiple structures define the ore block margins.
Borehole MZA9 was intended to raise the confidence of an Inferred Mineral Resource block in the north-east portion of the Zaaiplaats
project area and also to confirm the structure between the middle and lower mines. This hole was stopped when a preferable
underground drilling option became available. In the north-west of the main Zaaiplaats block, borehole MMB5 successfully
intersected the VR target and deflection drilling is in progress. Further to the west, borehole MGR8 also successfully intersected the
VR and has moved on to deflection drilling. The long deflection of MGR6 is in progress to increase the structural confidence along
the southern margin of Zaaiplaats.
The four LIB machines, deployed in the middle mine to obtain structural information on both the VR and C Reef horizons, completed
15 boreholes and three deflections during the year. Thirteen VR intersections, four VR elimination faults and two C Reef elimination
faults were obtained.
South Africa
Moab Khotsong
Project Zaaiplaats
Kopanang Mine
Great Noligwa Mine
Moab Khotsong Mine
Top Mine
Middle Mine
Moab Khotsong
The Zaaiplaats orebody
background image
P
31
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Moab Khotsong
Category
million
g/t
Tonnes
Moz
C Reef – Middle mine area
Measured
Indicated                                      0.02
8.21
0.20
0.01
Inferred                                        0.96
9.84
9.45
0.30
Total                                           0.99
9.80
9.66
0.31
VR – GNM shaft pillar area
Measured
0.11
16.95
1.83
0.06
Indicated                                     1.50
16.15
24.16
0.78
Inferred                                           –
Total                                          1.60
16.20
25.98
0.84
VR – Top mine area
Measured
1.01
25.36
25.71
0.83
Indicated                                     0.75
19.91
14.86
0.48
Inferred                                       0.11
14.28
1.63
0.05
Total                                           1.87
22.51
42.20
1.36
VR – Middle mine area
Measured
1.17
17.56
20.54
0.66
Indicated                                     4.36
30.55
133.22
4.28
Inferred                                       1.80
27.02
48.64
1.56
Total                                           7.33
27.61
202.40
6.51
Lower mine – Area A
Measured
Indicated                                      0.15
23.42
3.57
0.11
Inferred                                        1.00
22.95
22.93
0.74
Total                                            1.15
23.01
26.50
0.85
Lower mine – Area B
Measured
Indicated                                     2.20
11.68
25.72
0.83
Inferred                                       1.01
12.60
12.75
0.41
Total
3.21
11.97                       38.47                        1.24
Lower mine – Area C
Measured
Indicated                                     0.12
8.92
1.06
0.03
Inferred                                       2.10
11.55
24.21
0.78
Total                                            2.21
11.41
25.27
0.81
Lower mine – Area PZ 2
Measured
Indicated                                      8.30
23.10
191.76
6.17
Inferred                                        2.88
24.12
69.54
2.24
Total                                          11.18
23.36
261.30
8.40
Moab Khotsong
Total
29.56
21.37
631.78
20.31
background image
P
32
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Moab Khotsong
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole    Other
Comments
Moab Khotsong
Measured
5 x 5
Chip sampling
Indicated
200 x 200
GBH drilling
Inferred
1,000 x 1,000
Surface boreholes
Grade control     
See Measured category
Exclusive Mineral Resource
The Exclusive Mineral Resource consists of designed rock engineering bracket pillars, designed dip pillars and the Great Noligwa
shaft pillar on the VR. The major portion (59%) of this Exclusive Mineral Resource is situated in the lower mine area, with minor
amounts in the top mine (7%), middle mine (29%), C Reef (2%) and shaft pillar (4%) areas. The bracket pillars are designed for safety
reasons and will therefore not be mined, whereas the shaft pillars can only be safely extracted at the end of the mine life.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Moab Khotsong
Category
million
g/t
Tonnes
Moz
Measured                                    0.45
51.14
22.97
0.74
Indicated                                     4.37
19.63
85.70
2.76
Inferred                                      9.87
19.17
189.16
6.08
Moab Khotsong
Total
14.68
20.29
297.82
9.58
South Africa
Moab Khotsong
background image
P
33
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Moab Khotsong
Category
million
g/t
Tonnes
Moz
Measured
Indicated
10.95
20.70
226.62
7.29
Inferred
8.50
20.52
174.41
5.61
Moab Khotsong
Total
19.45
20.62
401.04
12.89
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Moab Khotsong
Category
million
g/t
Tonnes
Moz
VR – Top mine area
Proved
0.97
11.44
11.10
0.36
Probable
0.75
8.92                         6.70                        0.22
Total                                          1.72
10.34
17.80
0.57
VR – Middle mine area
Proved
0.87
9.36
8.16
0.26
Probable                                     5.69
13.46
76.55
2.46
Total                                           6.56
12.91
84.71
2.72
Lower mine – Area PZ 2
Proved
Probable                                     10.40
12.54
130.46
4.19
Total                                          10.40
12.54
130.46
4.19
Moab Khotsong
Total
18.69
12.47
232.97
7.49
Moab Khotsong:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
20.45
20.40
20.35
20.30
20.25
20.20
20.15
20.10
20.05
20.00
Change
20.45
2009
-0.38
Depletion
0.04
Gold
price
0.29
Explo-
ration
0.00
Metho-
dology
20.31
2010
-0.09
Cost
0.00
Other
Moab Khotsong:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
7.5
7.4
7.3
7.2
7.1
7.0
6.9
6.8
Change
7.14
2009
-0.30
Depletion
0.64
Model
change
0.00
New
ounces
from
projects
0.03
Scope
change
7.49
2010
0.00
Change in
Economics
-0.01
Other
background image
P
34
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Moab Khotsong
South Africa
Moab Khotsong
Inferred Mineral Resource in business plan
The Inferred Mineral Resource was used for optimisation purposes as it forms part of the business plan, but is excluded from the
published Ore Reserve. The location and amount of this material are indicated in the following diagram and table respectively.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Moab Khotsong
Locality code
million
g/t
Tonnes
Moz
Top mine
A
0.07
12.04
0.84
0.03
Middle mine (Southwest)
B
0.07
11.43
0.81
0.03
Middle mine (Northeast)
C
0.24
16.98
4.15
0.13
Project Zaaiplaats
D
2.74
23.82
65.36
2.10
Moab Khotsong
Total
3.13
22.74
71.16
2.29
Ore Reserve below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Moab Khotsong
Category
million
g/t
Tonnes
Moz
Proved
Probable
10.40
12.54
130.46
4.19
Moab Khotsong
Total
10.40
12.54
130.46
4.19
A
C
Middle Mine
Top Mine
Project Zaaiplaats
B
D
Measured
Indicated 1
Indicated 2
Indicated 3
Inferred
Inventory
Blue Sky
Legend
Moab Khotsong
Inferred Mineral Resource within Ore Reserve design
background image
P
35
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Cut-off
Stoping
Gold
change
value
value
width
Dilution
Moab Khotsong
price
rate
g/t Au
cmg/t Au
(cm)
(%)
MCF%
MetRF%
Lower mine – Area PZ 2
850
8.71
5.51
700
127.0
9
81.00
95.36
VR – Middle mine area
850
8.71
4.38
700
159.8
51
79.51
95.61
VR – Top mine area
850
8.71
4.24
700
165.2
43
74.80
95.61
background image
P
36
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Moab Khotsong
South Africa
Moab Khotsong
Moab Khotsong
– underground (metric)
Tonnes above 
cut-off (millions)
0
20
Average grade 
above cut-off (g/t)
30
28
26
24
22
20
18
16
14
29
28
27
26
25
24
23
22
21
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
5
15
10
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Terry Adam
GSSA
5532
32 years
Ore Reserve
Johan Wall
PLATO
PMS0164
27 years
background image
Location
Mponeng is situated on the West Wits Line, close to the town of Carletonville in the province of Gauteng. The mine is about 65km
south-west of Johannesburg and forms part of AngloGold Ashanti’s West Wits operations. Mining at Mponeng is conducted at an
average depth of between 2,800 to 3,400m below surface. The mine operates two vertical hoisting shafts, a sub-shaft and two
service shafts. The Mponeng lease area is constrained to the north by the TauTona and Savuka mines and to the south only by the
depth of the orebody, which is open-ended. In 2008, permission was granted to explore the Western Ultra Deep Levels (WUDLS)
portion to the south of the mine, thereby increasing the size of the lease area and the potential Mineral Resource.
Geology
The VCR is the only reef currently being mined at Mponeng. The VCR consists of a quartz pebble conglomerate (up to 3m thick)
capping the uppermost angular unconformity of the Witwatersrand Supergroup. The VCR is overlain by the Ventersdorp Lavas which
dramatically halted further reef development at that time. The footwall stratigraphy partially controls the reef facies type and consists
of a series of argillaceous to siliceous protoquartzites, shales and siltstones from the Central Rand Group of the Witwatersrand
Supergroup. The erosional nature of the deposition of the VCR means that the VCR is lain down on these different Witwatersrand
footwalls. The age of these footwall formations increase from west to east.
P
37
South Africa
Mponeng
Long vertical boreholes (LVBs) drilled from underground to intersect the CLR at depth
116 level
development
VCR reef
blocks
CLR blocks
LVB holes
background image
P
38
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Mponeng
South Africa
Mponeng
Most of the VCR mined at Mponeng lies on footwall strata of the Kimberley Formation, which is a relatively argillaceous protoquartzite.
The VCR is dominated by a series of channel terraces at different elevations, separated by slopes where the reef widths are lower
and the angular unconformity between the footwall is larger than on reef terrace planes. More durable quartzites of the Elsburg
Formation lie to the west, while the eastern side of the mine is dominated by shales and siltstones of the Booysens Formation.
The hardness of the footwall units is thought to have influenced the development of the terraces.
An additional gold-bearing reef that occurs at Mponeng is the CLR. This reef has been mined at the adjacent Savuka and TauTona
mines, and Mponeng is planning to mine the CLR in the future. The CLR at Mponeng consists of – on average – a 20cm thick, tabular,
auriferous quartz pebble conglomerate formed near the base of the Central Rand Group. The CLR is approximately 900m deeper
than the VCR. Major exploration drilling started in early 2008 in order to improve resource confidence and confirm the geological
structures that occur at the deep levels at which mining would extract the CLR. Of the three economic units that exist within the CLR,
the Mponeng CLR target area is dominated by the centrally located Unit 3 with a smaller portion of Unit 2 towards the east. Unit 2
is a complex channel deposit, and Unit 3 is the oldest of the CLR channel deposits sitting at the base of the package.
background image
P
39
Both the VCR and the CLR orebodies are subjected to faulting and are intruded by a series of igneous dykes and sills of various ages
that cross-cut the reefs. There is an inherent risk in mining through these faults and intrusives and a key function of the geoscience
department is to identify these geological features ahead of the working face. The correct mining approach can then be applied in
order to minimise risk.
Exploration
Both the VCR and CLR at Mponeng can be accessed down to 120 level (3,645m below datum), but there is currently no infrastructure
in place that can service stoping operations below 120 level. The high-grade CLR below 120 level has remained inaccessible and
therefore represents an enormous opportunity of additional ounces for Mponeng.
During 2010 a series of sub-vertical exploration holes were drilled from underground to intersect the CLR at depth. These sub-vertical
holes were drilled to improve the confidence in the CLR orebody. The average length of each hole was 900m with the longest hole drilled
in 2010 reaching 1,090m. The information that was gained from these drill-holes has confirmed the geological structure at depth and
generated more confidence in the current mineralisation and estimation models.
The extension of Mponeng, by generating access to the CLR, will provide the mine with a strong base from which several regional benefits
can be realised, as well as enabling other smaller projects to be brought in to match the extended life of the asset and the West Wits
operations as a whole. The approval of the CLR project will compliment further exploration and development of the WUDLS Mineral
Resource and also has the potential to bring additional Mineral Resources from Savuka to book.
The CLR in the deeper portion of the orebody (below 126 level) and the VCR in the north of the mine lease are also potentially
mineable areas.
Projects
A fundamental geological research project has been initiated in order to develop a better understanding of the CLR deposition and
mineralisation. This study is critical in optimising the exploration planning and resource estimation that would underpin any future mine
expansion.
3D seismic cubes displaying the VCR and CLR horizons
background image
P
40
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Mponeng
South Africa
Mponeng
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Mponeng
Category
million
g/t
Tonnes
Moz
TauTona VCR shaft pillar
Measured
0.29
17.12
4.94
0.16
Indicated                                     1.13
19.47
22.04
0.71
Inferred                                           –
Total
1.42                       18.99
26.98
0.87
VCR above 109 Level
Measured
8.28
10.73
88.89
2.86
Indicated                                     6.96
6.31
43.96
1.41
Inferred                                           –
Total
15.25                         8.71
132.85                         4.27
VCR 109 to 120 level
Measured
3.35
21.47
72.01
2.32
Indicated                                     7.34
12.40
91.05
2.93
Inferred                                           –
Total                                         10.70
15.25
163.06
5.24
VCR below 120 level
Measured
0.34
22.51
7.59
0.24
Indicated                                     8.68
15.38
133.48
4.29
Inferred                                           –
Total                                           9.02
15.64
141.07
4.54
Mponeng WUDLS
Measured
Indicated                                     2.44
13.17
32.15
1.03
Inferred                                     11.52
14.68
169.20
5.44
Total                                          13.96
14.42
201.35
6.47
VCR Block 1
Measured
18.40
0.08
Indicated                                      3.06
3.91
11.95
0.38
Inferred                                           –
Total                                          3.06
3.93
12.02
0.39
VCR Block 3
Measured
0.01
7.02
0.10
Indicated                                     7.84
6.70
52.51
1.69
Inferred                                           –
Total
7.85                         6.70
52.61                         1.69
VCR Block 5
Measured
0.01
1.75
0.03
Indicated                                     6.04
7.16
43.25
1.39
Inferred                                           –
Total                                           6.05
7.15
43.27
1.39
background image
P
41
Mineral Resource continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Mponeng
Category
million
g/t
Tonnes
Moz
VCR outside project areas
Measured
0.09
5.49
0.48
0.02
Indicated                                     7.61
3.42
26.04
0.84
Inferred                                           –
Total                                           7.70
3.45
26.53
0.85
TauTona CLR shaft pillar
Measured
0.30
42.28
12.76
0.41
Indicated                                    1.29
45.19
58.23
1.87
Inferred                                          –
Total                                           1.59
44.64
70.99
2.28
CL below 120 level
Measured
0.01
23.70
0.35
0.01
Indicated                                   34.31
14.66
502.87
16.17
Inferred                                     11.41
14.66
167.18
5.37
Total                                         45.73
14.66
670.40
21.55
Mponeng
Total
122.32
12.60
1,541.14
49.55
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Mponeng
Measured
5 x 5
Chip sampling
Indicated
1,000 x 1,000
LIB and UG borehole drilling
Inferred
Grade control      –
See Measured category
Exclusive Mineral Resource
It is customary with the current mine design to leave 35% to 50% of the Exclusive Mineral Resource as safety and remnant pillars
ahead of current mining. These pillars and remnants are designed to provide additional stability to the mining faces during operations.
A portion of the TauTona shaft pillar and tail gold will be mined by Mponeng on both the VCR and CLR.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Mponeng
Category
million
g/t
Tonnes
Moz
Measured                                   8.52
17.26
147.04
4.73
Indicated                                  36.88
12.15
448.18
14.41
Inferred                                     7.87
19.78
155.70
5.01
Mponeng
Total                                        53.27
14.10
750.91
24.14
background image
South Africa
Mponeng
P
42
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Mponeng
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Mponeng
Category
million
g/t
Tonnes
Moz
Measured
0.35
22.56
7.94
0.26
Indicated
47.42
14.67
695.75
22.37
Inferred
22.93
14.67
336.38
10.81
Mponeng
Total
70.71
14.71
1,040.06
33.44
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Mponeng
Category
million
g/t
Tonnes
Moz
VCR above 109 level
Proved
1.80
5.63
10.14
0.33
Probable                                     1.42
5.21
7.37
0.24
Total                                          3.22
5.44
17.51
0.56
VCR 109 to 120 level
Proved
2.05
9.98
20.44
0.66
Probable                                     6.22
8.09
50.29
1.62
Total                                           8.27
8.56
70.72
2.27
VCR below 120 level
Proved
0.31
8.85
2.70
0.09
Probable                                     8.07
8.91
71.92
2.31
Total                                           8.38
8.90
74.61
2.40
TauTona CLR eastern block
Proved
Probable                                      1.66
9.12
15.11
0.49
Total                                           1.66
9.12
15.11
0.49
CL below 120 level
Proved
Probable                                     22.52
11.30
254.51
8.18
Total                                         22.52
11.30
254.51
8.18
Mponeng
Total
44.04
9.82
432.46
13.90
Mponeng:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
49.8
49.6
49.4
49.2
49.0
48.8
48.6
48.4
48.2
48.0
47.8
Change
49.83
2009
-0.70
Depletion
0.20
Gold
price
-1.44
Explo-
ration
0.00
Metho-
dology
49.55
2010
0.00
Cost
1.65
Other
Mponeng:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
14.5
14.0
13.5
13.0
12.5
12.0
Change
12.72
2009
-0.54
Depletion
0.06
Model
change
0.00
New
ounces
from
projects
2.00
Scope
change
13.90
2010
0.00
Change in
Economics
-0.34
Other
background image
P
43
Inferred Mineral Resource in business plan
No planning or scheduling took place in areas classified as Inferred Mineral Resource during the planning process.
Ore Reserve below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Mponeng
Category
million
g/t
Tonnes
Moz
Proved
0.31
8.85
2.70
0.09
Probable
30.59
10.67
326.43
10.49
Mponeng
Total
30.90
10.65
329.13
10.58
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Cut-off
Stoping
Gold
change
value
value
width
Dilution
Mponeng
price
rate
g/t Au
cmg/t Au
(cm)
(%)
MCF%
MetRF%
CL below 120 level
850
8.71
750
109.9
2
81.00
98.20
TauTona CLR eastern block
850
8.71
750
95.0
106
81.00
97.38
VCR 109 to 120 level
850
8.71
750
145.0
42
83.04
97.95
VCR above 109 level
850
8.71
750
145.0
41
82.67
97.96
VCR below 120 level
850
8.71
750
145.0
37
84.47
97.98
Mponeng
– underground (metric)
Tonnes above 
cut-off (millions)
0
20
Average grade 
above cut-off (g/t)
140
120
100
80
60
40
20
0
28
26
24
22
20
18
16
14
12
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
5
15
10
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Gareth Flitton
GSSA
9647581
8 years
Ore Reserve
Piet Enslin
PLATO
PMS0183
26 years
background image
P
44
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Savuka
South Africa
Savuka
Location
Savuka mine is located about 18km south of the town of Carletonville and forms part of AngloGold Ashanti’s West Wits operations.
The mine exploits the CLR at depths varying from 2,600 to 3,500m below surface, as well as the VCR. The VCR, which is about
700m above the CLR, has largely been mined out and mining operations in the VCR section are currently confined to extracting
remnant pillars that are above the current cut-off.
Savuka has converted from a longwall configuration to a sequential grid mine and most of the mine’s current production is derived
from the CLR. The Ore Reserve at the mine is largely exhausted and mining operations at Savuka are planned to cease in 2011.
Any remaining Ore Reserve at the mine will be extracted through Mponeng.
Geology
The CLR is a thin, tabular, auriferous quartz pebble conglomerate formed near the base of the Central Rand Group. The CLR is on
average 20cm thick and has been divided into three stratigraphic units. Economically the most important is Unit 1 which is present
as a sheet-like deposit over the whole mine. Unit 2 is a complex channel deposit that is presently only being mined in the south and
west areas of Savuka. The reef may be over 2m thick where Unit 2 is developed. Unit 3 is preserved below Unit 1 in the southern
parts of Savuka and is the oldest of the three CLR stratigraphic units.
Isometric view of Savuka shaft systems and 100 level, showing the different Intrusives that occur in the area
background image
P
45
The VCR comprises a quartz pebble conglomerate (up to 5m thick) capping the topmost angular unconformity of the Witwatersrand
Supergroup. The topography of the VCR depositional area is uneven and consists of a series of slopes and horizontal terraces at
different elevations.
The reefs at Savuka are cross-cut by faults and intrusive dykes that displace the reef horizons. The faulting, in conjunction with the
numerous intrusives that also intersect the orebody at various levels, is responsible for most of the risk inherent with deep-level gold
mining, since seismicity is associated with these features.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Savuka
Category
million
g/t
Tonnes
Moz
Ventersdorp Contact Reef
Measured
0.16
12.87
2.02
0.06
Indicated                                     0.34
13.53                         4.64                        0.15
Inferred                                           –
8.55
0.01
Total                                           0.50
13.32
6.67
0.21
Carbon Leader Reef
Measured
0.78
17.53
13.69
0.44
Indicated                                     3.79
20.00
75.74
2.43
Inferred                                           –
Total                                           4.57
19.58
89.43
2.88
Savuka
Total                                           5.07
18.96
96.10
3.09
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole      Other
Comments
Savuka
Measured
5 x 5
Chip sampling
Indicated
200 x 200
GBH drilling
Inferred
1,000 x 1,000
Surface boreholes
Grade control      –
See Measured category
Exclusive Mineral Resource
As Savuka is going into closure mode, almost all of the published Mineral Resource is classified as Exclusive Mineral Resource. Only
0.6% of the published Mineral Resource is not part of the Exclusive Mineral Resource.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Savuka
Category
million
g/t
Tonnes
Moz
Measured                                   0.93
16.73
15.63
0.50
Indicated                                    4.11
19.45                       79.85                         2.57
Inferred                                          –
8.55
0.01
Savuka
Total                                          5.04
18.94
95.49
3.07
background image
P
46
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Savuka
South Africa
Savuka
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Savuka
Category
million
g/t
Tonnes
Moz
Ventersdorp Contact Reef
Proved
0.04
3.95
0.14
0.00
Probable                                     0.18
4.95
0.88
0.03
Total                                           0.21
4.78
1.02
0.03
Carbon Leader Reef
Proved
0.05
5.88
0.28
0.01
Probable                                     3.09
6.28
19.41
0.62
Total                                           3.14
6.27
19.69
0.63
Savuka
Total                                           3.35
6.18
20.71
0.67
Inferred Mineral Resource in business plan
No planning or scheduling took place in areas classified as Inferred Mineral Resource during the planning process.
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Cut-off
Stoping
Gold
change
value
value
width
Dilution
Savuka
price
rate
g/t Au
cmg/t Au
(cm)
(%)
MCF%
MetRF%
Carbon
Leader
Reef
850
8.71
7.96
900
113.0                75
63             97
Ventersdorp
Contact
Reef
850
8.71
7.96
900
113.0                63                 63             97
Savuka:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
3.8
3.7
3.6
3.5
3.4
3.3
3.2
3.1
3.0
Change
3.84
2009
-0.04
Depletion
0.00
Gold
price
-0.25
Explo-
ration
-0.13
Metho-
dology
3.09
2010
-0.00
Cost
-0.33
Other
Savuka:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
0.7
0.6
0.5
Change
0.69
2009
-0.02
Depletion
0.00
Model
change
0.00
New
ounces
from
projects
0.00
Scope
change
0.67
2010
0.00
Change in
Economics
0.00
Other
background image
P
47
Savuka
– underground (metric)
Tonnes above 
cut-off (millions)
0
20
Average grade 
above cut-off (g/t)
5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
29
28
27
26
25
24
23
22
21
20
19
18
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
10
15
5
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Katarien Deysel
SACNASP
400093/05
9 years
Ore Reserve
Joey Modise
PLATO
MS0113
23 years
background image
P
48
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – TauTona
South Africa
TauTona
Location
TauTona lies on the West Wits Line, just south of Carletonville in the North West Province, about 70km south-west of Johannesburg.
Mining at TauTona takes place at depths ranging from 2,000 to 3,640m. The mine has a three-shaft system and is in the process of
converting from longwall mining to scattered grid mining.
Geology
The CLR is a thin, on average 20cm thick, tabular, auriferous quartz pebble conglomerate that is located near the base of the Central
Rand Group. The CLR has been divided into three facies units. Economically the most important is Unit 1, which is present as a
sheet-like deposit over the whole mine, although reef development and grades tend to drop off very rapidly where Unit 1 overlies
Unit 2. Unit 2 is a complex channel deposit that is only present along the eastern-most limit of current mining at TauTona. The Unit 2
CLR may be over 2m thick. Unit 3 is preserved below Unit 1 in the southern parts of TauTona and is the oldest of the
CLR conglomerates.
0
3km
Areas of facies dominance
No. 1 CLR
Overlap of No. 1 CLR over No. 2 CL facies
No. 2 CL facies
No. 3 CL facies
CL erosion channels
Shafts
Suboutcrops
Suboutcrop of NL vs No.1 CL
uncomformity
Suboutcrop of F/W Spc Mkr vs
No.1 CL uncomformity
Suboutcrop No.2 CL vs No.1
CL uncomformity
Legend
Driefontein
Blyvooruitzicht
Doornfontein
Deelkraal
Elandsrand
Western Ultra
Deep Levels
TauTona
Savuka
Mponeng
5E
9W
3
1A Subvertical
CL eliminated by
Master Bedding Fault
Doornfontein
erosion channel
Western Driefontein
erosion channel
2
1
N
background image
P
49
Production levels on the VCR at TauTona are currently limited, amounting to an average of 10% of total production volumes. The VCR
comprises a quartz pebble conglomerate (up to 2m thick) capping the top-most angular unconformity of the Witwatersrand
Supergroup. The topography of the VCR depositional area is uneven and consists of a series of slopes and horizontal terraces at
different elevations.
Exploration
Two development projects will be undertaken at TauTona during 2011 and include the CLR area to the east of the Bank Dyke, and
the area south of the Pretorius Fault Zone. The projects will increase the structural confidence and update the facies model within
these areas. The exploration project consists of the initial drilling of four LIBs from two different localities on 107 and 112 level
respectively. Each LIB hole will also be complemented by the drilling of at least two deflections. Drilling is scheduled to start in
January 2011 and a total of 3,900m is expected to have been drilled by November 2011.
Projects
An internal geological project has been launched to investigate the lateral movement of the Pretorius Fault Zone and the possible
implications thereof.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
TauTona
Category
million
g/t
Tonnes
Moz
VCR shaft pillar
Measured
0.16
18.53
2.94
0.09
Indicated                                     0.16
20.52
3.35
0.11
Inferred                                           –
Total
0.32                       19.54                         6.29                         0.20
EOB between 100 & 112 levels
Measured
0.14
28.38
3.98
0.13
Indicated                                     2.90
20.18
58.54
1.88
Inferred                                           –
Total                                           3.04
20.55
62.52
2.01
CLR – 1C11
Measured
0.08
24.25
1.89
0.06
Indicated                                    0.43
27.11
11.71
0.38
Inferred                                          –
Total                                          0.51
26.67
13.59
0.44
CLR base
Measured
0.36
25.11
9.11
0.29
Indicated                                     2.35
25.63
60.36
1.94
Inferred                                           –
Total                                            2.72
25.56
69.46
2.23
TauTona
Total                                            6.59
23.04
151.87
4.88
background image
South Africa
TauTona
P
50
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – TauTona
TauTona:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
6.2
6.0
5.8
5.6
5.4
5.2
5.0
4.8
Change
6.20
2009
-0.30
Depletion
0.00
Gold
price
0.10
Explo-
ration
-0.16
Metho-
dology
4.88
2010
-0.10
Cost
-0.85
Other
TauTona:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
2.8
2.7
2.6
2.5
2.4
2.3
2.2
2.1
2.0
Change
2.73
2009
-0.33
Depletion
-0.16
Model
change
0.00
New
ounces
from
projects
0.03
Scope
change
2.06
2010
0.00
Change in
Economics
-0.22
Other
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
TauTona
Measured
5 x 5
Chip sampling
Indicated
200 x 200
GBH drilling
Inferred
1,000 x 1,000
Surface boreholes
Grade control     
See Measured category
Exclusive Mineral Resource
The Exclusive Mineral Resource is dependent on mining strategy, but approximately 2.37Moz or 95% of the Exclusive Mineral
Resource is expected to be taken up in safety, boundary and remnant pillars ahead of current mining.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
TauTona
Category
million
g/t
Tonnes
Moz
Measured                                   0.50
24.49
12.16
0.39
Indicated                                    2.74
23.91
65.44
2.10
Inferred                                         
TauTona
Total                                          3.23
24.00
77.61
2.50
background image
P
51
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
TauTona
Category
million
g/t
Tonnes
Moz
VCR shaft pillar
Proved
0.17
7.76
1.35
0.04
Probable                                     0.31
7.68
2.38
0.08
Total                                          0.48
7.71
3.73
0.12
EOB between 100 &112 levels
Proved
0.17
7.79
1.32
0.04
Probable                                     2.64
9.43
24.93
0.80
Total                                           2.81
9.34
26.25
0.84
CLR – 1C11
Proved
0.03
9.21
0.32
0.01
Probable                                     0.58
9.62
5.61
0.18
Total                                          0.62
9.60
5.93
0.19
CLR base
Proved
0.31
7.52
2.31
0.07
Probable                                     2.82
9.12
25.73
0.83
Total                                          3.13
8.96
28.04
0.90
TauTona
Total                                          7.04
9.08
63.95
2.06
Inferred Mineral Resource in business plan
No planning or scheduling took place in areas classified as Inferred Mineral Resource during the planning process.
background image
P
52
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – TauTona
South Africa
TauTona
TauTona
– underground (metric)
Tonnes above 
cut-off (millions)
0
Average grade 
above cut-off (g/t)
7.0
6.5
6.0
5.5
5.0
4.5
4.0
3.5
3.0
30
29
28
27
26
25
24
23
22
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
20
15
10
5
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Katarien Deysel
SACNASP
400093/05
9 years
Ore Reserve
Joey Modise
PLATO
MS0113
23 years
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Cut-off
Stoping
Gold
change
value
value
width
Dilution
TauTona
price
rate
g/t Au
cmg/t Au
(cm)
(%)
MCF%
MetRF%
CLR – 1C11
850
8.71
10.60
1,200
113.0
56
81.82
97.23
CLR base
850
8.71
10.60
1,200
113.0
64
81.82
97.23
EOB between 100 & 112 levels
850
8.71
10.60
1,200
113.0
54
81.82
97.23
VCR shaft pillar
850
8.71
10.60
1,200
113.0
53
85.00
97.23
background image
P
53
South Africa
Surface operations
Overview
Surface operations in the South Africa Region produce gold by treating lower-grade surface material such as rock dumps and tailings
dams. The strategy is to maximise the use of the treatment gap. Uranium is also produced as a by-product from the gold-bearing
reef material that is mined at Great Noligwa, Moab Khotsong and Kopanang. The Surface operations comprise the Vaal River Surface
and West Wits Surface operations.
Location
The Vaal River Surface operations are located immediately to the north and south of the Vaal River, close to the town of Orkney in
the North West Province of South Africa. These operations re-work the marginal ore dumps (MODs) and tailings dams resulting from
the mining and processing of the VR and VCR that are mined at the Vaal River underground mines in the Klerksdorp area. Gold is
mainly produced by the reclamation of marginal ore dumps and a tailings dam called the Sulphur Paydam (SPD).
The West Wits Surface operations are located on the West Wits Line, near the town of Carletonville, straddling the border between
the North West and Gauteng Provinces in South Africa. These operations comprise MODs and tailings dams sourced from the mining
and processing of the CLR and the VCR that are mined at the West Wits underground mines in the Carletonville/Fochville area.
Ore dumps and tailings
The MODs have been built from waste rock mined from underground access development workings and hoisted, transported and
deposited via conveyor belt. The gold contained within these rock dumps was sourced from three areas:
the minor reefs that were developed in order to access the primary reef;
gold-bearing reefs that were contained within small fault blocks that were exposed by off-reef development; and
cross-tramming of gold-bearing reef material to the waste tips.
The tailings storage facility (TSF) stores the residue produced by the gold plants. These tailings were pumped in a slurry form onto
tailings dams and have been built up over a period of years.
The Vaal River Ore Reserve consists of 99Mt containing 1.54Moz of gold and the West Wits Ore Reserve consists of 11Mt containing
0.20Moz of gold. During 2010 10.3Mt were depleted and 0.18Moz of gold were produced from surface sources material. The
no. 3 MOD at Vaal River remains an Inferred Mineral Resource while the TSF has been moved into Mineral Resource as new
technology for recovering gold and uranium is being evaluated.
During 2010 the West gold plant and the marginal ore stream in the Kopanang gold plant became dedicated surface sources plants
as the treatment of Tau Lekoa and third party ore ceased.
An opportunity to upgrade marginal ore material was initiated in the West Wits area at the Savuka gold plant. The exercise has proven
to be successful and the initiative will be investigated further in 2011. The Savuka MOD is currently being screened and oversize
material of greater than 65mm is being stockpiled and will be made available to external parties once permission has been granted
to do so by the Department of Mineral Resources.
Flexibility
The no. 3 MOD at Vaal River was equipped and prepared for reclamation in 2010 and reclamation is planned to begin in 2011.
background image
P
54
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Surface operations
South Africa
Surface operations
Reclamation methodology
Bulldozers are used to create furrows through the waste rock dumps in order to mix rock from different parts of the waste rock dumps
that were deposited over different time periods. This is done in order to create a degree of homogenisation. The material is then
loaded onto rail hoppers by means of a front-end loader and transported to the metallurgical plants.
The SPD is being reclaimed by means of remote-controlled, high-pressure water pumps. In order to facilitate blending of low and
higher grade material (necessitated by a definite grade gradient that exists from the bottom to the top of the tailings dam), reclamation
takes place in a three-bench, full-face operation. From the reclamation face, the slurry flows via trenches to the SPD pump station,
where oversized material is screened out and then pumped to the East gold plant for processing.
During 2010 the East acid plant was closed down as it became uneconomic to produce sulphuric acid internally, resulting in the
treatment cost of uranium decreasing from $40/lb to $31/lb.
Environmental clean-up
Rehabilitation work is ongoing and gold is produced from clean-up operations at Vaal River where material is treated through the
archive mill. In 2010 a total of 1,929oz was produced from clean-up operations.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Vaal River Surface
Category
million
g/t
Tonnes
Moz
SA Met – Tailings dump
Measured
Indicated                                  381.01
0.31
116.92
3.76
Inferred                                          
Total                                        381.01
0.31
116.92
3.76
SA Met – Rock dump
Measured
Indicated                                    54.33
0.58
31.61
1.02
Inferred                                       5.00
0.69
3.44
0.11
Total                                          59.32
0.59
35.04
1.13
Vaal River Surface
Total
440.33
0.35
151.96
4.89
West Wits Surface
WWGO – Tailings dump
Measured
Indicated                                  168.27
0.25
41.75
1.34
Inferred                                          
Total                                        168.27
0.25
41.75
1.34
WWGO – Rock dump
Measured
Indicated                                    12.80
0.49
6.23
0.20
Inferred                                          
Total                                         12.80
0.49
6.23
0.20
West Wits Surface
Total
181.07
0.26
47.98
1.54
Surface operations
Total
621.40
0.32
199.94
6.43
background image
P
55
Vaal River Surface:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
Change
1.86
2009
-0.19
Depletion
0.00
Gold
price
-0.01
Explo-
ration
0.09
Metho-
dology
4.89
2010
3.14
Cost
0.00
Other
Vaal River Surface:
Ore Reserve reconciliation
2009 vs 2010
Ounces 
(millions)
1.74
1.72
1.70
1.68
1.66
1.64
1.62
1.60
1.58
1.56
1.54
1.52
Change
1.74
2009
-0.18
Depletion
0.01
Model
change
0.00
New
ounces
from
projects
-0.01
Scope
change
1.54
2010
0.00
Change in
Economics
-0.01
Other
West Wits Surface:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
1.6
1.4
1.2
1.0
0.8
0.6
0.4
0.2
0.0
Change
0.20
2009
-0.01
Depletion
0.00
Gold
price
0.00
Explo-
ration
0.01
Metho-
dology
1.54
2010
1.34
Cost
0.00
Other
West Wits Surface:
Ore Reserve reconciliation
2009 vs 2010
Ounces 
(millions)
0.205
0.200
0.195
0.190
0.185
0.180
0.175
Change
0.18
2009
-0.01
Depletion
0.01
Model
change
0.00
New
ounces
from
projects
0.00
Scope
change
0.20
2010
0.00
Change in
Economics
0.01
Other
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Vaal River Surface
Measured
Indicated
150 x 150
Auger drilling (tailings only)
Inferred
Grade control      –
West Wits Surface
Measured
Indicated
150 x 150
Auger drilling (tailings only)
Inferred
Grade control      –
background image
P
56
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Surface operations
South Africa
Surface operations
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Vaal River Surface
Category
million
g/t
Tonnes
Moz
Measured                                       –
Indicated                                336.25
0.30
99.79
3.21
Inferred                                          –
Vaal River Surface
Total
336.25
0.30
99.79
3.21
West Wits Surface
Measured                                       –
Indicated                                168.27
0.25
41.75
1.34
Inferred                                          –
West Wits Surface
Total
168.27
0.25
41.75
1.34
Surface operations
Total
504.52
0.28
141.54
4.55
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Vaal River Surface
Category
million
g/t
Tonnes
Moz
SA Met – Tailings dump
Proved
Probable                                    44.76
0.37
16.68
0.54
Total                                          44.76
0.37
16.68
0.54
SA Met – Rock dump
Proved
Probable                                     54.33
0.57
31.19
1.00
Total                                          54.33
0.57
31.19
1.00
Vaal River Surface
Total
99.09
0.48
47.87
1.54
West Wits Surface
WWGO – Rock dump
Proved
Probable                                    11.40
0.55
6.23
0.20
Total                                         11.40
0.55
6.23
0.20
West Wits Surface
Total
11.40
0.55
6.23
0.20
Surface operations
Total
110.49
0.49
54.10
1.74
background image
P
57
Inferred Mineral Resource in business plan
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Vaal River Surface
million
g/t
Tonnes
Moz
Comments
SA Met – Rock dump
5.00
0.69
3.44
0.11
No. 3 MOD is equipped and will be treated
from 2011
Total
5.00
0.69
3.44
0.11
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Cut-off
Stoping
Gold
change
value
value
width
Dilution
Vaal River Surface
price
rate
g/t Au
cmg/t Au
(cm)
(%)
MCF%
MetRF%
SA Met – Rock dump
850
8.71
0.41
98
88.00
SA Met – Tailings dump
850
8.71
0.37
100           40.00
West Wits Surface
WWGO – Rock dump
850
8.71
0.38
98
88.00
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Vaal River Surface
Mineral Resource
Raymond Orton
PLATO
MS0096
24 years
Ore Reserve
Richard Brokken
PLATO
MS0171
29 years
West Wits Surface
Mineral Resource
Raymond Orton
PLATO
MS0096
24 years
Ore Reserve
Richard Brokken
PLATO
MS0171
29 years
background image
P
58
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
South Africa – Uranium
South Africa
Uranium
Uranium
Moab Khotsong, Great Noligwa and Kopanang material is milled in the Noligwa gold plant and treated in the South uranium plant for
uranium extraction by the reverse leach process. The ammonium diuranate is transported to the Nufcor plant where the material is
calcined and packed for shipment to the converters.
1.46 Million pounds of uranium oxide was produced in 2010. The expansion project at the South uranium plant has commenced in
2010 and will be commissioned in 2012. This expansion project will allow for an increased amount of Kopanang material to be
processed for uranium oxide extraction.
Mineral Resource – Uranium (U3O8)
Contained uranium oxide
Tonnes
Grade
Pounds
as at 31 December 2010
Category
million
kg/t
Tonnes
million
Great Noligwa
Measured
Indicated                                    10.44
0.37
3,883
8.56
Inferred                                        0.90
0.39
352
0.78
Total                                           11.34
0.37
4,235
9.34
Kopanang
Measured                                         
Indicated                                     21.96
0.71
15,570
34.33
Inferred                                        2.13
0.55
1,174
2.59
Total                                           24.09
0.69
16,744
36.91
Moab Khotsong
Measured
Indicated                                     19.69
1.06
20,828
45.92
Inferred                                        9.82
0.89
8,726
19.24
Total                                           29.51
1.00
29.553
65.15
Vaal River Surface
Measured
Indicated                                   381.01
0.09
33,986
74.93
Inferred                                           
Total                                         381.01
0.09
33,986
74.93
Mponeng
Measured                                         
Indicated                                     35.91
0.18
6,521
14.38
Inferred                                       11.41
0.18
2,028
4.47
Total                                           47.32
0.18
8,549
18.85
Savuka
Measured                                          
Indicated                                       4.57
0.34
1,544
3.40
Inferred                                            
Total                                             4.57
0.34
1,544
3.40
background image
Mineral Resource – Uranium (U3O8) continued
Contained uranium oxide
Tonnes
Grade
Pounds
as at 31 December 2010
Category
million
kg/t
Tonnes
million
TauTona
Measured                                       
Indicated                                     6.27
0.29                         1,801                        3.97
Inferred                                          
Total                                            6.27
0.29
1,801
3.97
West Wits Surface
Measured
Indicated                                  168.27
0.07
12,098
26.67
Inferred                                           
Total                                         168.27
0.07
12,098
26.67
Total
Measured                                         
Indicated                                   648.12
0.15
96,230
212.15
Inferred                                       24.25
0.51
12,280
27.07
Total                                         672.38
0.16
108,510
239.22
Ore Reserve – Uranium (U
3
O
8
)
Contained uranium oxide
Tonnes
Grade
Pounds
as at 31 December 2010
Category
million
kg/t
Tonnes
million
Great Noligwa
Proved
0.38
0.30
113
0.25
Probable                                      0.75
0.29
221
0.49
Total                                           1.13
0.29
334
0.74
Kopanang
Proved                                        1.20
0.99
1,183
2.61
Probable                                    12.88
0.82
10,520
23.19
Total                                          14.07
0.83
11,702
25.80
Moab Khotsong
Proved
1.84
0.25
460
1.01
Probable                                    16.84
0.54
9,096
20.05
Total                                          18.69
0.51
9,556
21.07
Total
Proved                                        3.42
0.51
1,755
3.87
Probable                                    30.47
0.65
19,836
43.73
Total                                          33.89
0.64
21,591
47.60
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Raymond Orton
PLATO
MS0096
24 years
Ore Reserve
Richard Brokken
PLATO
MS0171
29 years
P
59
background image
P
60
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa
Continental Africa
Challenges in
being met
head on
Africa
Tanzania
Geita
Namibia
Navachab
Iduapriem
Mali
Morila
Guinea
Siguiri
Ghana
Obuasi
Yatela
Sadiola
DRC
Kibali
Mongbwalu
background image
P
61
Regional overview
AngloGold Ashanti has eight mining operations in its Continental Africa region:
Iduapriem and Obuasi in Ghana;
Siguiri in Guinea;
Morila, Sadiola and Yatela in Mali;
Navachab in Namibia; and
Geita in Tanzania.
It also has two advanced projects in the Democratic Republic of the Congo (DRC), namely Kibali and Mongbwalu.
Combined production from these operations declined by 6% to 1.49Moz of gold in 2010, equivalent to 33.0% of group production.
The Mineral Resource in Continental Africa, attributable to AngloGold Ashanti, totalled 71.19Moz at year-end, including an attributable
Ore Reserve of 26.98Moz.
All Mineral Resources and Ore Reserves listed are attributable unless otherwise stated.
Mineral Resource by region
Tonnes
Grade
Contained gold
as at 31 December 2010
Category
million
g/t
Tonnes
Moz
Continental Africa Region
Measured
159.11
2.78
442.04
14.21
Indicated
452.58
2.38
1,076.18
34.60
Inferred
278.73
2.50
696.01
22.38
Total
890.42
2.49
2,214.22
71.19
Ore Reserve by region
Tonnes
Grade
Contained gold
as at 31 December 2010
Category
million
g/t
Tonnes
Moz
Continental Africa Region
Proved
102.29
1.84
187.74
6.04
Probable
260.02
2.51
651.55
20.95
Total
362.31
2.32
839.30
26.98
background image
Country overview
AngloGold Ashanti has two advanced projects in the DRC, Kibali and Mongbwalu.
Kibali
On 15 October 2009 AngloGold Ashanti acquired a 50% indirect interest in Moto Goldmines Ltd through a joint venture with
Randgold. On 21 December 2009, Randgold and AngloGold Ashanti increased their joint venture interest in the Kibali gold project to
90%, whilst OKIMO retained a 10% holding.
The project is a joint development between three separate groups:
AngloGold Ashanti;
Randgold Resources Limited, who is the operator, an African-focussed gold mining and exploration business with primary listings
on the London Stock Exchange and Nasdaq; and
L’Office des Mines d'Or de Kilo-Moto (OKIMO), the state-owned gold mining company.
The consolidated lease is made up of 10 mining concessions.
Mongbwalu
The Mongbwalu Project is one of AngloGold Ashanti’s most important exploration projects and is situated within the 5,487km2 permit
covered by Concession 40 in the Ituri Province of north-eastern DRC. Concession 40 has a rich history of gold occurrences and
covers the entire Kilo Archaean granite-greenstone belt that extends approximately 850km west-northwest of Lake Albert. The
concession is held in a joint venture between AngloGold Ashanti Kilo (AGAK) and OKIMO, a governmental body which currently holds
a 13.8% non-contributory share. AGAK is 86.2% owned by AngloGold Ashanti Limited. The area around the old Adidi mine will
undergo a feasibility study as part of the agreement with the DRC government.
Mineral Resource estimation
Mineral Resource estimation is undertaken by either in-house Competent Persons or by approved external consultants. The results
of both diamond drilling (DD) and reverse circulation (RC) drilling are used in the estimation process. 3D mineralised envelopes are
established using both grade and geology and these are then statistically verified to confirm their validity for use in grade estimation.
Volumes are then filled with block model cells and these are then interpreted for density, rock type and grade, the latter using ordinary
kriging. The use of borehole grade top cuts is applied to prevent the spread of high grades during the estimation process. Drill-hole
spacing is used to guide the Mineral Resource classification according to requirements of the relevant reporting codes. Open pit
Mineral Resources are quoted within a limiting shell and underground Mineral Resources are quoted above a specified cut off.
Ore Reserve estimation
The Ore Reserve for Kibali has been based on the Karagba, Chauffeur and the Sessenge Deeps high-grade domains. High-grade
domains (1.0-4.0g/t) within the ordinary kriged resource model are commonly surrounded by a low-grade (+0.3g/t) halo. 3D models of
each of these domains are created as the most prospective zones to be considered for mining.
The open pit Ore Reserves were completed on the 3D ordinary kriged resource model using Whittle® pit shell optimisations. This
incorporated the mining layout, operating factors, stripping ratio and relevant cut-off grade for the mineral reserve. An open
pit/underground interface was determined as optimal at 5,685mRL between the KCD open pit and underground mine.
A cut-off grade analysis at US$800/oz was used to determine a cut-off grade of 2.1g/t for the underground mine. Longitudinal and
transverse stoping methods with hydraulic and waste rock fill were chosen as the preferred mining method. Underground stope designs
were updated from the previously reported Ore Reserve, using the 3D ordinary kriged resource model. Datamine® software was used
to compile the Ore Reserve through an automated stope creation process. Modifying factors for planned and unplanned rock dilution,
backfill dilution and ore loss were used to amend the reported Ore Reserve. Metallurgical, environmental, social, legal, marketing and
economic factors are perceived to be adequately considered in the Kibali feasibility study for the Ore Reserves to remain viable.
P
62
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – DRC
DRC
background image
P
63
DRC
Kibali
Location
The Kibali concession areas are located in the north-eastern part of the DRC near the international borders with Uganda and Sudan.
The local office of Kibali Goldmines is located in the village of Doko, which is centrally located within the project area and
approximately 180km by road from Arua on the Ugandan border and immediately north of the town of Watsa. The project area is
centred at approximately 3.13º north and 29.58º east in the administrative district of Haut Uélé in Province Orientale.
The district capital of Watsa lies about 9km to the south of the project, which is situated just north of the Kibali River on the road to
Faradje and the Sudan. The town of Bunia, which is the United Nations controlled entry point to north-eastern DRC, lies about 200km
to the south of the project.
Democratic
Republic of
the Congo
Angola
CAF
Sudan
Uganda
Tanzania
Democratic
Republic of the
Congo
0
o
-10
o
15
o
20
o
25
o
25
o
Congo
Luanda
Kinshasa
Brazzaville
Burundi
Bujumbura
Rwanda
Kigali
Goma
Kisingani
Kibali
500km
Upper Proterozoic – Recent
Middle Proterozoic
Lower Proterozoic
Archaean
Legend
background image
DRC
Kibali
P
64
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Kibali
Geology
The Moto Goldfields are located within the Moto Greenstone Belt, which consists of the Archaean Kibalian (Upper and Lower)
volcano-sedimentary rocks and ironstone-chert horizons that have been metamorphosed to greenschist facies. It is cut by regional-
scale north, east, north-east and north-west trending faults and is bounded to the north by the Middle Archaean West Nile granite-
gneiss complex and cut to the south by the Upper Zaire granitic complex.
The stratigraphy consists of a volcano-sedimentary sequence comprising fine-grained sedimentary rocks, several varieties of
pyroclastic rocks, basaltic flow rocks, mafic-intermediate intrusions (dykes and sills) and intermediate-felsic intrusive rocks (stocks,
dykes and sills). The sequence is variably altered from slight to intense, such that in some cases the original lithology of the rock is
unrecognisable.
background image
P
65
Several major mineralised trends are outlined by the soil geochemistry data and by the distribution of known gold mineralisation.
The Kibali-Durba-Karagba Trend and the Gorumbwa-Kombokolo Splay are anomalous with respect to gold endowment and together,
define a mineralised, north-east-striking ‘mineralised corridor’, 1.5km wide and 8km long. These corridors host the orebodies of
Kibali, Sessenge, Gorumbwa, Durba, Chauffeur, Karagba and Pakaka.
The main deposit, which comprises the combination of Karagba, Chaffeur and Durba, is colloquially termed the KCD deposit and
hosts 49% of the grant’s Mineral Resource and 62% of the Ore Reserve (for both open pit and underground mining options). The
next biggest deposit is Pakaka, which hosts some 5% of the Mineral Resource and 6% of the Ore Reserve. Currently only the KCD
deposit hosts an underground Ore Reserve and this constitutes 83% of the total KCD Ore Reserve.
Gold mineralisation is generally associated with structural features, resulting in tightly constrained zones which often host pods
or lenses of plunging orebodies. Alteration is closely associated with the mineralisation and is typically carbonate-silica-albite with
minor sulphide.
Exploration
A large amount of exploration was undertaken by the previous owners of the Kibali project, Moto Goldmines Ltd, and this was
focussed primarily on the KCD deposit. Since the acquisition of the concession area by AngloGold Ashanti and Randgold, the
dominant exploration targets have been the KCD underground area and upgrading the confidence in the proposed KCD open pit.
A feasibility study is currently underway which is due for completion in 2011. Exploration will continue to focus on confidence
upgrades and ore extensions around the KCD deposit.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Kibali
Category
million
g/t
Tonnes
Moz
Open pit
Measured
Indicated                                    33.62
2.09                       70.23                         2.26
Inferred                                      17.00
2.27
38.57
1.24
Total
50.62                         2.15
108.80
3.50
Underground
Measured                                       
Indicated                                   22.15
5.38
119.19
3.83
Inferred                                      9.39
3.21
30.13
0.97
Total                                         31.54
4.73
149.33
4.80
Kibali
Total                                         82.16
3.14
258.13
8.30
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole      Other
Comments
Kibali
Measured
Indicated
40 x 40
Inferred
40 x 80, 80 x 80
background image
P
66
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Kibali
DRC
Kibali
Exclusive Mineral Resource
The existence of the Exclusive Mineral Resource is primarily due to the gold price differential between the Mineral Resource and
Ore Reserve. At the KCD deposit it is also partially due to the selection of a fixed interface between the open pit and the underground
mining areas. At KCD the Exclusive Mineral Resource makes up 37% of the total Mineral Resource and for the entire grant the
Exclusive Resource comprises 45% of the total Mineral Resource.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Kibali
Category
million
g/t
Tonnes
Moz
Measured                                      
Indicated                                  22.33
2.18
48.73
1.57
Inferred                                    26.39
2.60
68.71
2.21
Kibali
Total                                         48.72
2.41
117.44
3.78
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Kibali
Category
million
g/t
Tonnes
Moz
Underground
Measured                                        
Indicated                                  22.15
5.38                     119.19
3.83
Inferred                                      9.39
3.21
30.13
0.97
Kibali
Total
31.54
4.73                     149.33
4.80
Kibali:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
9.1
9.0
8.9
8.8
8.7
8.6
8.5
8.4
8.3
8.2
Change
8.89
2009
-0.58
Depletion
0.74
Gold
price
-0.17
Explo-
ration
-0.41
Metho-
dology
8.30
2010
-0.12
Cost
-0.05
Other
Kibali:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
4.6
4.5
4.4
4.3
4.2
4.1
4.0
3.9
Change
4.14
2009
0.00
Depletion
-0.14
Model
change
0.00
New
ounces
from
projects
-0.10
Scope
change
4.52
2010
0.28
Change in
Economics
0.35
Other
background image
P
67
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Kibali
Category
million
g/t
Tonnes
Moz
Kibali – Open pit
Proved
Probable                                    16.82
2.67
44.94
1.44
Total                                          16.82
2.67
44.94
1.44
Kibali – Underground
Proved
Probable                                     16.62
5.76
95.75
3.08
Total                                          16.62
5.76
95.75
3.08
Kibali
Total
33.44
4.21
140.69
4.52
Inferred Mineral Resource in business plan
Some Inferred Mineral Resource was included in the optimisation process. Only the KCD deposit had more than 5% and much of
this is covered by a line of old Belgium drilling which confirmed its presence. This drilling information has not been used in the
estimation or classification, and as such, is not included in the Ore Reserve.
background image
P
68
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Kibali
DRC
Kibali
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
Experience
Mineral Resource
Tom Gell
AusIMM
211795
18 years
Ore Reserve
Alex Bals
PLATO
PMS0174
16 years
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
% RRF
% RRF
% MRF
% MRF
Gold
change
value
Dilution    (based on
(based   (based on
(based
Kibali
price
rate
g/t Au
(%)
tonnes)
on g/t)
tonnes)
on g/t)
MCF%     MetRF%
Open pit
800
1.08
10
50
28
84.50
Underground
800
2.10
8
33
19
91.30
Kibali
– surface (metric)
Tonnes above 
cut-off (millions)
0
9
Average grade above 
cut-off (g/t)
55
50
45
40
35
30
25
20
15
10
5
0
14
12
10
8
6
4
2
0
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
2
3
1
4
5
6
7
8
Kibali
– underground (metric)
Tonnes above 
cut-off (millions)
0
9
Average grade 
above cut-off (g/t)
70
60
50
40
30
20
10
0
13
12
11
10
9
8
7
6
5
4
3
2
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
2
3
1
4
5
6
7
8
10
background image
P
69
DRC
Mongbwalu
Location
The Mongbwalu Project is located within Permis d’Exploitation No. 5105, which covers an area of 396km2. It forms part of a larger
concession of exploitation licences, totalling 5,487km2 , that are held in the Ituri province of the north-eastern DRC. The district capital
of Bunia lies just to the south and west of the concession area, some three hours by road from the project site. Bunia is in turn
approximately one hour’s flight from Entebbe, Uganda, which hosts the nearest major airport.
Geology
The Mongbwalu project is located within the Kilo Archaean granite-greenstone belt that extends 850km west-north-west of Lake
Albert and is approximately 3,000km2 in extent. The oldest known rocks in the region are basement gneisses which have been dated
at more than 3,400Ma. Granitoid rock comprise more than 80% of this belt, which includes rafts of Kibalian rocks that have been
intruded by 2,651Ma old diorites of variable mineralogy.
The Kibalian rocks have been divided into an upper and lower unit. The lower unit is dominated by magnesium-rich tholeiitic basalt
whilst the upper is dominated by schists, quartzites and banded iron formations that have been intruded by quartz monzonites.
The relationship between the upper and lower units appears to be conformable.
background image
DRC
Mongbwalu
P
70
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Mongbwalu
The Kilo Archaean granite-greenstone belt was part of the Tanzania shield but was separated by Late Proterozoic crustal mobilisation
and then by later rifting along the Eastern Rift Valley system. The predominantly flatly east-dipping thrust planes, quartz reefs, thrust
zones and mylonites are thought to be aged at 2,647Ma. The rocks have undergone regional metamorphism, ranging from upper green
schist to lower amphibolite facies. During the formation of the East African rift system over the period 100-200Ma, north-south faults
formed along which dolerite-lamprophyre dykes were intruded. There is also evidence of some younger faulting in the region. The area
has undergone weak lateritic weathering to shallow depths. Cover sequences are thin and are generally no greater than 1m thick
The mineralisation is hosted within anatomising mylonite bodies which average around 10-15m in width. At Mongbwalu, these mylonite
bodies can be subdivided into three main blocks that are separated by two late north-south trending faults that offset mineralisation by
up to 200m. The fault blocks are termed the eastern, central and western blocks (Nzebi, Adidi and Kanga mylonites).
The mylonites are composed of quartz, dolomite, calcite, chlorite, sericite and albite. They generally dip to the east and are brought
closer to the surface by the two late reverse north-south trending faults. The main mineralisation is hosted within the central and
eastern blocks within what appears to be continuous mylonite horizons. The gold is generally not distributed evenly throughout the
mylonite and the majority of it occurs as discrete boudinaged zones associated with quartz veining and silicification. The gold
predominantly occurs as free gold, and is often visible in greyish quartz veins and veinlets or disseminated through silicified zones
within the mylonite. Sulphides present in the mylonite include pyrite, pyrrhotite, chalcopyrite, sphalerite and galena.
Granitoids dominated by diorite, quartz diorite and tonalite form the footwall and hangingwall to the mineralisation in the potential
Mineral Resource area. However, at Nzebi Mine, east-west striking talc carbonate schists of mafic to ultramafic composition and
massive para-amphibolite predominate.
Mongbwalu
3D geological model viewed from the south showing local geology and shallow east-dipping orebodies in red
background image
P
71
Exploration
As a result of the 2008 conceptual study and the 2009 Mineral Resource estimate it was decided to advance the Mongbwalu project
with a 50m by 25m infill drilling campaign aimed at upgrading the Mineral Resource estimate from Inferred to Indicated Mineral
Resource. The intention was to upgrade the high-grade areas identified in the conceptual mine design for extraction during the first
five years of mine life.
Based on the information from the 2009 Mineral Resource model and grade estimate, a programme was designed to upgrade
approximately 1.0Moz of the Inferred to Indicated Mineral Resource, which has successfully been achieved.
Geo-metallurgical and geo-technical data requirements within the Mineral Resource area were identified and separate programmes
to meet these requirements compiled. These programmes include geotechnical drilling for civil engineering purposes, limited
sterilisation and condemnation drilling and water drilling. In total some 26,400m of drilling was completed.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Mongbwalu
Category
million
g/t
Tonnes
Moz
Underground
Measured                                       –
Indicated                                   3.90
7.18
27.99
0.90
Inferred                                    4.15
7.52
31.23
1.00
Total                                        8.05
7.36
59.22
1.90
Mongbwalu
Total                                        8.05
7.36
59.22
1.90
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Mongbwalu Measured
Indicated
25 x 50
Inferred
50 x 100
Exclusive Mineral Resource
The Mongbwalu Mineral Resource is reported above a cut-off grade of 2.8g/t Au. The mineralisation has been classified as Indicated
Mineral Resource and represents a drill spacing of 25m x 50m. The Exclusive and Inclusive Mineral Resource numbers are currently
identical due to the absence of Ore Reserves.
background image
P
72
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Mongbwalu
DRC
Mongbwalu
background image
P
73
Mongbwalu:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
2.1
2.0
1.9
1.8
1.7
1.6
1.5
1.4
1.3
1.2
1.1
1.0
Change
2.10
2009
0.00
Depletion
0.00
Gold
price
0.00
Explo-
ration
-0.19
Metho-
dology
1.90
2010
0.00
Cost
0.00
Other
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Paul Young
SACNASP
400270/05
24 years
Mongbwalu
– underground (metric)
Tonnes above 
cut-off (millions)
0
10
Average grade
above cut-off (g/t)
45
40
35
30
25
20
15
10
5
0
14
12
10
8
6
4
2
0
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
2
4
6
8
12
background image
P
74
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Ghana
Ghana
Country overview
AngloGold Ashanti has two mines in Ghana: Obuasi, which has both surface and underground operations and Iduapriem, an open-
pit mine. Obuasi and Iduapriem are both wholly owned by AngloGold Ashanti. Obuasi is located in the Ashanti region of southern
Ghana, approximately 80km south of Kumasi. It is primarily an underground mine operating at depths of up to 1,500m with a
continuous history of mining dating back to the 1890s.
The orebody consists of two main ore types, firstly, quartz veining with non-refractory free gold and secondly, a sulphide-hosted
mineralisation style generally associated with arsenopyrite which is refractory. Three main structural trends control the gold
mineralisation within a 9km long continuous zone which remains open at depth. The Obuasi orebody is considered one of the classic
Birimian hosted orebodies.
At Iduapriem, situated in the western region of Ghana, some 70km north of the coastal city of Takoradi and 10km south-west of
Tarkwa, the gold mineralisation is hosted by the Proterozoic Banket Series, a conglomerate sequence of the Tarkwaian System.
Mineral Resource estimation
Mineral Resource estimates are derived from interpretations of information about the location, shape, continuity and grade of the
individual orebodies.
The underground Mineral Resource at Obuasi is estimated using block models within the delineated mineralised ore zones.
The geological interpretation is based on diamond drill and cross-cut sampling information. A prototype block model of 20m x 5m
x 15m representing the minimum mining unit was used and estimates are based on ordinary kriging.
Although no open-pit mining has taken place at Obuasi since 2005, three pits still contain a Mineral Resource. The open pit Mineral
Resource at Obuasi and Iduapriem was estimated using 3D computer block models constructed using Datamine® software.
Geological interpretation was based on trench and reverse circulation and/or diamond drilling data. A prototype block model of
30m x 30m x 10m was used by the geological model and ordinary kriging as the primary estimation methodology.
Surface stockpiles volumes are based on surveyed figures and grades based on historical sampling. Tailings are part of the Mineral
Resource with tonnes and grades based on combinations of 3D block models of some dams and historical metallurgical
discharge data.
Ore Reserve estimation
The 3D Mineral Resource models are used as the basis for the Ore Reserve. An ore envelope is developed using the Mineral Resource
block model, geological information and the relevant cut-off grade, which is then used for mine design. Datamine® ’s Mineral Resource
Optimizer is used to generate the ore envelope. An appropriate mining layout is designed that incorporates mining extraction losses
and dilution factors.
background image
P
75
Ghana
Iduapriem
Location
Iduapriem is located in the western region of Ghana, some 85km north of the coastal city of Takoradi and approximately 8km
south-west of the town of Tarkwa. Iduapriem is an open pit mine which commenced mining operations in 1992. Its processing
facilities include a 4.2Mtpa carbon-in-pulp (CIP) plant with a gravity circuit. The gravity feed recovers about 30% of the gold and the
CIP plant recovers the remainder.
Geology
Iduapriem is located within the Tarkwaian Group and forms part of the West Africa Craton which is covered to a large extent by
metavolcanics and metasediments of the Birimian Supergroup. In Ghana, the Birimian terrane consists of north-east/south-west
trending volcanic belts separated by basins. The Tarkwaian Group was deposited in these basins as shallow water deltaic sediments.
The gold mineralisation is contained in the Proterozoic Banket Series conglomerates that were developed within these sediments.
The Banket Reef Zone (BRZ) comprises a sequence of individual beds of quartz pebble conglomerates, breccia conglomerates,
quartzites and grits. The outcropping Banket Series in the mine lease area forms prominent curved ridges that extend southwards
from Tarkwa, westwards through Iduapriem and northwards towards Teberebie.
Isometric view of the Iduapriem orebody
background image
P
76
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Iduapriem
All known gold mineralisation within the Banket Series is associated with the conglomerates and is found within the matrix that binds
the pebbles together. The gold content is a function of the size and amount of packing of the quartz pebbles within the conglomeratic
units. At Iduapriem, the gold mineralisation is unrelated to metamorphic or hydrothermal alteration events and the gold is coarse
grained, particulate and free milling. Mineralogical studies indicate that the grain size of native gold particles ranges between 2 and
500 microns and averages 130 microns. Sulphide mineralisation is present only at trace levels and is not associated with the gold.
The Mineral Resource originates from four mining block areas, namely Blocks 3W, 5, 7 & 8 and Ajopa. Evaluation of the Mineral
Resource was carried out using Datamine® software to generate 3D wireframe models of the mineralisation. These models are based
on geological information and 0.5g/t sample cut-off boundaries defined on 50m sections.
Exploration
Iduapriem is a mature operation and there is little prospect of adding to its surface Mineral Resource. The main potential for future
expansion is dependent on the economic viability of its underground potential. Work on this proposal has been limited to reviewing
the existing limited data to determine if an economic Mineral Resource could be delineated to support an underground mining
proposition. Due to the paucity of data, a five-year phased drilling programme is being implemented, commencing in 2011. The
purpose of this initial drilling programme is two-fold:
test the validity of the conceptual geological model; and
increase the geological confidence of the delineated payshoots to the Inferred Mineral Resource category.
Ghana
Iduapriem
background image
P
77
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Iduapriem
Category
million
g/t
Tonnes
Moz
Ajopa
Measured                                    7.29
2.00
14.55
0.47
Indicated
0.55
1.06                        0.59                         0.02
Inferred
1.58
1.40
2.21                        0.07
Total
9.43
1.84
17.35
0.56
Block 3W
Measured
Indicated                                     2.25
1.52
3.41
0.11
Inferred                                       0.84
1.29
1.09
0.03
Total                                           3.09
1.46
4.50
0.14
Block 5
Measured
5.96
1.24
7.41
0.24
Indicated                                     1.71
1.28
2.19
0.07
Inferred                                       0.66
1.42
0.94
0.03
Total                                           8.34
1.27
10.55
0.34
Blocks 7 and 8
Measured
15.42
1.37
21.07
0.68
Indicated                                   43.17
1.73
74.64
2.40
Inferred
12.40                         1.82
22.53
0.72
Total                                         70.99
1.67
118.24
3.80
Stockpile (full grade ore)
Measured
3.89
1.04
4.06
0.13
Indicated                                         –
Inferred                                           –
Total                                           3.89
1.04
4.06
0.13
Stockpile (other)
Measured
Indicated
–                            –                             –
Inferred                                      16.50
0.56
9.32
0.30
Total                                           16.50
0.56
9.32
0.30
Iduapriem
Total                                          112.23
1.46
164.01
5.27
background image
Ghana
Iduapriem
P
78
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Iduapriem
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Iduapriem
Measured
50 x 50, and
50 x 100
Indicated
50 x 75, and
75 x 100
Inferred
40 x 40, and
Old leach pads – portions drilled
100 x 100
approximately 40 x 40m
Grade control     10 x 12, and
10 x 15
Exclusive Mineral Resource
The Exclusive Mineral Resource listed below is derived mainly from the following:
Inferred Resource located within the optimised Ore Reserve pit shell; and
Mineral Resource located outside the Ore Reserve shell but within the optimised Mineral Resource shell. This consists mainly of
down-dip extensions of the ore zones, most of which may be mineable at a higher gold price.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Iduapriem
Category
million
g/t
Tonnes
Moz
Measured                                   3.33
1.75
5.82
0.19
Indicated                                  22.98
1.70
38.99
1.25
Inferred                                    31.99
1.13
36.09
1.16
Iduapriem
Total                                         58.31
1.39
80.90
2.60
Iduapriem:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
5.3
5.2
5.1
5.0
4.9
4.8
4.7
4.6
4.5
4.4
4.3
Change
4.60
2009
-0.23
Depletion
0.72
Gold
price
0.00
Explo-
ration
0.50
Metho-
dology
5.27
2010
-0.32
Cost
0.00
Other
Iduapriem:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
2.50
2.45
2.40
2.35
2.30
2.25
2.20
2.15
2.10
Change
2.40
2009
-0.25
Depletion
0.03
Model
change
0.00
New
ounces
from
projects
0.31
Scope
change
2.49
2010
-0.03
Change in
Economics
0.03
Other
background image
P
79
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Iduapriem
Category
million
g/t
Tonnes
Moz
Ajopa
Proved                                       4.88
1.88
9.19
0.30
Probable                                     0.36
1.05
0.38
0.01
Total                                           5.23
1.83
9.56
0.31
Block 3W
Proved
Probable                                      1.89
1.47
2.79
0.09
Total                                           1.89
1.47
2.79
0.09
Block 5
Proved
5.48
1.13
6.18
0.20
Probable                                      1.62
1.13
1.83
0.06
Total                                           7.10
1.13
8.02
0.26
Blocks 7 and 8
Proved
14.98
1.31
19.66
0.63
Probable                                    20.83
1.61
33.50
1.08
Total
35.81                          1.48
53.15                         1.71
Stockpile (full grade ore)
Proved
3.89
1.04
4.06
0.13
Probable                                          –
Total                                           3.89
1.04
4.06
0.13
Iduapriem
Total                                          53.92
1.44
77.58
2.40
background image
P
80
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Iduapriem
Ghana
Iduapriem
Iduapriem
– surface (metric)
Tonnes above 
cut-off (millions)
0.0
3.0
Average grade
 above cut-off (g/t)
1.0
0.5
100
90
80
70
60
50
40
30
20
10
0
4.0
3.5
3.0
2.5
2.0
1.5
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
1.5
2.5
2.0
Inferred Mineral Resource in business plan
The Inferred Mineral Resource within the Ore Reserve design is 5% of the total ore scheduled (51.58Mt) and exists as pockets of
Inferred material that sit within the models of all the deposits.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Iduapriem
million
g/t
Tonnes
Moz
Comments
Ajopa
0.65
1.61
1.05
0.03
RC drilling will be done on every bench (18m)
for better definition when mining commences
Block 3W
0.31
1.31
0.41
0.01
RC drilling will be done on every bench (18m)
for better definition when mining commences
Block 5
0.57
1.15
0.65
0.02
Resource drilling to convert to Ore Reserves
when mining commences
Blocks 7 and 8
0.99
1.40
1.39
0.04
RC drilling on every bench (18 m) for better
definition
Total 2.52
1.39
3.50
0.11
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
% RRF
% RRF
% MRF
% MRF
Gold
change
value
Dilution   (based on
(based   (based on
(based
Iduapriem
price
rate
g/t Au
(%)
tonnes)
on g/t)
tonnes)
on g/t)
MCF%     MetRF%
All projects and pits
850
100
100
100
94
100
95.00
background image
P
81
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Kwasi Osei
AusIMM
112723
16 years
Ore Reserve
Stephen Asante Yamoah
AusIMM
304095
6 years
background image
P
82
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Obuasi
Ghana
Obuasi
Location
Obuasi is located in the Ashanti Region of Ghana, some 320km north-west of the capital Accra. It lies at latitude 6º12’ north, longitude
1º40’ west and at an elevation of 280m above sea level. The mine is situated in a largely forested region, with surrounding land
occupied by subsistence farming. The mining concession covers an area of 47,500Ha. Eighty communities are located within a 30km
radius of the mine.
Geology
The mine is located within the Obuasi concession area in south-western Ghana along the north-easterly striking Ashanti volcanic belt.
The deposit is in one of the most significant Proterozoic gold belts discovered to date. The Ashanti belt consists predominantly of
sedimentary and mafic volcanic rocks and is the most prominent of the five Birimian gold belts found in Ghana. The belt is a 300km
wrench fault system that extends from Dixcove in the south-west to beyond Konongo in the north-east.
The Birimian was deformed, metamorphosed and intruded by syn- and post-tectonic granitoids during the Eburnean tectonothermal
event around two billion years ago. Folding trends are dominantly north-north-east to north-east. Elongate syn-Birimian basins
developed between the ridges of the Birimian system and these were filled with the Tarkwaian molasse sediments made up primarily
of conglomerates, quartzose and arkosic sandstones and minor shale units.
Major faulting has taken place along the same trends as the folding. These shear zones are commonly associated with pervasive
silica, carbonate and sulphide hydrothermal alteration and occur in tightly folded Lower Birimian schists, phyllites meta greywackes
and tuffs along the eastern limb of the Kumasi anticlinorium. The shear zones are found in close proximity to the contact between
these rocks and the harder metamorphosed and metasomatically altered intermediate to basic upper Birimian volcanics. The contact
between the harder metavolcanic rocks to the east and the more argillaceous rocks to the west is thought to have formed a plane
of weakness as a result of the contrast in competency between the lithological units. During crustal movement, this plane became a
zone of shearing and thrusting coeval with the compressional phases. Adjacent to the shear zones, the metasediments are replaced
by sericitic, chloritic and carbonaceous schists, which may be graphitic in places. The gold mineralisation at Obuasi occurs within the
fault zones and multiple lodes of mineralisation are a common feature.
Model of the Obuasi orebody
Southern orebody
Central orebody
Northern orebody
background image
P
83
Exploration
Exploration on the Obuasi concession is currently limited to underground drilling to explore the Obuasi Deeps below 50 level and the
southern extensions of the current mining areas above 50 level.
Projects
A major project has been embarked upon at Obuasi to convert the current mining method of transverse and longitudinal open stoping
to a longitudinal retreat mining method (LRMM). The conversion will take place in mining blocks where it is most suitable to do so.
The major advantage of this method is that it should result in a reduction of waste development of up to 50%. It will also reduce
capital expenditure and provide additional reef drive exposure.
The Pompora reclamation project will consist of a reclamation station and pipeline that will enable the Kokoteasua and Pompora TSFs
to be reclaimed. The reclaimed material will then be pumped to the tailings sulphide plant (TSP) to extract the gold, and this project
is planned to commence in 2011.
background image
P
84
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Obuasi
Ghana
Obuasi
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Obuasi
Category
million
g/t
Tonnes
Moz
Anyankyirem
Measured                                   0.40
2.41
0.97
0.03
Indicated                                    2.86
2.60
7.44
0.24
Inferred                                     0.78
2.49
1.94
0.06
Total                                         4.04
2.56
10.35
0.33
Anyinam
Measured                                   0.00
2.35
0.00
0.00
Indicated                                    0.04
3.20
0.14
0.00
Inferred                                     0.12
3.74
0.44
0.01
Total                                         0.16
3.59
0.58
0.02
Gyabunsu-Sibi
Measured                                      –
Indicated                                    0.17
4.77
0.80
0.03
Inferred                                      0.21
4.76
0.98
0.03
Total                                          0.37
4.76
1.79
0.06
Tailings (Kokoteasua)
Measured
3.22
1.97
6.33
0.20
Indicated
1.65                         1.96                         3.24
0.10
Inferred                                          –
Total                                           4.87
1.96
9.57
0.31
Tailings (Pompora)
Measured
Indicated                                          –
Inferred                                     33.61
1.57
52.89
1.70
Total                                          33.61
1.57
52.89
1.70
Other surface resources
Measured
Indicated                                         –
Inferred                                      0.79
2.40
1.90
0.06
Total                                          0.79
2.40
1.90
0.06
Upper mine
Measured
3.50
10.14
35.54
1.14
Indicated                                    1.70
8.24
13.99
0.45
Inferred                                     1.66
10.71
17.80
0.57
Total                                          6.86
9.81
67.34
2.16
Above 50 base
Measured
34.00
7.59
257.90
8.29
Indicated                                   25.31
6.38
161.41
5.19
Inferred                                     25.77
6.56
169.10
5.44
Total                                         85.08
6.92
588.41
18.92
background image
P
85
Mineral Resource continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Obuasi
Category
million
g/t
Tonnes
Moz
Adansi 50-60
Measured
1.69
5.66
9.59
0.31
Indicated                                    1.27
4.68
5.94
0.19
Inferred                                     2.82
5.55
15.63
0.50
Total                                          5.78
5.39
31.16
1.00
Stockpile (heap leach)
Measured
0.47
0.50
0.23
0.01
Indicated                                        –
Inferred                                          –
Total                                          0.47
0.50
0.23
0.01
Adansi 60-70
Measured
0.26
5.21
1.34
0.04
Indicated                                     0.31
5.31
1.63
0.05
Inferred                                       1.68
7.14
11.97
0.38
Total
2.24
6.67                       14.93                         0.48
Stockpile (surface oxides)
Measured
0.03
1.72
0.05
0.00
Indicated                                         –
Inferred                                           –
Total                                           0.03
1.72
0.05
0.00
KMS 50-60
Measured
0.70
18.22
12.67
0.41
Indicated                                     2.20
18.52
40.79
1.31
Inferred                                       3.07
10.91
33.55
1.08
Total                                            5.97
14.57
87.01
2.80
Stockpile (surface sulphides)
Measured
0.30
2.64
0.78
0.03
Indicated                                         –
Inferred                                          –
Total                                           0.30
2.64
0.78
0.03
KMS 60-70
Measured
0.00
12.48
0.00
0.00
Indicated                                     0.18
14.16
2.62
0.08
Inferred                                      2.76
17.62
48.70
1.57
Total                                          2.95
17.40
51.32
1.65
Obuasi
Total                                        153.53
5.98
918.32
29.52
background image
P
86
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Obuasi
Ghana
Obuasi
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole    Other
Comments
Obuasi: surface
Measured
20 x 20,
Auger drilling, historical information.
50 x 50
No current exploration or production.
Indicated
30 x 30,
Auger drilling, historical information.
50 x 50 and
No current exploration or production.
60 x 60
Inferred
90 x 90
Auger drilling, historical information.
No current exploration or production.
Grade control     10 x 10
Obuasi: underground
Measured
20 x 20
Indicated
60 x 60
Inferred
120 x 120
Grade control      1.5 x 25
Chip sampling of development ends
Exclusive Mineral Resource
The Exclusive Mineral Resource is made up of material from underground, open pit and tailings. The bulk of the Exclusive Mineral
Resource (71%) is from underground and of this, approximately 52% is locked up in Mineral Resource blocks and remnants of
historically mined out areas in the northern section of the mine. Some of the Exclusive Mineral Resource will be brought into the Ore
Reserve as mining development is put into place to access these areas, and also as the economic criteria changes. Further drilling
will increase the confidence in the Inferred Mineral Resource to bring this material into the Ore Reserve in the near future.
Approximately 10% of the Exclusive Mineral Resource is from tailings and will be brought into the Ore Reserve as infrastructure is
developed and capacity is increased in the new TSP. None of the open pits are currently included in the Ore Reserve, to bring the
open pits into the Ore Reserve will require more geotechnical investigation, optimisation and mine design.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Obuasi
Category
million
g/t
Tonnes
Moz
Measured                                 26.35
7.62
200.70
6.45
Indicated                                  11.48
3.94
45.27
1.46
Inferred                                    73.27
4.84
354.92
11.41
Obuasi
Total                                       111.10
5.41
600.90
19.32
background image
P
87
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Obuasi
Category
million
g/t
Tonnes
Moz
Measured
2.65
8.92
23.60
0.76
Indicated
3.80
12.79
48.66
1.56
Inferred
7.81
8.40
65.64
2.11
Obuasi
Total
14.26
9.67
137.90
4.43
background image
P
88
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Obuasi
Ghana
Obuasi
Obuasi:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
29.8
29.7
29.6
29.5
29.4
29.3
29.2
29.1
Change
29.53
2009
-0.35
Depletion
0.00
Gold
price
0.11
Explo-
ration
0.50
Metho-
dology
29.53
2010
0.00
Cost
-0.26
Other
Obuasi:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
9.7
9.6
9.5
9.4
9.3
9.2
9.1
9.0
8.9
Change
9.65
2009
-0.58
Depletion
0.31
Model
change
0.00
New
ounces
from
projects
-0.46
Scope
change
8.92
2010
0.00
Change in
Economics
0.00
Other
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Obuasi
Category
million
g/t
Tonnes
Moz
Tailings (Kokoteasua)
Proved
1.78
1.96
3.48
0.11
Probable                                     3.16
1.96
6.19
0.20
Total                                          4.94
1.96
9.67
0.31
Above 50 base
Proved
13.01
7.32
95.28
3.06
Probable                                   18.73
7.32
137.10
4.41
Total
31.74
7.32
232.38
7.47
KMS 50-60
Proved
Probable                                      2.71
13.08
35.49
1.14
Total                                           2.71
13.08
35.49
1.14
Obuasi
Total                                           39.39
7.05
277.55
8.92
Inferred Mineral Resource in business plan
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Obuasi
million
g/t
Tonnes
Moz
Comments
Tailings (Pompora)
32.86
1.57
51.74
1.66
Above 50 base
0.01
7.32
0.08
0.00
KMS 50-60
0.00
13.08
0.01
0.00
Total
32.87
1.58
51.83
1.67
background image
P
89
Ore Reserves below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Obuasi Category
million
g/t
Tonnes
Moz
Below 50 level
Proved
Probable                                      2.71
13.08
35.49
1.14
Obuasi
Total                                           2.71
13.08
35.49
1.14
Ore Reserve modifying factors
as at 31 December 2010
Cut-off
Stopping
% RRF
% RRF
% MRF
% MRF
Gold
value
Dilution
width   (based on
(based    (based on
(based
Obuasi
price
g/t Au
(%)
cm
tonnes)
on g/t)
tonnes)
on g/t)     MetRF%
Obuasi – Above 50 base
850
5.00
12
9,200
85
Obuasi – KMS 50–60
850
5.00
12
3,700
85
background image
P
90
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Obuasi
Ghana
Obuasi
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Clement Asamoah-Owusu
AusIMM
210145
26 years
Ore Reserve
Francis Owusu-Mensah
AusIMM
305571
25 years
Obuasi
– surface (metric)
Tonnes above 
cut-off (millions)
0
18
Average grade
 above cut-off (g/t)
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0
20
18
16
14
12
10
8
6
4
2
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
4
6
2
8
10
12
14
16
Obuasi
– underground (metric)
Tonnes above 
cut-off (millions)
0
20
Average grade 
above cut-off (g/t)
120
100
80
60
40
20
0
35
30
25
20
15
10
5
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
10
15
5
background image
P
91
Guinea
Country overview
The Siguiri mine is AngloGold Ashanti’s only operation in the Republic of Guinea in West Africa. The mine is 85% owned by AngloGold
Ashanti and 15% by the government of Guinea. The mine is a conventional open-pit operation situated in the Siguiri district in the
north-east of Guinea. It lies about 850km from the capital city of Conakry. Gold-bearing ore is mined from several pits and sent to a
CIP plant.
The Siguiri orebody is hosted in Birimian aged rocks and characterised by wide zones of multiple narrow quartz veins hosting gold
mineralisation. The deposits have been influenced by a deep weathering profile, typically 50-80m below surface, resulting in broad
zones of low-grade mineralisation easily amenable to bulk mining methods. Mining is presently focussed on block 1, which hosts the
processing plant and mining operations, with ongoing exploration of blocks 2-4 expected to increase significantly in line with the
operations’ long-term development plans so as to maximise the exploitation of the Mineral Resource potential.
Mineral Resource estimation
Mineral Resource definition drilling consists of air core (AC), RC and DD drilling. All available geological drill-hole information is
validated for usage in the models and the local geology of the orebody is used to classify the drill-hole information into appropriate
geostatistical domains. Detailed statistical analyses are conducted on each of these domains and this allows for the identification of
high-grade outliers. If these values are anomalous to the general population characteristics then they are cut back to the appropriate
upper limit of the population.
The Mineral Resource is estimated using 3D computer block models constructed in Datamine® software. Geological interpretation is
based on geological borehole data. A prototype block model ranging from 10m x 10m x 2.5m to 50m x 25m x 6m block sizes,
depending on the shape of the orebody and drilling density, is used within the geological model outlines. Ordinary and indicator kriging
is used to estimate gold grades and a limiting pit shell at $1,100/oz is used to quantify the total Mineral Resource.
Ore Reserve estimation
The Mineral Resource models for each pit are depleted to the mining surfaces. Costs are assigned on a pit-by-pit basis reflecting the
current existing cost structure of the operation. The relevant dilution and ore loss factors are applied and the optimisation is done in
Whittle
®
software. The relevant metallurgical recoveries, geotechnical parameters, cut-off grades and economics are applied to
generate the final Ore Reserve.
background image
P
92
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Siguiri
Guinea
Siguiri
Location
Siguiri is situated in the north-east of Guinea and is located about 850km from the capital city of Conakry. The Société Ashanti
Goldfields de Guinée (SAG) mining concession consists of four blocks totalling 1,495km2 . Siguiri is a multi-pit mining operation and
the current LOM plan comprises the mining of three individual pits. The oxide gold ore is mined by a mining contractor in a
conventional open-pit mining operation and processing is done by a CIP plant.
Geology
Mineralisation occurs in Paleoproterozoic Birimian rocks consisting of turbidites and lesser volcaniclastic sequences.
The mineralisation is structurally controlled and occurs as sheeted veins or within shear zones. There are two main types of oxide
mineralisation in the Siguiri basin, namely:
elluvial or alluvial-hosted laterite mineralisation; and
primary quartz-vein related or shear hosted mineralisation.
The laterite mineralisation occurs as aprons of colluvial or as palaeo-channels of alluvial lateritic gravel adjacent or immediately above
the in situ vein-related or shear hosted mineralisation. The in situ mineralisation can occur as either sheeted veins or associated with
shear zones, with the best mineralisation often occurring at the intersection of the two.
The shear zone mineralisation is related to the development of a number of north-south striking shear zones that appear to cut
through different lithologies. This mineralisation is commonly associated with silicification, brecciation and quartz-albite-pyrite veining,
with magnetite present at some localities.
Siguiri
3D model of geological features (veins and bedding planes) and gold-bearing samples
background image
P
93
The vein related mineralisation occurs as north-east/south-west to east-west striking, discontinuous sheeted veins. The better
mineralised areas are associated with vein stockworks that generally occur in the coarser, brittle siltstones and sandstones. The
sheeted veins appear to be related to a younger folding event and may be developed in fold axial planes. Mineralisation is associated
with white quartz veins, with grey selvages and scattered large arsenopyrite crystals proximal to these veins.
The mineralisation at Siguiri has been deeply weathered to depths of up to 100m.The mineralised saprolite provides the primary oxide
feedstock for the CIP plant. The original practice at Siguiri was to blend the laterite and saprolite ore types and to process these using
the heap-leach method. With the percentage of available laterite ore decreasing, a CIP plant was brought on stream during 2005 to
treat predominantly saprolite oxide ore. With continued exploration into deeper fresh rock extensions of the ore deposit, new
treatment options are under consideration.
Exploration
The primary objective of the exploration programme at Siguiri is to discover new deposits and upgrade prospective areas to replace
the annual depletion from mining. Exploration is focussed on finding and upgrading oxide style mineralisation in the saprolite, using
geophysics, soil geochemistry and drill-hole sampling in the context of the regional and pit-scale geological models. There is a
secondary focus to investigate and evaluate the potential mineralisation in the fresh rock so that all opportunities are explored.
The 2010 budget was spent mainly on drilling, with 149,235m drilled during the year made up of 125,944m of brownfield exploration
(AC and RC) in oxides; 5,984m mixed RC and DD in sulphides and a further 17,307m of sterilisation drilling.
Structural model of the Tubani and Bindini pits
background image
P
94
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Siguiri
The areas around the current pits were again the focus of the drilling in 2010 in order to investigate the potential extensions to the
current pits. The principal targets that were explored include Bidini South, Kalamagna South, north-west of Seguélén North East and
South West pits, Kozan North West (ii), Kozan Central West and Sanu-Tinti-Tubani connections. Extension drilling was undertaken at
Sintroko North.
During the year the Sokunu-Sintroko soil anomalies were investigated with geophysics and reconnaissance drilling, with promising
results. The fresh rock potential below a number of pits was also investigated, with particular emphasis on the Sanu-Tinti, Toubani,
Kami North East, Sintroko South, Eureka North and Soloni Pits. Soil/regolith sampling of Block 1 continued throughout the year with
approximately 85% of Block 1 covered by a 200m x 50m grid by year end. The geological model has been significantly revised
on the basis of the deep drilling and field work results, with the structural controls of the mineralisation being the focus of these
investigations. This process is ongoing and further academic studies are planned.
Projects
The Foulata drilling was completed in 2007 and the first Inferred Mineral Resource in Block 2 was declared in 2008. The Mineral
Resource at present is based on the assumption that ore from the deposit will be trucked to the current processing plant.
An additional 17 DD holes were drilled for metallurgical testwork and additional coverage during 2010. Opportunities for upside
potential through on-site mineral concentration are being investigated.
The Siguiri Expansion Project was initiated to investigate the economic viability of increased production volumes from Block 1.
The exploration potential for oxide and sulphide deposits is encouraging. Fast-tracking of drilling to bring the project to account is
required to meet the LOM plan. Current exploration potential is based on positive surface geochemistry results, extensive orpaillage
activity, geophysical data interpretation, geological modelling and experienced target generation extrapolated from existing
mining areas.
This Siguiri expansion project, presently at scoping level, will consider alternative routes to:
increase gold production;
lower mining costs; and
increase plant throughput.
Guinea
Siguiri
North-east section through the Seguélén pit
background image
P
95
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Siguiri
Category
million
g/t
Tonnes
Moz
Bidini
Measured                                       –
Indicated                                    6.42
1.11
7.14
0.23
Inferred                                     12.01
0.98
11.72
0.38
Total                                         18.43
1.02
18.86
0.61
Eureka East
Measured
Indicated                                      0.46
0.78
0.36
0.01
Inferred                                        0.06
0.68
0.04
0.00
Total                                            0.52
0.77
0.40
0.01
Eureka North
Measured
Indicated                                      0.70
0.89
0.62
0.02
Inferred                                        0.21
0.79
0.17
0.01
Total                                            0.91
0.87
0.78
0.03
Foulata
Measured                                         –
Indicated                                           –
Inferred                                       2.83
1.63
4.61
0.15
Total
2.83                          1.63                        4.61                        0.15
Kalamagna
Measured                                        –
Indicated                                    5.70
0.72
4.09
0.13
Inferred                                      6.45
0.87
5.64
0.18
Total                                          12.15
0.80
9.73
0.31
Kami
Measured                                     6.59
0.92
6.08
0.20
Indicated
4.40
0.78
3.42
0.11
Inferred                                       7.74
0.81
6.30
0.20
Total                                          18.73
0.84
15.80
0.51
Kosise
Measured                                         –
Indicated                                      9.40
0.72
6.74
0.22
Inferred                                       8.72
0.85
7.40
0.24
Total                                          18.13
0.78
14.14
0.45
Kozan North
Measured
Indicated                                      5.56
0.64
3.59
0.12
Inferred                                       3.10
0.76
2.35
0.08
Total                                            8.66
0.69
5.94
0.19
Kozan South
Measured
Indicated                                      2.68
0.67
1.80
0.06
Inferred                                       1.14
0.79
0.90
0.03
Total                                            3.82
0.71
2.70
0.09
background image
P
96
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Siguiri
Guinea
Siguiri
Mineral Resource continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Siguiri
Category
million
g/t
Tonnes
Moz
Seguélén
Measured                                    7.51
0.78
5.83
0.19
Indicated                                   11.08
1.02                       11.31                        0.36
Inferred                                    11.13
0.97
10.82
0.35
Total                                         29.72
0.94
27.97
0.90
Sintroko South
Measured
Indicated                                    7.08
1.22
8.68
0.28
Inferred                                     0.22
1.77
0.39
0.01
Total                                          7.30
1.24
9.06
0.29
Sokunu
Measured                                      
Indicated                                    2.48
0.82
2.02
0.07
Inferred                                     0.55
0.83
0.46
0.01
Total                                         3.04
0.82
2.48
0.08
Soloni
Measured                                     
Indicated                                   7.18
0.75
5.36
0.17
Inferred                                      7.28
0.73
5.32
0.17
Total                                         14.46
0.74
10.68
0.34
Sorofe
Measured
0.06
0.69                         0.04
Indicated                                    6.68
0.86
5.77
0.19
Inferred                                       2.91
0.82
2.39
0.08
Total
9.65                         0.85                         8.20                         0.26
Stockpile (marginal ore)
Measured
20.49
0.44
9.02
0.29
Indicated                                       
Inferred                                        
Total                                         20.49
0.44
9.02
0.29
Stockpile (full grade ore)
Measured
8.54
0.86
7.31
0.23
Indicated
–                             –                            
Inferred                                           
Total                                           8.54
0.86
7.31
0.23
Stockpile (spent heap leach)
Measured
Indicated                                   31.95
0.54
17.29
0.56
Inferred                                     13.40
0.57
7.61
0.24
Total                                          45.35
0.55
24.90
0.80
Siguiri
Total                                         222.73
0.77
172.58
5.55
background image
P
97
Ore envelopes and drilling at Siguiri
background image
P
98
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Siguiri
Guinea
Siguiri
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole Other
Comments
Siguiri
Measured
5 x 10
Indicated
20 x 40,
Mainly RC, but AC is used in the early
25 x 25, and
stages and some DD holes are drilled
50 x 25
for geology
Inferred
20 x 40,
Mainly RC, but AC is used in the early
25 x 50, and
stages and some DD holes are drilled
50 x 50
for geology
Grade control
5 x 10,
5 x 12, and
10 x 10
Exclusive Mineral Resource
The Exclusive Mineral Resource at Siguiri comprises:
material that is economic at the Mineral Resource gold price of US$1,100 per ounce, but not at the Ore Reserve price of US$850
per ounce (73% of the Exclusive Mineral Resource);
new deposits that are currently at the Inferred Mineral Resource level of confidence (16% of the Exclusive Mineral Resource).
These areas were being infill drilled during 2010; and
the Inferred Mineral Resource in the current pit designs (11% of the Exclusive Resource).
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Siguiri
Category
million
g/t
Tonnes
Moz
Measured                                    4.46
0.80
3.59
0.12
Indicated                                   34.07
0.77
26.22
0.84
Inferred                                     77.77
0.85
66.11
2.13
Siguiri
Total                                        116.30
0.82
95.91
3.08
background image
P
99
Siguiri:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
6.6
6.4
6.2
6.0
5.8
5.6
5.4
5.2
Change
6.59
2009
-0.37
Depletion
0.30
Gold
price
0.04
Explo-
ration
-0.60
Metho-
dology
5.55
2010
-0.64
Cost
0.24
Other
Siguiri:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
3.1
3.0
2.9
2.8
2.7
2.6
2.5
2.4
2.3
Change
3.07
2009
-0.29
Depletion
-0.34
Model
change
0.00
New
ounces
from
projects
-0.06
Scope
change
2.38
2010
0.01
Change in
Economics
-0.02
Other
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Siguiri
Category
million
g/t
Tonnes
Moz
Bidini
Proved                                            –
Probable                                      0.85
1.89
1.62
0.05
Total                                           0.85
1.89
1.62
0.05
Eureka East
Proved
Probable
0.44                          0.67                        0.29                         0.01
Total                                           0.44
0.67
0.29
0.01
Kalamagna
Proved                                            –
Probable                                      5.32
0.70
3.73
0.12
Total                                           5.32
0.70
3.73
0.12
Kami
Proved                                       2.07
1.21
2.50
0.08
Probable                                          –
Total                                           2.07
1.21
2.50
0.08
Kosise
Proved                                            –
Probable                                      4.11
0.72
2.95
0.09
Total
4.11                          0.72                        2.95                        0.09
Kozan North
Proved
Probable                                     0.86
0.66
0.57
0.02
Total
0.86                          0.66                        0.57                        0.02
Kozan South
Proved
Probable                                      0.67
0.77
0.51
0.02
Total                                           0.67
0.77
0.51
0.02
background image
P
100
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Siguiri
Guinea
Siguiri
Ore Reserve continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Siguiri
Category
million
g/t
Tonnes
Moz
Seguélén
Proved                                       7.95
0.70
5.56
0.18
Probable                                     9.10
1.02
9.29
0.30
Total                                          17.05
0.87
14.84
0.48
Sintroko South
Proved
Probable                                      4.85
1.09
5.30
0.17
Total                                            4.85
1.09
5.30
0.17
Sokunu
Proved                                            
Probable                                      1.66
0.87
1.44
0.05
Total                                            1.66
0.87
1.44
0.05
Soloni
Proved                                            
Probable                                       2.98
0.93
2.77
0.09
Total                                            2.98
0.93
2.77
0.09
Sorofe
Proved                                            
Probable                                      4.64
0.85
3.94
0.13
Total                                           4.64
0.85
3.94
0.13
Stockpile (marginal ore)
Proved
20.49
0.44
9.02
0.29
Probable                                       
Total                                         20.49
0.44
9.02
0.29
Stockpile (full grade ore)
Proved
8.54
0.86
7.31
0.23
Probable                                         
Total                                           8.54
0.86
7.31
0.23
Stockpile (spent heap leach)
Proved
Probable
31.95                          0.54
17.29                         0.56
Total                                          31.95
0.54
17.29
0.56
Siguiri
Total                                        106.49
0.70
74.08
2.38
Inferred Mineral Resource in business plan
Some Inferred Mineral Resource was included in the optimisation process and the total Inferred Mineral Resource within the in situ
ore reserve is 0.20Moz or 11% of the declared in situ Ore Reserve. The Inferred Mineral Resource was generally not used in the
optimisation process except at the Tubani and Sintroko pits, since these pits are coming to an end. The inclusion of the Inferred
Mineral Resource in these two pits was deemed to be insignificant in influencing the pit size as it made up less than 10% of the
declared Ore Reserve in these two pits.
The Seguélén pits contain 0.10Moz of Inferred material within the pit design. This Inferred material is mostly located within the Kintinia
Area 1 where access to this area has historically been difficult.
background image
P
101
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Siguiri
million
g/t
Tonnes
Moz
Comments
Bidini
0.66
0.90
0.60
0.02
Sanutinti pits containing 6% transition ore
Eureka East
0.09
0.55
0.05
0.00
Within the Ore Reserve pit design
Kalamagna
1.11
0.64
0.71
0.02
Within the Ore Reserve pit design
Kami
0.01
1.00
0.01
0.00
100% hard oxides
Kosise
0.16
0.55
0.09
0.00
Within the Ore Reserve pit design
Kozan North
0.05
0.85
0.04
0.00
Within the Ore Reserve pit design
Kozan South
0.08
0.93
0.08
0.00
Within the Ore Reserve pit design
Seguélén
3.47
0.92
3.18
0.10
Sanutinti pits containing 0.36% transition ore
Sintroko South
0.05
0.80
0.04
0.00
Within the Ore Reserve pit design
Sokunu
0.26
0.70
0.18
0.01
Within the Ore Reserve pit design
Soloni
0.85
0.90
0.76
0.02
Within the Ore Reserve pit design
Sorofe
0.56
0.71
0.39
0.01
Tubani pits containing 0.03% transition ore
Total
7.34
0.84
6.14
0.20
background image
P
102
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Siguiri
Guinea
Siguiri
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Peter Winkler
AusIMM
220329
26 years
Ore Reserve
Tebogo Mushi
SAIMM
702438
9 years
Siguiri
– surface (metric)
Tonnes above 
cut-off (millions)
0
4
Average grade
 above cut-off (g/t)
300
250
200
150
100
50
0
7
6
5
4
3
2
1
0
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
2
3
1
5
Ore Reserve modifying factors
as at 31 December 2010
Cut-off
% RRF
% MRF
% MRF
Gold
value
(based
(based on
(based
Siguiri
price
g/t Au
on g/t)
tonnes)
on g/t)
MCF%
MetRF%
Seguélén
850
0.35
100
100
100
100             0.94
Sintroko South
850
0.41
100
100
100
100
0.94
Sokunu
850
0.37
100
100
100
100             0.94
All remaining pits
850
0.31
100
100
100
100
0.94
Stockpile (full grade ore)
850
0.55
100
100
100
100
0.94
Stockpile (marginal ore)
850
0.35
100
100
100
100
0.94
Stockpile (spent heap leach)
850
0.35
100
100
100
100
0.94
background image
P
103
Mali
Country overview
AngloGold Ashanti has interests in three operations in the west African country of Mali – Sadiola (41%), Yatela (40%) and Morila (40%).
The Sadiola and Yatela operations are managed by AngloGold Ashanti, while Randgold Resources Limited manages Morila.
Mineral Resource estimation
The Mineral Resource is taken as the material that falls within the $1,100/oz economic shell optimised for each individual deposit.
A 3D surface is generated to create the outline of the geological model. This model is then used as a prototype model to estimate
grades. Block sizes are between 25m x 25m x 10m and 30m x 30m x 10m (X Y Z) and where appropriate, selective sub-celling is
used for definition on the geological and mineralisation boundaries. All the deposits have kriged block models and where appropriate,
a geostatistical technique called uniform conditioning is used to estimate the proportion of economic ore that occurs above the cut-
off and this is reported according to the dimensions of the practical mining unit.
Ore Reserve estimation
The Mineral Resource models are used as the basis for the Ore Reserve. Pit optimisation is done using Whittle® software. The typical
Whittle® approach for a mill-constrained operation is followed. Optimisations are run on the Measured and Indicated Mineral Resource
and the Measured, Indicated and Inferred Mineral Resource. All appropriate costs, metallurgical recovery factors and geotechnical
parameters are applied to generate the final Ore Reserve.
background image
P
104
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Morila
Mali
Morila
Location
The Morila mine is situated some 280km south-east of Bamako, the capital city of Mali. The mine is operated by Morila SA, a joint
venture company incorporating Randgold Resources (40%), AngloGold Ashanti (40%) and the Government of Mali (20%). Randgold
Resources took over the operation of Morila mine from AngloGold Ashanti in February 2008.
Mining
The Morila open-pit activities were successfully completed in April 2009. Consequently the main mining activity for the rest of the mine
life will be re-handling already mined stockpiles at a rate of 4.2Mtpa using a core and backup fleet comprising two hydraulic
excavators, two CAT 990 front-end loaders and seven Caterpillar 777 dump trucks.
Geology
The Morila orebody is located predominantly in metasediments within a broad NNW-trending corridor of shearing.
This shear zone has both near vertical and flat lying components. It is interpreted as being a second order shear off the main Banafin
shear, approximately 25km to the east. The Doubalakoro granite pluton bounds the sediments to the west and the Massigui granite
to the east. The deposit occurs within a sequence of amphibolites facies metamorphosed Birimian metasediments. Gold mineralisation
is associated with silica feldspar alteration and the sulphide minerals arsenopyrite, pyrrhotite, and pyrite (with minor chalcopyrite).
Processing
Ore is processed at a rate of 4.2Mtpa via a conventional CIL plant after passing through primary and secondary crushing processes
followed by further comminution via a semi-autogenous grinding (SAG) mill and ball mill. After milling and classification, the slurried
ore passes through the cyanide leach circuit for gold extraction after which the leached ore is pumped and deposited into the TSF.
Supernatant water from the TSF is reclaimed and collected in the return water dam before being returned to the mill for re-use.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Morila
Category
million
g/t
Tonnes
Moz
Stockpile (marginal ore)
Measured
2.68
1.14
3.04
0.10
Indicated
Inferred                                       0.78
0.79
0.61
0.02
Total                                           3.46
1.06
3.65
0.12
Stockpile (full grade ore)
Measured
2.35
1.68
3.93
0.13
Indicated                                        
Inferred                                          
Total                                           2.35
1.68
3.93
0.13
Morila
Total                                            5.80
1.31
7.58
0.24
Exclusive Mineral Resource
The Exclusive Mineral Resource is comprised of stockpiles below the current processing cut-off and stockpiles with diluted
boundary limits.
background image
P
105
Morila:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
0.33
0.32
0.31
0.30
0.29
0.28
0.27
0.26
0.25
0.24
0.23
Change
0.33
2009
-0.10
Depletion
0.01
Gold
price
0.00
Explo-
ration
0.00
Metho-
dology
0.24
2010
0.00
Cost
0.00
Other
Morila:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
0.32
0.31
0.30
0.29
0.28
0.27
0.26
0.25
0.24
0.23
0.22
Change
0.32
2009
-0.10
Depletion
0.00
Model
change
0.00
New
ounces
from
projects
0.00
Scope
change
0.22
2010
0.00
Change in
Economics
0.00
Other
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Morila
Category
million
g/t
Tonnes
Moz
Stockpile (marginal ore)
Proved
Probable                                     2.68
1.14
3.04
0.10
Total
2.68                         1.14                         3.04                        0.10
Stockpile (full grade ore)
Proved
2.35
1.68
3.93
0.13
Probable                                         –
Total                                           2.35
1.68
3.93
0.13
Morila
Total                                           5.02
1.39
6.97
0.22
Ore Reserve modifying factors
as at 31 December 2010
Gold
Cut-off value
Morila
price
g/t Au
Morila – Stockpiles
850
0.90
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Tom Gell
AusIMM
211795
18 years
Ore Reserve
Alex Bals
PLATO
PMS0174
16 years
background image
P
106
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Sadiola
Mali
Sadiola
Location
Sadiola is situated in the north-west of Mali, 77km to the south of the regional capital of Kayes. The mining operations take place in
six open pits, namely the Sadiola main pit and five satellite pits.
Ore is treated in a 4.8Mtpa CIP processing plant. The plant was originally designed to treat soft oxide ore, but has been progressively
adapted to receive soft sulphide ores and even some types of hard oxide ores.
The down dip extension of the mineralisation mined in the Sadiola main pit has been named the Deep Sulphides Project (DSP),
in which the gold ore occurs in the underlying fresh rock. A full feasibility study of the DSP is scheduled for completion in 2011.
If approved, the project will extend the life of Sadiola’s operations and leverage exploration efforts and further discoveries of hard-rock
gold deposits in the district.
Geology
The Sadiola deposits are located within the Malian portion of the Keniéba-Kedougou Inlier, a major early Proterozoic-Birimian window
along the north-east margin of the Kenema-Man shield. The deposits are in the north of the inlier and positioned in the Kofi Formation,
just east of the Senegalo-Malian Shear Zone (SMS) terrane boundary. Regional metamorphism is greenschist facies with amphibolites
facies metamorphism observed in the contact aureoles around major intrusions.
Sadiola main pit is a brittle-ductile shear zone-hosted deposit related to the interaction of the north-striking Sadiola Fracture Zone
(SFZ) and a north-north-east striking fault array. The SFZ follows the contact between the hangingwall greywacke and footwall marble
and is mineralised over a drilled strike length of approximately 2,500m. The stratigraphy is intruded by discontinuous diorite and
quartz-feldspar porphyry. Mineralisation occurs in all four rock types although most of the mineralisation is hosted in the footwall
adjacent to the SFZ. The deposit has been intensely weathered to a maximum depth of 200m.
The Sadiola main pit deposit originally consisted of two zones, an upper oxidised cap and an underlying sulphide zone. From 1996
until 2002, shallow saprolite oxide ore was the primary ore source. Since 2002, the deeper saprolitic sulphide ore has been mined,
progressively replacing the depleted oxide Ore Reserve. The Ore Reserve of the main pit is fully depleted with the remaining material
below the current pit being part of the DSP.
The primary source of the oxide ore currently comes from five satellite pits located approximately 6km south-east of the Sadiola mine
and processing plant. Some gold-rich, hard-oxide nodes have been also treated in the Sadiola plant, after first stage crushing.
Mineralisation for FE3 pits 1, 2 and 3 is hosted in marble adjacent to the upper contact with carbon-rich pelites. Gold is associated
with north-east-striking faults and lens-shaped breccia zones that are broadly parallel to the north-west-trending stratigraphy. The FE4
deposit is located in a bedded sandstone and pelite sequence with mineralisation predominantly hosted in breccia along a
NE-striking regional shear and several subsidiary NNE-trending faults.
Exploration
Exploration around Sadiola aims to grow SEMOS’s current production profile by developing and upgrading Mineral Resources and
thereby Ore Reserves, and discovering new projects. To this end, 62,452m RC and 7,183m DC drilling were completed on the
Sadiola concession in 2010.
background image
P
107
Advanced project work has focussed on detailed structural and geological mapping to understand the controls on gold mineralisation
and to maximise project potential. This has led to Mineral Resource drilling at Tambali which converted the Inferred Mineral Resource
within the pit design to Indicated Mineral Resource and allowing the project to be added to the LOM plan. Additional scope exists to
increase the Ore Reserve in the high-grade zone in the fresh rock.
Mineral Resource drilling at Sadiola has targeted both the oxide and deep sulphides to upgrade the Inferred Mineral Resource to
Indicated Mineral Resource inside the pit shell and to add more Mineral Resources along the NNE structures. Mapping and drilling
around the FE3 and FE4 pit areas has indicated potential for further oxide mineralisation which will be followed up in 2011.
Regional exploration work has focussed predominantly on oxide mineralisation within the Sadiola concession. Detailed gravity, termite
sampling and drilling is ongoing. An exploration strategy for 2011 was developed to assess the oxide endowment of the concession
through termite sampling, field mapping, trenching, IP geophysics surveys and drilling.
First stage exploration is also targeting areas of the Souroukoto Sandstone Plateau where the major mineralising structures and
basement rocks continue under shallow cover. Additionally, a more regional focus to target potential joint ventures is being
implemented.
Projects
A full feasibility study for the DSP was planned to be finalised in November 2010. This was completed, except for the EIA study which
was pushed back by approximately six months. To date all geological work indicates favourable results. Additional drilling has been
completed along north-east structures to target some 880,000 additional ounces and to convert the Inferred Mineral Resource to
Indicated Mineral Resource.
Work is continuing to examine the underground potential of Sadiola. Preliminary drilling targets have been identified and drilling is
expected to commence in 2012.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Sadiola
Category
million
g/t
Tonnes
Moz
FE2
Measured                                       –
Indicated                                        –
Inferred                                     0.84
1.63
1.37
0.04
Total                                          0.84
1.63
1.37
0.04
FE3
Measured                                        –
Indicated
4.02                         2.12                         8.53
0.27
Inferred                                       0.56
3.04
1.71
0.05
Total                                           4.58
2.24
10.24
0.33
FE4
Measured                                        –
Indicated                                    3.42
2.01
6.87
0.22
Inferred                                     0.26
2.20
0.56
0.02
Total                                         3.67
2.02
7.43
0.24
background image
P
108
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Sadiola
Mali
Sadiola
Mineral Resource continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Sadiola
Category
million
g/t
Tonnes
Moz
FN2
Measured                                       –
Indicated                                   0.25
1.49
0.37
0.01
Inferred                                     0.36
3.35
1.21
0.04
Total
0.61
2.59                         1.57
0.05
FN3
Measured                                        – 
Indicated
0.04                          1.64
0.06                        0.00
Inferred                                      1.27
1.24
1.57
0.05
Total                                           1.31
1.25
1.63
0.05
Total stockpiles
Measured
9.60
1.39
13.39
0.43
Indicated                                         –
Inferred
–                              –
Total                                           9.60
1.39
13.39
0.43
Sekokoto
Measured                                         –
Indicated                                          –
Inferred                                       0.68
1.47
1.00
0.03
Total                                           0.68
1.47
1.00
0.03
Tambali South
Measured
Indicated                                     3.86
1.38
5.34
0.17
Inferred                                      0.55
2.37
1.30
0.04
Total                                          4.41
1.50
6.63
0.21
DSP (oxides)
Measured
2.00
Indicated                                     0.38
1.66
0.64
0.02
Inferred                                      0.05
1.61
0.07
0.00
Total                                            0.43
1.66
0.71
0.02
DSP (transitional)
Measured
Indicated                                     0.17
1.70
0.29
0.01
Inferred                                       0.45
1.79
0.80
0.03
Total                                           0.62
1.77
1.09
0.04
DSP (sulphides)
Measured
0.00
5.17
0.02
0.00
Indicated                                    41.20
1.77
72.76
2.34
Inferred                                     13.27
1.60
21.26
0.68
Total                                         54.47
1.73
94.03
3.02
Sadiola
Total                                          81.21
1.71
139.11
4.47
background image
P
109
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Sadiola
Measured
25 x 25
Indicated
25 x 25,
30 x 30,
35 x 35, and
25 x 50
Inferred
25 x 50, and
50 x 50
Grade control      5 x 10
background image
P
110
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Sadiola
Exclusive Mineral Resource
The Exclusive Mineral Resource is defined as the part of the Mineral Resource that was not converted to Ore Reserve. For the Sadiola
pits that is defined as follows:
the Mineral Resource that is outside the current Ore Reserve designs but inside the Mineral Resource shells;
the Inferred Mineral Resource; and
material below the Ore Reserve cut-off grade and above the Mineral Resource cut-off grade.
The Exclusive Mineral Resource gives an indication of the deposit's future potential. This material could be converted to Ore Reserve
with an increase in the gold price and favourable costs. The Inferred Mineral Resource portion of the Mineral Resource within the Ore
Reserve pit design will be converted to the Ore Reserve through grade control drilling. The low-grade "mineralised waste" stockpiles
that are currently below the marginal ore cut-off grade are also declared as Exclusive Mineral Resource as these stockpiles are
currently not in the mining plan.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Sadiola
Category
million
g/t
Tonnes
Moz
Measured                                   4.67
0.75
3.49
0.11
Indicated                                  18.24
1.69
30.77
0.99
Inferred                                    18.27
1.69
30.85
0.99
Sadiola
Total                                        41.18
1.58
65.11
2.09
Mali
Sadiola
background image
P
111
Sadiola:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
4.8
4.6
4.4
4.2
4.0
3.8
3.6
Change
3.76
2009
-0.13
Depletion
0.48
Gold
price
0.56
Explo-
ration
-0.20
Metho-
dology
4.47
2010
-0.00
Cost
0.00
Other
Sadiola:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
2.4
2.2
2.0
1.8
1.6
1.4
1.2
Change
1.46
2009
-0.21
Depletion
0.00
Model
change
0.91
New
ounces
from
projects
0.03
Scope
change
2.30
2010
-0.01
Change in
Economics
0.12
Other
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Sadiola
Category
million
g/t
Tonnes
Moz
FE3
Proved                                          –
Probable                                    2.71
1.88
5.11
0.16
Total                                           2.71
1.88
5.11
0.16
FE4
Proved                                            –
Probable                                      2.77
1.67
4.62
0.15
Total                                           2.77
1.67
4.62
0.15
Total stockpiles
Proved
2.33
2.95
6.88
0.22
Probable                                          –
Total                                            2.33
2.95
6.88
0.22
Tambali South
Proved
Probable
1.96                         1.42                         2.78                         0.09
Total                                           1.96
1.42
2.78
0.09
DSP (sulphides)
Proved
Probable
27.83                          1.87
52.08                          1.67
Total                                         27.83
1.87
52.08
1.67
Sadiola
Total                                         37.60
1.90
71.47
2.30
background image
P
112
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Sadiola
Mali
Sadiola
Inferred Mineral Resource in business plan
The plant feed of the final LOM pit designs includes 18% Inferred Mineral Resource which has been included in the final schedule,
amounting to 0.89Moz of produced gold.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Sadiola
million
g/t
Tonnes
Moz
Comments
FE3
0.40
2.48
1.00
0.03
FE3, all pits
FE4
0.12
2.13
0.25
0.01
FE, including north-west small pit
Tambali South
0.01
1.31
0.01
0.00
Tambali north and south
DSP (sulphides)
14.39
1.83
26.32
0.85
All categories of DSP
Total
14.92
1.85
27.59
0.89
background image
P
113
Ore Reserve modifying factors
as at 31 December 2010
Cut-off
% RRF
% RRF
% MRF
% MRF
Gold
value
Dilution   (based on
(based   (based on
(based
Sadiola
price
g/t Au
(%)
tonnes)
on g/t)
tonnes)
on g/t)
MCF%     MetRF%
DSP
900
0.70
0
100
100
100
100
100
76-96*
FE2
850
0.90
0
100
100
100
100
100
76-96*
FE3
900
0.65
0
100
100
100
100
100
76-96*
FE4
900
0.65
0
100
100
100
100
100
76-96*
FN2
850
0.70
0
100
100
100
100
100
76-96*
FN3
850
0.70
0
100
100
100
100
100
76-96*
Main pit (sulphides)
900
0.80
0
100
100
100
100
100
76-96*
Sekokoto
850
0.90
0
100
100
100
100
100
76-96*
Tambali South
900
0.90
0
100
100
100
100
100
76-96*
Total stockpiles
900
100
100
100
100
100
76-96*
*
MetRF% varies for each material type
Sadiola
– surface (metric)
Tonnes above 
cut-off (millions)
0.5
1.9
Average grade 
above cut-off (g/t)
0.7
220
200
180
160
140
120
100
80
60
40
3.0
2.5
2.0
1.5
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
1.1
1.5
1.3
0.9
1.7
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Mark Kenwright
AusIMM
302344
14 years
Ore Reserve
Karol Bartsch
AusIMM
107390
21 years
background image
P
114
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Yatela
Mali
Yatela
Location
Yatela mine is situated some 25km north of Sadiola and approximately 50km southwest of Kayes. The Yatela operation is currently
mining from two open pits, the Yatela main pit and the satellite Alamoutala pit.
Ore is processed through a 3.0Mtpa heap leach plant that was commissioned in 2000. The pregnant liquor pond for gold recovery
uses the carbon in solution process. Loaded carbon is sent to Sadiola for elution, regeneration, electro-winning and smelting.
Geology
The Yatela and Alamoutala deposits are located in north-west Mali within the Keniéba-Kedougou Inlier, a major Early Proterozoic-
Birimian inlier along the north-east margin of the Kenema-Man shield.
The Yatela deposit is located in the north of the window and is hosted by sediments of the Kofi Formation, which have been intruded
by numerous felsic intrusives. The sediments consist of fine-grained greywacke, pelites that are locally carbon-rich, and impure
limestones with minor tuffs and acid volcanics. The primary gold mineralisation is hosted along a sheared contact between
predominantly dolomitic carbonate rocks of the Kofi Formation to the west and a large, weakly mineralised dioritic intrusion to the
east. This primary mineralisation was concentrated to economic grades through dissolution of the carbonate by supergene
processes.
background image
P
115
Karst development at Yatela has formed deep pot-holes, collectively named the Yatela Basin, which were gradually filled by
sandstones and conglomerates during peneplanation of the Proterozoic rocks. Chaotic collapse during karstification, coupled with
the infill sediments resulted in the orebody being hosted in a melange-type of rocks made up of sedimentary rocks and dissolution
residues. Gold is disseminated in the unconsolidated ferruginous, sandy-clayed layer that lines the bottom and walls of a deep trough
with steep margins. The ore zone dips steeply on the west wall and more gently to the west on the east wall, following a keel-like
geometry with tight closure towards the south. The supergene enrichment of low-grade primary gold mineralisation associated with
the karstification is the most important geological feature to the economics of the Yatela deposit.
The Alamoutala geology comprises north-trending clastic metasediments and calcitic marbles which are intruded by a coarse-grained
granodiorite. In the Alamoutala pits, the gold mineralisation is hosted in saprolitised marbles and karstic rocks in the south, and in
weathered clastic meta-sedimentary rocks to the north. The mineralisation occurs proximal to the intermittently sheared and fractured
contact, named the Alamoutala Fracture Zone, between the clastic and carbonate units. These rocks have locally been strongly biotite
and feldspar-altered. High-grade gold mineralisation is also hosted in magnetite-bearing, skarn-like calc-silicate rocks along the
contact with the granodiorite intrusive.
Exploration
The exploration strategy around the Yatela Concession is focussed on defining high-grade oxide Mineral Resources to extend the
LOM. Execution over the year has involved 64,812m RC drilling and 3,202m DC drilling, predominantly for development of the Yatela
and Alamoutala orebodies.
Detailed mapping of the Yatela main pit has provided a better understanding of the mineralisation with follow up Mineral Resource
drilling extending the LOM until October 2013.
Significant recent drill intersections around Alamoutala have highlighted an area of continuous mineralisation between the western
and northern satellite pits that has been added to the current mine plan.
Ground gravity surveys have been completed over most of the Yatela concession to identify the gravity lows typical for Yatela-type
deposits. The exploration model implies that preferential weathering of sulphides and karstic dissolution and collapse led to the
development of a relative gravity low over Yatela. Several similar gravity lows have been identified and are being assessed by termite
mound sampling and drill testing.
Drilling of IP targets adjacent to the Yatela main pit is in progress. Follow up of the mineralised Yatela structures that extend to the
north under the Souroukoto Sandstone is also planned.
Projects
The exploration programme will continue in 2011 to target the high-grade oxide potential within the mining lease area. The company
is also looking at possible partnerships with nearby lease holders which may result in an additional Ore Reserve that could extend
the life of the Yatela processing plant.
background image
P
116
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Yatela
Mali
Yatela
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Yatela
Category
million
g/t
Tonnes
Moz
Main pit
Measured
0.08
2.46
0.19
0.01
Indicated                                     0.77
2.80                        2.16                         0.07
Inferred                                       0.34
2.04
0.69
0.02
Total                                           1.18
2.56
3.03
0.10
Yatela North
Measured
Indicated                                         –
Inferred                                      0.42
1.79
0.76
0.02
Total                                           0.42
1.79
0.76
0.02
Alamoutala pit
Measured
0.17
1.44
0.25
0.01
Indicated                                    0.67
1.36
0.92
0.03
Inferred                                      0.06
1.24
0.07
0.00
Total                                          0.90
1.37
1.23
0.04
KW18
Measured                                       –
Indicated                                   0.08
1.75
0.14
0.00
Inferred                                     0.01
1.94
0.01
0.00
Total
0.09                         1.76
0.15                        0.00
Total stockpiles
Measured
0.65
0.56
0.36
0.01
Indicated                                         –
Inferred                                           –
Total                                           0.65
0.56
0.36
0.01
Yatela
Total                                           3.23
1.71
5.53
0.18
background image
P
117
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Yatela
Measured
5 x 10, and
25 x 25
Indicated
25 x 25, and
35 x 45
Inferred
50 x 50
Grade control       5 x 10
Exclusive Mineral Resource
The Exclusive Mineral Resource is defined as the part of the Mineral Resource that was not converted to Ore Reserve. As the Yatela
pits are approaching the end of their life, the Ore Reserve shells are optimised to ensure that all recoverable material is mined before
closure. This means that the pits were optimised at a higher gold price than the long-term equilibrium price used on the other deposits
in the group. As a result the Mineral Resource and Ore Reserve are declared in the same shell. Therefore the Exclusive Mineral
Resource consists of Inferred material within these pit designs and the material below the Ore Reserve cut-off grade and above the
Mineral Resource cut-off grade.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Yatela
Category
million
g/t
Tonnes
Moz
Measured                                    0.01
0.58
0.01
0.00
Indicated                                    0.03
0.58
0.02
0.00
Inferred                                      0.82
1.86
1.52
0.05
Yatela
Total                                           0.87
1.79
1.55
0.05
Yatela:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
0.18
0.16
0.14
0.12
0.10
0.08
0.06
Change
0.14
2009
-0.07
Depletion
0.04
Gold
price
0.06
Explo-
ration
0.00
Metho-
dology
0.18
2010
0.00
Cost
0.00
Other
Yatela:
Ore Reserve reconciliation
2009 vs 2010
Ounces 
(millions)
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Change
0.04
2009
-0.07
Depletion
0.00
Model
change
0.00
New
ounces
from
projects
0.00
Scope
change
0.08
2010
0.00
Change in
Economics
0.11
Other
background image
P
118
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Yatela
Mali
Yatela
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Yatela
Category
million
g/t
Tonnes
Moz
Main pit
Proved
0.05
1.46
0.07
0.00
Probable                                     0.66
2.16
1.42
0.05
Total                                           0.70
2.11
1.48
0.05
Alamoutala pit
Proved
Probable
0.58                          1.35
0.78                          0.03
Total
0.58
1.35                        0.78                         0.03
Total stockpiles
Proved
0.23
0.66
0.15
0.00
Probable                                         
Total                                           0.23
0.66
0.15
0.00
Yatela
Total                                           1.52
1.60
2.42
0.08
Inferred Mineral Resource in business plan
The plant feed of the final LOM pit designs includes 43.8% Inferred Mineral Resource, amounting to 0.11Moz of produced gold.
Stockpiles previously declared as marginal ore have been removed from the Mineral Resource and Ore Reserve due to inaccurate
survey figures. This has lead to a total estimated write-off of 0.04Moz. An airborne LIDAR survey is planned to provide accurate
stockpile figures.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Yatela
million
g/t
Tonnes
Moz
Comments
Alamoutala pit
0.10
1.36
0.14
0.00
This includes Inferred material from
satellite pits
Main pit
2.24
1.90
4.27
0.14
Inferred from Yatela main pit, drilling to be
done before mining
Total
2.34
1.88
4.40
0.14
background image
P
119
Ore Reserve modifying factors
as at 31 December 2010
Cut-off
% RRF
Gold
value
Dilution
(based on
Yatela
price
g/t Au
(%)
tonnes)
MCF%
MetRF%
Alamoutala pit
1,075
0.74
0
100
100
75-85
Main pit
1,000
0.62
0
100
100
75-85
Total stockpiles
0.55
0
100
100
75-85
Yatela
– surface (metric)
Tonnes above 
cut-off (millions)
0.4
1.8
Average grade 
above cut-off (g/t)
0.6
3.5
3.0
2.5
2.0
1.5
1.0
0.5
4.5
4.0
3.5
3.0
2.5
2.0
1.5
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
1.0
1.4
1.2
0.8
1.6
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Mark Kenwright
AusIMM
302344
14 years
Ore Reserve
Karol Bartsch
AusIMM
107390
21 years
background image
P
120
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Namibia
Namibia
Country overview
Navachab gold mine, AngloGold Ashanti’s sole operation in Namibia, is wholly owned by the Company.
Mineral Resource estimation
Mineral Resource estimation is performed using Datamine® software. Block dimensions of 25m x 25m x 5m are used as the prototype
model. Grade interpolation is done into these blocks using ordinary and ìndicator kriging methods. A geostatistical technique called
uniform conditioning is then used to estimate the proportion of economic ore that occur above the Mineral Resource cut-off and this
is reported according to the selective mining unit (SMU).
Ore Reserve estimation
MineSight
®
optimisation software is used to generate optimised pit shells using economic parameters. The final pits are then designed
based on the optimised pit shell, recommended slope geometry and ramp access requirements.
background image
P
121
Namibia
Navachab
Location
Navachab is located 10km SW of Karibib and 170km WNW of Windhoek, the capital of Namibia. Navachab is mined as an open-pit
mine with a CIP plant that has a production capacity of 120,000tpm. The plant includes mills, CIP and electro-winning facilities.
A dense media separation (DMS) plant with a 200t/h capacity was commissioned during 2010 and a portion of the CIP feed comes
from this pre-concentration plant.
Geology
The Navachab gold deposit is located in the Pan-African Damara Orogen and is hosted by greenschist-amphibolite facies
calc-silicates, marbles and volcanoclastic rocks. The rocks have been intruded by granite, pegmatite and aplitic dykes and have also
been deformed into a series of alternating dome and basin-like structures.
The main mineralisation forms a sheet-like body which plunges at an angle of approximately 20° to the NW. The mineralisation is
predominantly hosted in a sheeted quartz vein set (±60%) and a replacement skarn (±40%). The mineralisation in the main pit is
hosted by a NE to SW striking metamorphosed sequence of calc-silicates, marbles and volcanoclastic rocks that dip at 70° to the
west. The gold is very fine-grained and associated with pyrrhotite and minor amounts of pyrite, chalcopyrite, arsenopyrite, sphalerite,
maldonite and bismuthinite. An estimated 90% of the gold occurs as free gold and the remainder is present in minerals such as
maldonite (Au
2
Bi). Silver is also present with a gold to silver ratio of approximately 15 to 1.
Exploration
The exploration strategy at Navachab’s main deposit is to evaluate the shallow north pit 2 mineralisation (located near the main pit)
where it plunges down to 250m below surface. Drilling during the year has confirmed the down plunge extension of this oreshoot
and this near surface mineralisation will assist in unlocking deeper footwall and hangingwall mineralisation for further exploitation down
to 350m below surface. Drilling during the year has confirmed the footwall and hangingwall down plunge extension. Drilling during
the next four years will focus on growing the Mineral Resource base by 0.3 to 0.4Moz per year and increasing the confidence level
in the mineralisation. Exploration of the satellite deposits will continue to focus on near-surface, high-grade “Grid A” type
mineralisation to displace low-grade plant feed during stripping of the main orebody extensions. Current satellite target areas are
Anomaly 16, Gecko, Steenbok, Starling and Klipspringer.
Projects
Exploration of the Gecko target has produced a shallow, high-grade Mineral Resource of 0.04Moz. This mineralisation can be used
to supplement the low production years. Exploration of the Anomaly 16 target, which is approximately 7km from the plant, has
produced a lower-grade Mineral Resource of approximately 0.12Moz with potential to grow significantly. The identified
Mineral Resource for Anomaly 16 is currently situated in the Valley target area, whilst the Central and Beacon target areas are yet to
be explored.
background image
P
122
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Navachab
Namibia
Navachab
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Navachab
Category
million
g/t
Tonnes
Moz
Anomaly 16
Measured
Indicated                                     1.69
1.28
2.17
0.07
Inferred                                       1.11
1.29
1.44
0.05
Total                                            2.81
1.29
3.61
0.12
Gecko
Measured                                          –
Indicated                                      0.50
1.59
0.80
0.03
Inferred                                       0.29
1.37
0.40
0.01
Total                                           0.79
1.51
1.20
0.04
Main pit
Measured
8.37
1.23
10.30
0.33
Indicated
70.37                         1.28
89.81
2.89
Inferred                                    21.93
1.12
24.56
0.79
Total                                       100.67
1.24
124.68
4.01
Stockpile (marginal ore)
Measured
6.72
0.53
3.55
0.11
Indicated                                       –
Inferred                                         –
Total                                          6.72
0.53
3.55
0.11
Stockpile (full grade ore)
Measured
8.21
0.76
6.23
0.20
Indicated                                          –
Inferred
–                             –                             –
Total                                           8.21
0.76
6.23
0.20
Navachab
Total                                        119.20
1.17
139.28
4.48
background image
P
123
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Navachab
Measured
10 x 10
Indicated
25 x 25
Inferred
50 x 50
Grade control      5 x 10
Exclusive Mineral Resource
The main pit contains the largest portion (2.36Moz) of the Exclusive Mineral Resource. Approximately 0.11Moz of the Exclusive
Mineral Resource hosted in the marginal ore stockpiles at a grade of 0.47g/t and the intention is to bring the gold to account
through the pre-concentration route in the future. The remainder of the Exclusive Mineral Resource is from Anomaly 16 (0.06Moz),
and Gecko (0.02Moz).
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Navachab
Category
million
g/t
Tonnes
Moz
Measured                                  9.03
0.58
5.24
0.17
Indicated                                 42.83
1.11
47.50
1.53
Inferred                                   23.33
1.13
26.41
0.85
Navachab
Total                                        75.20
1.05
79.15
2.54
background image
P
124
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Navachab
Namibia
Navachab
Navachab:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
4.5
4.4
4.3
4.2
4.1
4.0
3.9
3.8
3.7
3.6
3.5
Change
3.73
2009
-0.13
Depletion
0.15
Gold
price
0.40
Explo-
ration
0.30
Metho-
dology
4.48
2010
-0.12
Cost
0.15
Other
Navachab:
Ore Reserve reconciliation
2009 vs 2010
Ounces 
(millions)
1.85
1.80
1.75
1.70
1.65
1.60
1.55
1.50
1.45
Change
1.63
2009
-0.12
Depletion
-0.03
Model
change
0.00
New
ounces
from
projects
0.37
Scope
change
1.85
2010
0.00
Change in
Economics
0.00
Other
background image
P
125
Ore Reserve
The bulk of the Navachab Ore Reserve is from the main pit (1.57Moz). Of this 1.3Moz is classified as Probable and 0.26Moz is
classified as Proved Ore Reserve. Anomaly 16 and Gecko satellite pit provide 0.05Moz and 0.02Moz respectively. The total
Ore Reserve for Navachab as at the end of 2010 is 1.85Moz.
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Navachab
Category
million
g/t
Tonnes
Moz
Anomaly 16
Proved
Probable
1.13
1.47                         1.66                         0.05
Total                                          1.13
1.47
1.66
0.05
Gecko
Proved                                           –
Probable                                     0.43
1.67
0.71
0.02
Total                                           0.43
1.67
0.71
0.02
Main pit
Proved
6.06
1.35
8.18
0.26
Probable                                    28.18
1.44
40.62
1.31
Total                                         34.24
1.43
48.80
1.57
Stockpile (full grade ore)
Proved
8.21
0.77
6.31
0.20
Probable                                         –
Total                                          8.21
0.77
6.31
0.20
Navachab
Total
44.01
1.31
57.48
1.85
Inferred Mineral Resource in business plan
The Inferred Mineral Resource was used in the pit optimisation process and 0.22Moz, or 10.3%, is present in the designed pits and
in the LOM schedule.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Navachab
million
g/t
Tonnes
Moz
Comments
Anomaly 16
0.80
1.45
1.16
0.04
Gecko
0.13
1.28
0.16
0.01
Main pit
4.52
1.28
5.79
0.19
Total
5.44
1.31
7.12
0.23
background image
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Frederik Badenhorst
AusIMM
211026
19 years
Ore Reserve
George Botshiwe
AusIMM
229475
10 years
P
126
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Navachab
Namibia
Navachab
Navachab
– surface (metric)
Tonnes above 
cut-off (millions)
0
5
Average grade 
above cut-off (g/t)
400
350
300
250
200
150
100
50
0
7
6
5
4
3
2
1
0
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
2
4
3
1
Ore Reserve modifying factors
as at
Ex-
Cut-off
% RRF
% RRF
% MRF
% MRF
31 December 2010 Gold
change
value
Dilution   (based on
(based   (based on
(based
Navachab
price
rate
g/t Au
(%)
tonnes)
on g/t)
tonnes)
on g/t)
MCF%
MetRF%
Anomaly 16
850
8.71
0.60
0
100
100
100
100
95
69.22; 86.48*
Gecko
850
8.71
0.60
0
100
100
100
100
95
69.22; 86.48*
Main pit
850
8.71
0.60
0
100
100
100
100
95
69.22; 86.48*
Stockpiles                       850
8.71
0.60
0
100
100
100
100
95
69.22;
86.48*
* DMS = 69.22%, CIP = 86.48%
background image
P
127
Tanzania
Country overview
Geita is the largest of AngloGold Ashanti’s seven open-pit mines in Africa. Prior to April 2004, Geita was managed under the joint
venture agreement between Ashanti and AngloGold. Since the merger of the two companies, Geita is a wholly-owned subsidiary.
Mineral Resource estimation
As with any estimation techniques, the results are dependent upon the data quality and availability. The geological model is a critical
input to the Mineral Resource estimation process. The orebody boundaries for the individual deposits are defined from the detailed
logging of all geological boreholes and after validation this information is used to create a 3D model. This model is subsequently
populated with an appropriately dimensioned block model. The size of this block model is determined by analysing different block
sizes in relation to the variance of the blocks. A block size which gives an optimal variance is then chosen. Ordinary kriging is used
to interpolate values into the blocks. A geostatistical technique called uniform conditioning is then used to estimate the proportion of
economic ore that occur above the Mineral Resource cut-off and this is reported according to the SMU.
Ore Reserve estimation
The Mineral Resource models as produced by the geology department are used as the basis for the Ore Reserve. Appropriate mining
dilution is used as a modifying factor in the Ore Reserve conversion process. Appropriate Ore Reserve cut-off grades are applied and
optimised pit shells are generated taking into cognisance the economic parameters. The final pits are then designed taking into
consideration the optimised pit shell and recommended slope geometry.
background image
P
128
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Geita
Tanzania
Geita
Location
The Geita gold mine is located approximately 910km from Dar es Salaam in the Lake Zone of northern Tanzania. The tenements are
situated within the Sukumaland Greenstone Belt of the Lake Victoria goldfields which hosts other gold mines including Golden Pride,
Bulyanhulu, Tulawaka and North Mara. This geological terrain is considered to be one of the most productive Archaean Greenstone
Belts in East Africa. Mining at Geita is undertaken by standard open-pit mining methods.
Geology
The Geita Greenstone trend is a component of the Sukumaland Greenstone Belt. This zone of Archaean rocks strikes east-west, is
60km long and up to 15km wide. The terrain is made up of upper to mid-Nyanzian greenstone facies rocks that consist mainly of
clastic sediments, intermediate to felsic volcaniclastics and banded iron formations (BIFs). These rocks form a sedimentary sequence
that is up to 1,000m thick.
North-west trending deformation corridors separate the Geita Greenstone trend into three distinct sub-terrains. These three sub-
terrains are Nyamulilima in the west (hosting the Star and Comet, Ridge 8 and Roberts deposits), Geita in the central part (hosting
the Nyankanga, Geita Hill, Lone Cone and Chipaka deposits) and Kukuluma to the north-east (hosting the Matandani, Kukuluma and
Area 3 West deposits). Approximately 78% of the Mineral Resource is situated in the Geita sub-terrain, with 16% in the Nuyamulilima
sub-terrain and 6% in the Kukuluma sub-terrain.
Late dextral faults have utilised the deformation corridors at Geita and have re-activated the pre-existing fault systems. Gold
mineralisation and hydrothermal alteration of the host lithologies, on all scales, is associated with late stage ductile to brittle-ductile
deformation.
Exploration
During 2009 and 2010 the exploration focus revolved around risk mitigation of the Mineral Resource that will be mined from 2011 to
2013. The exploration programmes therefore largely consisted of infill drilling, with subsequent updating and refinement of the Mineral
Resource model. During the next two years additional infill drilling programmes are planned to focus on the Nyankanga underground
project areas and the planned open pit production areas.
The mine’s regional exploration programme will ramp up during the next three years. The base consolidation work, involving mostly
ground geophysics, structural analysis, data consolidation and geological interpretation, was done according to ranked target areas
that had been identified by the 2008 airborne geophysical survey. Preliminary follow up drilling on the targets identified during the
2008 survey will continue into 2011 and the drilling results will be used to guide future drill targets after 2011.
Projects
Three prospective projects have been identified which collectively have the potential to increase the Mineral Resource and Ore
Reserve at Geita.
The Refractory Ore project is focussed on the Kukuluma sub-terrain where 58% of the ore is refractory and currently not economically
treatable at the Geita metallurgical plant. A project has been initiated to determine a suitable treatment process for this material and
exploration holes will be drilled in 2011 to assess the metallurgical characteristics of this ore. Success in this regard could increase
the potential of the underground Mineral Resource, which has a significant upside below the Kukuluma and Matandani open pits.
background image
P
129
The underground project will initially focus on the down dip extension of the Nyankanga orebody because this currently shows the
greatest potential for economic viability. The Nyankanka orebody, together with down dip extensions to the Geita Hill and Ridge 8
orebodies, shows that potentially 3.2Moz Mineral Resource could be exploited by underground mining methods. The strategy for the
Nyankanga underground project has been to evaluate the eastern (near surface) portion of the project area to assess whether it would
support a pilot underground mining plan aimed at paying for additional underground exploration development. The additional
exploration development drive would then prove up the predominantly Inferred Mineral Resource and provide further insight regarding
the eventual mining method to be employed. This project, known as ‘Block 1’, was partially drilled in 2010 and the remaining portion,
which forms the down dip extensions, will be drilled in 2011 to firm up on Mineral Resource confidence. The 2011 exploration drilling
plan will also focus on extensional drilling to the current underground Mineral Resource. A 3D geological model of the Geita trend will
amalgamate structural mapping and mineralogical characteristics and will be used to guide this extensional drilling.
The third project involves potential satellite pits. Extensions to current Mineral Resources in the vicinity of the Nyankanga and Star
and Comet pits have been given a higher priority. This will be followed by exploration work in the areas to the west and east of the
Geita Central area. This project is still in the early exploration stage and is expected to gather momentum over the next three years.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Geita
Category
million
g/t
Tonnes
Moz
Area 3 West (oxide)
Measured
Indicated                                      0.91
2.42                         2.21                         0.07
Inferred                                        0.00
2.02
0.01
0.00
Total                                            0.92
2.42
2.22
0.07
Area 3 West (refractory ore)
Measured
Indicated                                      0.18
2.76
0.50
0.02
Inferred                                            –
Total                                             0.18
2.76
0.50
0.02
Chipaka
Measured                                          –
Indicated                                       1.97
2.57
5.05
0.16
Inferred                                            –
Total                                            1.97
2.57
5.05
0.16
Geita Hill (open pit)
Measured
Indicated                                    15.36
2.92
44.79
1.44
Inferred                                       0.19
1.82
0.35
0.01
Total                                          15.55
2.90
45.14
1.45
Geita Hill (underground)
Measured
Indicated                                      4.67
5.43
25.36
0.82
Inferred                                       2.81
5.61
15.78
0.51
Total
7.48
5.50                       41.15                         1.32
Kalondwa Hill
Measured
Indicated                                          –
Inferred                                       1.15
3.60
4.12
0.13
Total                                            1.15
3.60
4.12
0.13
background image
P
130
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Geita
Tanzania
Geita
Mineral Resource continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Geita
Category
million
g/t
Tonnes
Moz
Kukuluma (non-refractory ore)
Measured
Indicated                                     0.10
2.84
0.30
0.01
Inferred                                           –
Total                                           0.10
2.84
0.30
0.01
Kukuluma (refractory ore)
Measured
Indicated                                      1.46
3.75
5.47
0.18
Inferred
–                             –                            –
Total
1.46                          3.75                         5.47                       0.18
Lone Cone
Measured
Indicated                                      0.77
2.61
2.01
0.06
Inferred                                       0.34
1.92
0.66
0.02
Total                                           1.12
2.40
2.67
0.09
Matandani (non-refractory ore)
Measured
Indicated                                      1.24
2.24
2.78
0.09
Inferred                                       0.00
8.58
0.03
0.00
Total                                            1.24
2.26
2.82
0.09
Matandani (refractory ore)
Measured
Indicated                                     2.43
3.77
9.19
0.30
Inferred                                      0.07
4.87
0.34
0.01
Total                                          2.50
3.81
9.53
0.31
Nyankanga (open pit)
Measured
Indicated                                    22.65
4.42
100.17
3.22
Inferred                                       7.51
2.36
17.73
0.57
Total                                         30.16
3.91
117.90
3.79
Nyankanga (underground)
Measured
Indicated                                     5.85
4.26
24.94
0.80
Inferred                                      4.91
4.02
19.75
0.64
Total                                         10.76
4.15
44.69
1.44
Ridge 8 (open pit)
Measured
Indicated                                     1.59
2.31
3.69
0.12
Inferred                                       0.13
4.22
0.54
0.02
Total                                           1.72
2.46
4.23
0.14
Ridge 8 (underground)
Measured
Indicated                                     1.20
4.58
5.50
0.18
Inferred                                      1.82
5.36
9.77
0.31
Total                                          3.02
5.05
15.27
0.49
Roberts
Measured                                       –
Indicated                                    6.87
1.63
11.17
0.36
Inferred                                     0.31
4.12
1.27
0.04
Total                                         7.18
1.73
12.45
0.40
background image
P
131
Mineral Resource continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Geita
Category
million
g/t
Tonnes
Moz
Star and Comet
Measured
Indicated                                      3.91
4.19
16.37
0.53
Inferred                                       2.70
3.41
9.21
0.30
Total                                            6.61
3.87
25.58
0.82
Stockpile (full grade ore)
Measured
Indicated                                      1.86
2.01
3.74
0.12
Inferred                                            –
Total                                            1.86
2.01
3.74
0.12
Stockpile (marginal ore)
Measured
Indicated                                      6.01
0.88
5.30
0.17
Inferred                                            –
Total                                            6.01
0.88
5.30
0.17
Stockpile (refractory ore)
Measured
Indicated                                      1.26
1.85
2.33
0.08
Inferred                                            –
Total                                            1.26
1.85
2.33
0.08
Geita
Total                                          102.27
3.43
350.46
11.27
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Geita
Measured
Indicated
20 x 20, and
Infill drilling was done at 20 x 20m to
40 x 40
increase the confidence of the Mineral
Resource; 40 x 40m is the lower limit for
the Indicated Mineral Resource
Inferred
50 x 50, and
50 x 80
Grade control     5 x 10, and
Depths vary from 10 to 30m
5 x 10
Exclusive Mineral Resource
The Exclusive Mineral Resource at Geita totals 6.5Moz and includes the underground Mineral Resource plus additional material that
occurs between the Ore Reserve pit shell (at a gold price of $850/oz) and the Mineral Resource pit shell (at a gold price of $1,100/oz).
This material is sub economic to mine at the current Ore Reserve gold price and forms potential extensions to the current LOM in an
elevated gold price environment. A significant portion of this material is in the Inferred Mineral Resource category and infill drilling
programmes are planned to upgrade potentially economic areas to Indicated Mineral Resource.
background image
P
132
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Geita
Tanzania
Geita
Cut 9 contains approximately 0.2Moz of Exclusive Mineral Resource and lies immediately south-west of the Nyankanga open pit.
It could support an additional pushback and drilling will resume once access has been established. Further programmes to upgrade
confidence in the Star, Comet and Geita Hill East pits are planned for 2011.
The Exclusive Mineral Resource forming part of the mine’s business plan comprises approximately 0.5Moz from underground
extensions to the Nyankanga open pit and 0.2Moz from Inferred Mineral Resource material located within the design pits.
While the economic viability of the in-pit material is known, scoping and pre-feasibility studies are currently in progress to determine
the economic viability of the underground material. As part of these studies, exploration drives and infill drilling are planned to upgrade
the confidence in the Mineral Resource.
In instances where the orebody extends down dip, below the current LOM design pit shell and could potentially be exploited by
underground mining methods, a 35m crown pillar forms part of the Exclusive Mineral Resource below the open pit limits. This material
is not planned to be mined.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Geita
Category
million
g/t
Tonnes
Moz
Measured                                      
Indicated                                  41.62
2.93
121.83
3.92
Inferred                                    21.95
3.62
79.57
2.56
Geita
Total                                        63.57
3.17
201.40
6.48
Geita:
Mineral Resource reconciliation
2009 vs 2010
Ounces
 (millions)
11.6
11.5
11.4
11.3
11.2
11.1
11.0
10.9
Change
11.45
2009
-0.43
Depletion
0.54
Gold
price
0.00
Explo-
ration
0.33
Metho-
dology
11.27
2010
-0.58
Cost
-0.05
Other
Geita:
Ore Reserve reconciliation
2009 vs 2010
Ounces
 (millions)
5.1
5.0
4.9
4.8
4.7
4.6
4.5
4.4
4.3
4.2
Change
5.07
2009
-0.46
Depletion
-0.26
Model
change
0.00
New
ounces
from
projects
-0.06
Scope
change
4.21
2010
-0.03
Change in
Economics
-0.04
Other
background image
P
133
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Geita
Category
million
g/t
Tonnes
Moz
Area 3 West (oxide)
Proved
Probable                                       0.40
2.56
1.03
0.03
Total                                            0.40
2.56
1.03
0.03
Geita Hill (open pit)
Proved
Probable                                     11.72
2.66
31.23
1.00
Total                                         11.72
2.66
31.23
1.00
Nyankanga (open pit)
Proved
Probable                                    19.20
4.03
77.48
2.49
Total                                         19.20
4.03
77.48
2.49
Ridge 8 (open pit)
Proved
Probable
0.70
2.51                        1.76                         0.06
Total                                           0.70
2.51
1.76
0.06
Roberts
Proved                                           –
Probable                                     2.75
1.60
4.39
0.14
Total                                           2.75
1.60
4.39
0.14
Star and Comet
Proved
Probable                                     2.50
4.07
10.19
0.33
Total                                           2.50
4.07
10.19
0.33
Stockpile (full grade ore)
Proved
Probable
1.74                         1.83                          3.20
0.10
Total                                           1.74
1.83
3.20
0.10
Stockpile (marginal ore)
Proved
Probable                                      1.89
0.94
1.78
0.06
Total                                           1.89
0.94
1.78
0.06
Geita
Total                                          40.92
3.20
131.06
4.21
background image
P
134
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Continental Africa – Geita
Tanzania
Geita
Inferred Mineral Resource in business plan
No Inferred Mineral Resource is included in the pit optimisation exercise. Although it does not contribute to the economic assessment
of the optimised pit (it is deactivated during the optimisation runs), it is present within the final pit shell as Exclusive Resource.
The magnitude of this Inferred Mineral Resource is quantified in the table below.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Geita
million
g/t
Tonnes
Moz
Comments
Area 3 West (oxide)
0.00
1.40
0.00
0.00
Geita Hill (open pit)
0.17
2.71
0.46
0.01
Ridge 8 (open pit)
0.00
1.19
0.00
0.00
Star and Comet
0.07
3.37
0.23
0.01
Nyankanga (open pit)
3.23
1.72
5.56
0.18
Most of the ore is full grade ore from Cut 7
and Cut 8
Total
3.47
1.80
6.25
0.20
background image
P
135
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Steven Robins
AusIMM
222533
15 years
Ore Reserve
Jasper Musadaidzwa
AusIMM
991333
12 years
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
% RRF
% RRF
% MRF
% MRF
Gold
change
value   (based on
(based   (based on
(based
Geita
price
rate
g/t Au
tonnes)
on g/t)
tonnes)
on g/t)
MCF%      MetRF%
Area 3 West (refractory ore)
850
1,300
1.48
100
100
105
95
95
59
Area 3 West (oxide)
850
1,300
1.36
100
100
105
95
95
81
Chipaka
850
1,300
1.38
100
100
105
95
95
78
Kukuluma (non-refractory ore)
850
1,300
1.97
100
100
105
95
95
75
Kukuluma (refractory ore)
850
1,300
2.09
100
100
105
95
95
46
Lone Cone
850
1,300
1.07
100
100
105
95
95
88
Matandani (non-refractory ore)
850
1,300
1.68
100
100
105
95
95
84
Matandani (refractory ore)
850
1,300
1.94
100
100
105
95
95
50
Nyankanga (open pit)
850
1,300
1.19
110
95
100
100
95
89
Ridge 8 (open pit)
850
1,300
1.40
100
100
105
95
95
82
Roberts
850
1,300
1.38
100
100
105
95
95
85
Star and Comet
850
1,300
1.41
100
100
110
91
95
85
Stockpile (full grade ore)
0.90
100
100
100
100
95
86
Stockpile (marginal ore)
1.28
100
100
100
100
95
86
Stockpile (refractory ore)
2.33
100
100
100
100
95
52
Geita Hill (open pit)
850
1,300
1.25
105
95
105
95
95
87
Geita
– surface (metric)
Tonnes above 
cut-off (millions)
0
9
Average grade
 above cut-off (g/t)
5
4
3
80
70
60
50
40
30
20
10
0
16
14
12
10
8
6
4
2
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
6
8
7
2
1
Geita
– underground (metric)
Tonnes above 
cut-off (millions)
0
9
Average grade
above cut-off (g/t)
5
4
3
60
50
40
30
20
10
0
14
12
10
8
6
4
2
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
6
8
7
2
1
background image
P
136
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Australasia
Australasia
Australia
Western Australia
Sunrise Dam
Tropicana
performance
Solid
operational
background image
P
137
Regional overview
AngloGold Ashanti’s sole operating mine in Australasia is Sunrise Dam. The Company is also developing the new Tropicana gold mine
in Western Australia, along with joint venture partner Independence Group Ltd., who hold a 30% stake. Tropicana, a greenfield
discovery made by AngloGold Ashanti, is expected to deliver its first production in 2013. AngloGold Ashanti is managing that project
along with a vast exploration programme in the area that covers some 13,500km2 of tenements along a 600km strike length,
considered one of the most prospective regions for new gold discoveries in Australia.
Production from Australasia declined by 1% to 396,000oz in 2010, equivalent to 8.7% of group production.
The Mineral Resource for Australasia, attributable to AngloGold Ashanti, totalled 7.05Moz at year-end, including an attributable
Ore Reserve of 3.74Moz.
All Mineral Resources and Ore Reserves listed are attributable unless otherwise stated.
Mineral Resource by region
Tonnes
Grade
Contained gold
as at 31 December 2010
Category
million
g/t
Tonnes
Moz
Australasia Region
Measured
34.88
1.74
60.55
1.95
Indicated
35.49
2.85
101.12
3.25
Inferred
19.84
2.90
57.63
1.85
Total
90.21
2.43
219.30
7.05
Ore Reserve by region
Tonnes
Grade
Contained gold
as at 31 December 2010
Category
million
g/t
Tonnes
Moz
Australasia Region
Proved
24.05
2.10
50.45
1.62
Probable
23.39
2.81
65.83
2.12
Total
47.44
2.45
116.28
3.74
background image
P
138
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Australasia – Australia
Country overview
The Australian assets were acquired by AngloGold Ashanti at the end of 1999 and currently comprise the Sunrise Dam gold mine
and the Tropicana project.
AngloGold Ashanti owns 100% of Sunrise Dam gold mine. The Tropicana project is a joint venture with Independence Group NL in
which AngloGold Ashanti Australia Limited (AGAA) holds 70%.
The Tropicana deposit represents a discovery in a new gold province in which the joint venture partners have a dominant land position
and a competitive advantage in understanding the mineralised system. Exploration potential in the district is high and a number of
large targets have been identified.
Mineral Resource Estimation
Sunrise Dam
Open-pit estimates are generated using a geostatistical method called multiple indicator kriging. All available geological drill-hole
information is validated for use in the models and the local geology of the orebody is used to classify the drill-hole information into
appropriate geostatistical domains. Detailed statistical analyses are conducted on each of these domains and this allows for the
identification of high-grade outliers. If these values are anomalous to the general population characteristics then they are cut back to
the appropriate upper limit of the population.
Estimation of the underground Mineral Resource uses the geological model boundaries to subdivide all drill-hole data into appropriate
domains. Statistical analyses are performed on these domains and, in a similar manner to that of open-pit estimation, high-grade
outliers are identified and appropriately cut back to the upper limit of the population. A geostatistical method called ordinary kriging
is used to produce estimates of a pre-determined block size. These block sizes are 10m x 10m and 20m x 20m. The geostatistical
technique of conditional simulation has been used to estimate the Cosmo ore zone.
Tropicana
The geostatistical method of uniform conditioning is used to estimate the Mineral Resource. All available geological drill-hole
information is validated for use in the models and the local geology of the orebody is used to classify the drill-hole information into
appropriate geostatistical domains. Detailed statistical analyses are conducted on each of these domains and this allows for the
identification of high-grade outliers. If these values are anomalous to the general population characteristics, then they are cut back to
the appropriate upper limit of the population.
Ore Reserve estimation
The Ore Reserve is estimated within the current pit design using the relevant Mineral Resource models and updated geotechnical
and metallurgical parameters and appropriate operating costs. The recoverable gold Mineral Resource model has been estimated
either by a geostatistical technique called multiple indicator kriging or uniform conditioning (non-linear geostatistical methods) and
reflects the selectivity or SMU of the mining equipment that is intended to be used to recover the Mineral Resource within the Ore
Reserve pit design.
Australia
background image
P
139
Australia
Sunrise Dam
Location
Sunrise Dam lies some 220km north-north-east of Kalgoorlie and 55km south of Laverton in Western Australia. The mine, 100%
owned by AngloGold Ashanti, comprises an open-pit operation and an underground operation. Mining is carried out by contractors
and ore is treated in a conventional gravity and leach process plant. The mining of the open pit has reached its final depth and only
a small north wall cutback is now in operation.
Geology
At Sunrise Dam, gold mineralisation is structurally controlled and vein hosted. The style of mineralisation can be differentiated
depending on the structure or environment in which it is hosted. There are three dominant domains, namely:
shear-related and high strain – e.g. Sunrise Shear Zone;
stock work development in planar faults with brittle characteristics (these occur in all rock types and are commonly concentrated
at lithofacies contacts within the volcanic stratigraphy or the porphyry margin and within hinge domains within the magnetite
shales) – e.g. Western Shear Zone, Watu, Cosmo, Summercloud; and
placer-style mineralisation hosted within the fluvial sediments.
The vein and shear styles of gold mineralisation are introduced primarily during the third and fourth deformation stages and variations
in structural style, ore and gangue mineralogy and alteration intensity are observed locally. Secondary (supergene) gold mineralisation
is also an important part of the Cleo-Sunrise ore system and is highlighted by extremely high gold grades developed near the base
of Tertiary paleochannels and horizontal blankets of mineralisation related to iron redox fronts and associated water tables.
Exploration
Near-mine exploration at Sunrise Dam is specifically focussed on a two-stage strategy of developing and advancing proximal
opportunities for the open pit and underground operations, whilst determining long-term opportunities that exist up to 1.5km below
the mine.
The focus for 2011 continues to be the increase of the Mineral Resource for the underground project. This will entail specific deep
drilling programmes of up to 2km vertical depth. These drill-holes will determine the extent of the main mineralising shoots of Cosmo,
Dolly and Midway Shear.
In 2011 near-mine exploration will continue, aimed at growing the Mineral Resource. The tenement areas have increased to in excess
of 300km2 and contain strategic and highly prospective targets with areas of known mineralisation within the central Laverton
Greenstone Belt. High-quality targets have also been located immediately proximal to and below the mine area. Open pit, satellite
opportunities have been investigated in 2010 and extensions to these will continue to be investigated throughout 2011. The
mineralisation at the Golden Delicious and Neville projects has proven that additional mineralisation sources away from the mega pit
exist and that further investigation is warranted.
In addition to projects within the owned tenure, strategic joint ventures continue to be developed. These opportunities, coupled with
world-class, cutting edge geological research and development initiatives support a well developed strategy that will provide the best
opportunity to successfully develop a strong and diverse project portfolio.
background image
P
140
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Australasia – Sunrise Dam
Australia
Sunrise Dam
Projects
The underground LOM project seeks to delineate deep Mineral Resources below the mine area. The extensions of the current
orebodies can be traced to depths in excess of 1.2km vertical and extend over a strike length of 2.5km. This, in addition to the satellite
underground and open pit opportunities, forms the framework for the LOM at Sunrise Dam.
During 2010 a detailed project charter was established to assess the viability of utilising the sub-level caving mining method in the
GQ and Dolly orebodies in the underground mine area.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Sunrise Dam
Category
million
g/t
Tonnes
Moz
Golden Delicious
Measured
Indicated                                     2.48
1.52
3.76
0.12
Inferred                                       0.25
1.68
0.42
0.01
Total                                           2.73
1.53
4.18
0.13
North Wall Cutback
Measured
0.77
1.82
1.41
0.05
Indicated                                     2.25
2.44
5.49
0.18
Inferred                                       0.01
1.48
0.02
0.00
Total                                           3.03
2.28
6.92
0.22
Stockpile (open pit)
Measured
15.86
1.18
18.77
0.60
Indicated                                       
Inferred                                         
Total                                         15.86
1.18
18.77
0.60
Underground
Measured                                       
Indicated                                    10.59
4.79
50.78
1.63
Inferred                                      4.29
5.28
22.66
0.73
Total
14.88
4.93
73.44                        2.36
Stockpile (underground)
Measured
0.18
5.98
1.08
0.03
Indicated                                       
Inferred                                         
Total                                          0.18
5.98
1.08
0.03
Sunrise Dam
Total
36.68
2.85
104.38
3.36
background image
P
141
Exclusive Mineral Resource
The Exclusive Mineral Resource includes Inferred Mineral Resource and low-grade stockpiles that do not currently meet the
Ore Reserve cut-off grade requirements.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Sunrise Dam
Category
million
g/t
Tonnes
Moz
Measured                                   9.62
0.93
8.96
0.29
Indicated                                    8.63
3.42
29.49
0.95
Inferred                                      4.55
5.08
23.10
0.74
Sunrise Dam
Total
22.80
2.70
61.55
1.98
Basalt and Dolerite Sills
BIF-dominated sediments
Volcanic Conglomerate
Mega porphyrytic Syenite
Turbidite Beds (no BIF)
Andesite lavas and domes
Felsic Porphyry Dykes
Breccia Lodes
Major Shear Zones
Granite
Legend
Carey SZ
Western
Shear Zone
Midway SZ
CUSZ
Hammerhead SZ
Dolly
Dolly
Deeps
Hammerhead
Watu
GQ
GQ 2
Mako 1
Mako 2
Sunrise SZ
Cross-section of SDGM
background image
P
142
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Australasia – Sunrise Dam
Australia
Sunrise Dam
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Sunrise Dam
Category
million
g/t
Tonnes
Moz
North Wall Cutback
Proved
0.61
2.08
1.28
0.04
Probable                                     1.87
2.78
5.19
0.17
Total                                           2.48
2.60
6.47
0.21
Stockpile (open pit)
Proved
6.40
1.55
9.94
0.32
Probable                                        
Total                                          6.40
1.55
9.94
0.32
Underground
Proved                                           
Probable
4.82                          5.26
25.34                          0.81
Total                                           4.82
5.26
25.34
0.81
Stockpile (underground)
Proved
0.18
5.98
1.08
0.03
Probable                                         
Total                                           0.18
5.98
1.08
0.03
Sunrise Dam
Total
13.89
3.08
42.83
1.38
Inferred Mineral Resource in business plan
Inferred material is included in the pit optimisation, but makes up only a small proportion (<1%) of the total Mineral Resource ounces.
Sunrise Dam:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
3.65
3.60
3.55
3.50
3.45
3.40
3.35
3.30
3.25
Change
3.62
2009
-0.36
Depletion
0.04
Gold
price
0.02
Explo-
ration
0.03
Metho-
dology
3.36
2010
-0.01
Cost
0.02
Other
Sunrise Dam:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
1.75
1.70
1.65
1.60
1.55
1.50
1.45
1.40
1.35
1.30
Change
1.73
2009
-0.39
Depletion
0.11
Model
change
0.00
New
ounces
from
projects
-0.13
Scope
change
1.38
2010
0.00
Change in
Economics
0.06
Other
background image
P
143
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
% RRF
% RRF
% MRF
% MRF
Gold
change
value
Dilution    (based on
(based   (based on
(based
Sunrise Dam – Surface price
rate
g/t Au
(%)
tonnes)
on g/t)
tonnes)
on g/t)
MCF%    MetRF%
Surface – North Wall
Cutback
850
0.84
0.90
85.50
Surface – Stockpile
(open pit)
850
0.84
0.90
85.50
as at 31 December 2010
Ex-
Cut-off
Stoping
Sunrise Dam –
Gold
change
value
width
Dilution
Dilution
Underground
price
rate
g/t Au
(cm)
(%)
(g/t)
MCF%     MetRF%
Stockpile (underground)
850
0.84
2.68
1,250
28
100
86.00
Underground
850
0.84
2.68
1,250               28              
100
86.00
background image
P
144
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Australasia – Sunrise Dam
Australia
Sunrise Dam
Sunrise Dam
– surface (metric)
Tonnes above 
cut-off (millions)
0.0
2.5
Average grade 
above cut-off (g/t)
30
25
20
15
10
5
0
5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
1.5
2.0
1.0
3.0
0.5
Sunrise Dam
– underground (metric)
Tonnes above 
cut-off (millions)
0
12
Average grade 
above cut-off (g/t)
16
14
12
10
8
6
4
2
0
24
22
20
18
16
14
12
10
8
6
4
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
8
10
6
14
4
2
Competent persons
Professional
Registration
Relevant
Category
Type
Name
organisation
number
experience
Surface
Mineral Resource
John Carswell
AusIMM
106181
17 years
Ore Reserve
Salih Ramazan
AusIMM
222870
9 years
Underground
Mineral Resource
John Carswell
AusIMM
106181
17 years
Ore Reserve
Steve Tombs
AusIMM
105785
30 years
background image
P
145
Australia
Tropicana
Location
The Tropicana gold project is located 330km east-north-east of Kalgoorlie, Western Australia. The mineral deposit is hosted in the
eastern margin of the Yilgarn Craton. Tropicana is the first deposit discovered in this remote portion of the Great Victoria Desert and
is widely regarded as defining an emerging greenfields gold province.
Together, the Tropicana, Havana and Boston Shaker deposits define a north-east trending mineralised corridor approximately
1.2km wide and 5km long that has been tested to vertical depth of over 1,000m. The Mineral Resource remains open down-dip for
the Tropicana, Havana and Boston Shaker deposits and to the south of the Havana deposit. Neither the immediate metamorphic
host rocks nor the mineralised zones are exposed at surface due to the presence of widespread cover sequences, which tend to be
between 0.5 and 15m thick.
Geology
The Tropicana deposit comprises a main ore zone up to 50m thick, dominantly hosted in quartzo-feldspathic gneiss, with subordinate
thin (3 to 5m), discontinuous mineralised lenses that typically return intercepts of >0.5g/t gold, hosted within the garnet gneiss-
dominated hanging wall package. The Havana deposit comprises a lower, laterally continuous higher-grade lode up to 50m thick that
is overlain, in central and southern parts of the proposed pit, by stacked, typically lower-grade and thinner (up to 25m thick) ore zones
dominantly hosted in quartzo-feldspathic gneiss.
Mineralisation within the ore zones is accompanied by 2% to 8% pyrite with accessory pyrrhotite, chalcopyrite, electrum and minor
other sulphides and tellurides. The gold mineralisation is related to shear planes that post-date the main gneissic fabric developed
during peak granulite-facies metamorphism.
Exploration
The Tropicana joint venture has assembled a dominant land-holding within an emerging greenfields belt hosting the Tropicana gold
project. Maximising the value of the known Mineral Resource and capitalising on the strategic ground holding is dependent on timely
application of exploration expenditure. The progressive focusing of expenditure in tenure shown to be more prospective will increase
the probability of new discoveries. This approach is being applied by the joint venture and will be achieved through sustained
investment in a systematic exploration programme.
Capitalising on the joint venture “first mover” advantage is dependent on systematic exploration of regional targets (more than 60km
from Tropicana), near resource targets (less than 60km), and extensions of the known Mineral Resource that form part of the
underground Mineral Resource. The exploration strategy aims to balance short to longer term value creation through sustained
deployment of expenditure within the portfolio of early, mid and later stage prospects and targets.
The key objectives for 2011 can be summarised as follows:
defining additional higher value ounces to maximise the value of the Tropicana gold project;
identifying the potential scale of underground Mineral Resource at Havana Deeps that can complement planned open pit mining
and extend the mine life; and
progressing exploration in the wider Tropicana Belt to leverage the value that may be unlocked at a province scale with the
objective of making further greenfields discoveries.
Projects
The Boston Shaker zone is currently the focus of a feasibility study, due for completion in mid-2011, which will define material
amenable to open pit mining in the early phase of Tropicana’s mine life.
background image
P
146
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Australasia – Tropicana
Australia
Tropicana
Havana Deeps is the focus of a pre-feasibility study into the viability of underground mining of the down-plunge extension of the
Havana mineralisation. The pre-feasibility study is due for completion in 2012.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Tropicana
Category
million
g/t
Tonnes
Moz
Surface
Measured                                 18.06
2.18
39.29
1.26
Indicated                                 20.17
2.04
41.09
1.32
Inferred                                  11.56
1.81
20.91
0.67
Total                                       49.79
2.03
101.29
3.26
Underground
Measured                                     
Indicated                                     
Inferred                                   3.73
3.65
13.63
0.44
Total                                       3.73
3.65
13.63
0.44
Tropicana
Total                                      53.53
2.15
114.92
3.69
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Tropicana
Measured
25 x 25
Indicated
50 x 50
Inferred
50 x 100, and
100 x 100
Exclusive Mineral Resource
The Exclusive Mineral Resource includes Inferred Mineral Resource material in the Havana South pit and at depth in the Havana and
Tropicana pits. It also includes the Boston Shaker zone and Havana Deeps, which are not yet drilled to a level of confidence to
establish an Ore Reserve.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Tropicana
Category
million
g/t
Tonnes
Moz
Measured                                  1.21
0.94
1.14
0.04
Indicated                                   3.47
1.67
5.80
0.19
Inferred                                   15.30
2.26
34.53
1.11
Tropicana
Total                                       19.98
2.08
41.47
1.33
background image
P
147
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Tropicana
Category
million
g/t
Tonnes
Moz
Underground
Measured                                       –
Indicated                                       –
Inferred                                    3.73
3.65
13.63
0.44
Tropicana
Total                                         3.73
3.65
13.63
0.44
background image
P
148
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Australasia – Tropicana
Australia
Tropicana
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Tropicana
Category
million
g/t
Tonnes
Moz
Surface
Proved                                    16.85
2.26
38.16
1.23
Probable                                  16.70
2.11
35.29
1.13
Tropicana
Total                                        33.55
2.19
73.45
2.36
Inferred Mineral Resource in business plan
Inferred material resource is included in the pit optimisation process, but makes up only a small proportion (less than 15%) of the total
mining inventory. Further drilling will increase the confidence in the estimation of this material with a view to convert the Inferred Mineral
Resource into an Ore Reserve in the near future.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Tropicana
million
g/t
Tonnes
Moz
Comments
Surface
7.12
1.34
9.58
0.31
Inferred Mineral Resource in the Tropicana
bankable feasibility study LOM schedule
Total
7.12
1.34
9.58
0.31
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
% RRF
% RRF
% MRF
% MRF
Gold
change
value
Dilution    (based on
(based    (based on
(based
Tropicana
price
rate
g/t Au
(%)
tonnes)
on g/t)
tonnes)
on g/t)
MCF%     MetRF%
Surface
880
0.80
0.70
90.30
Tropicana:
Mineral Resource reconciliation
2009 vs 2010
Ounces 
(millions)
4.0
3.8
3.6
3.4
3.2
3.0
2.8
Change
3.51
2009
0.00
Depletion
0.00
Gold
price
1.01
Explo-
ration
-0.14
Metho-
dology
3.70
2010
-0.69
Cost
0.00
Other
Tropicana:
Ore Reserve reconciliation
2009 vs 2010
Ounces 
(millions)
2.41
2.40
2.39
2.38
2.37
2.36
2.35
2.34
2.33
2.32
2.31
Change
2.31
2009
0.00
Depletion
0.04
Model
change
0.00
New
ounces
from
projects
-0.03
Scope
change
2.36
2010
0.05
Change in
Economics
-0.01
Other
background image
P
149
Tropicana
– surface (metric)
Tonnes above 
cut-off (millions)
0
Average grade 
above cut-off (g/t)
350
300
250
200
150
100
50
0
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
2.0
1.5
1.0
0.5
Tropicana
– underground (metric)
Tonnes above 
cut-off (millions)
1.0
2.5
Average grade
above cut-off (g/t)
30
25
20
15
10
5
0
4.0
3.8
3.6
3.4
3.2
3.0
2.8
2.6
2.4
2.2
2.0
1.8
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
1.5
2.0
3.0
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Mark Kent
AusIMM
203631
13 years
Ore Reserve
Marek Janas
AusIMM
210148
19 years
background image
P
150
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas
Americas
United States
Cripple Creek & Victor
Brazil
Serra Grande
AGA Mineração
Argentina
Cerro Vanguardia
Hard-won
in Brazil and Argentina
cemented
improvements
background image
P
151
Regional overview
AngloGold Ashanti has the Cripple Creek & Victor mine in the USA, the Cerro Vanguardia mine in Argentina and also the AngloGold
Ashanti Córrego do Sítio Mineração operation and the Serra Grande joint venture, both in Brazil. The Americas represents one of the
most important growth regions for AngloGold Ashanti.
Combined production from these operations increased by 3% to 842,000oz of gold in 2010.
The total Mineral Resource across the Americas, attributable to AngloGold Ashanti, was 43.87Moz at the end of 2010 and the
attributable Ore Reserve was 10.11Moz. AngloGold Ashanti also conducts an extensive greenfield exploration programme across the
Americas, most notably in Colombia, where it holds a significant land position and has made two greenfield exploration discoveries
– Gramalote and La Colosa – which together account for 13.5Moz of the Americas’ Mineral Resource.
All Mineral Resources and Ore Reserves listed are attributable unless otherwise stated.
Mineral Resource by region
Tonnes
Grade
Contained gold
as at 31 December 2010
Category
million
g/t
Tonnes
Moz
Americas Region
Measured
305.34
1.01
309.82
9.96
Indicated
268.77
1.29
346.77
11.15
Inferred
534.68
1.32
707.99
22.76
Total
1,108.78
1.23
1,364.58
43.87
Ore Reserve by region
Tonnes
Grade
Contained gold
as at 31 December 2010
Category
million
g/t
Tonnes
Moz
Americas Region
Proved
163.64
1.05
171.06
5.50
Probable
94.72
1.51
143.26
4.61
Total
258.36
1.22
314.32
10.11
background image
P
152
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Argentina
Argentina
Country overview
AngloGold Ashanti has a single operation in Argentina, the Cerro Vanguardia mine, which is a joint venture with Formicruz
(the province of Santa Cruz). The province of Santa Cruz holds 7.5% and the remaining 92.5% belongs to AngloGold Ashanti.
Mineral Resources estimation
The Mineral Resource estimates are computed using the relevant modules of the Datamine® software package. The geological model
is a critical part of the Mineral Resource estimation process. The orebody boundaries for each geological entity (veins, stock work,
wall rock) are defined from the detailed logging of all geological boreholes and after validation this information is used to create a three
dimensional model. This model is subsequently overlain with a 5 x 25 x 5m (X by Y by Z) block model. The block sizes used are
chosen to represent the dimensions in which the deposit is intended to be mined.
Volumetric measurements of the orebody are subsequently computed in the system using the relevant block dimensions.
Ordinary kriging is used to perform the grade interpolation. Field tests are conducted to determine appropriate in-situ densities.
Stochastic simulations are performed in the main orebodies for uncertainty assessment and the Mineral Resource is then classified
into the Measured, Indicated and Inferred Mineral Resource categories according to stringent rules.
Ore Reserve estimation
The appropriate Mineral Resource models are used as the basis for the Ore Reserve. All relevant modifying factors such as mining
dilution and costs are used in the Ore Reserve conversion process. This is based on the original block grades and tonnage
and includes waste material (both internal and external). Appropriate Ore Reserve cut-off grades are applied and all blocks above this
cut-off are reported. For the reserve optimisation, Whittle® software was used and Datamine® software was utilised to design the pits.
It is important to emphasise the importance of the silver during the optimisation of the pits, since silver is a significant by-product at
Cerro Vanguardia. The ratio of silver to gold commonly ranges from 10 to 15g/t of silver per 1g/t of gold.
Cerro Vanguardia uses conventional open-pit mining with a doubled bench height of 20m. Mining is distributed between multiple
operating pits, typically three to five at any one time; depending on the plant feed requirements. Waste dumps and heap-leach
stockpiles are located adjacent to each pit. Plant grade ore feed is trucked to either the long-range or short-range stockpiles in order
to smooth out the head grades and avoid recovery losses due to higher than planned silver grades. The average stripping ratio for
the remaining 10 years of mine life is 26:1.
background image
P
153
Argentina
Cerro Vanguardia
Location
Cerro Vanguardia is located in the Santa Cruz Province, Southern Argentina, approximately 130km north-north-west of the coastal
town of San Julián. The mining lease encompasses an area of approximately 520km2. Access to the area is by plane from Buenos
Aires to Comodoro Rivadavia or Rio Gallegos and subsequently by road to the mine site.
Geology
Cerro Vanguardia is located in the central portion of the 60,000km2 Deseado Massif, the most extensive stratigraphic and structural
unit in Southern Argentina. The Deseado Massif consists of Palaeozoic low-grade metamorphic basement rocks, unconformably
overlain by a thick sequence of Lower to Upper Jurassic volcanic and volcanoclastic rocks of intermediary and acidic composition.
These older rocks are exposed in erosional windows through overlying Cretaceous sediments and Tertiary to Quaternary basalts.
The Chon Aike Formation hosts a low sulphidation epithermal type gold and silver deposit. The true thickness of the ignimbrite
sequence is estimated to have exceeded 535m but some lateral thickness variations have been identified across the district.
Epithermal Au-Ag bearing structures cut across all units in the stratigraphy. The two main ignimbrite units, Masiva-Lajosa and
Granosa, host the majority of mineralised veins. The Masiva-Lajosa ignimbrite occurs at the top of the sequence whilst the Granosa
ignimbrite occurs towards the base. These two ignimbrites are separated by two thinner, polymict ignimbrite units (Brechosa and
Brechosa Base) and a sequence of stratified crystal- to ash-rich tuffs. The base of the sequence is a mixed unit of stratified ignimbrite
interspersed with fine-grained tuffs.
The mineralisation is concentrated in steeply dipping quartz veins that cut the flat lying ignimbrites and volcaniclastic rocks.
From 1991, when exploration began at Cerro Vanguardia, until 2010, a total of 106 mineralised veins or structures have been
discovered. The veins have a total lateral extent of 230km and 57 of these mineralised veins or structures have been included in the
Mineral Resource.
Exploration
The exploration programme in 2010 was focussed mainly in the central and southern portions of the Cerro Vanguardia mining lease
area. Both these areas have stratigraphy and vein orientations that are favourable for mineralisation. A total of 23,602m of DD and
27,596m of RC drilling was completed during the year. The veins that were drilled were Atila 2, Fortuna Este, Loma del Muerto,
Cuncuna, Lucy-Concepción Norte, El Lazo, Gésica, Paula 2, Liliana, Águila, Luciana 1 and Evelyn. The additional Mineral Resource
that was generated was separated into vein Mineral Resources and heap leach Mineral Resources.
Projects
Cerro Vanguardia currently mines from multiple open pits that are up to 200m deep. The highest grade and thickest veins were mined
first to maximise the NPV. Mining costs and strip ratios have increased as grades have decreased over the years. Higher gold prices
have extended the life of Cerro Vanguardia, but at higher stripping ratios and operating costs.
A feasibility study is currently being undertaken at Cerro Vanguardia that is intended to optimise the LOM through reduced stripping
ratios (from 26:1 to 16:1), thereby reducing mining costs per tonne of ore mined. Plans are also in place to convert to underground
mining in selected pits in order to maintain current production levels. The benefits of this optimisation are that, apart from reduced
cash costs and waste material generation, additional ounces may be mined due to increased access and selectivity. It will also enable
the mining of veins that are currently not mineable from open pits.
background image
P
154
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Cerro Vanguardia
Argentina
Cerro Vanguardia
The underground mining proposed at Cerro Vanguardia will complement the current open-pit production. The tonnage from the open
pits will decrease to an average of 700,000t per year as the highest stripping ratio open pits are replaced with underground
operations. The underground mines are expected to increase their production to 300,000t per year. The only vein that is currently
being mined from underground is Mangas, but underground development is taking place at Osvaldo Cb4 and Osvaldo Cb9 and there
are several more projects in the pipeline, such as Cuncuna, Liliana, Zorro, Osvaldo Cb10 and Osvaldo Cb12.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Cerro Vanguardia
Category
million
g/t
Tonnes
Moz
Vein Resources (open pit)
Measured
1.33
6.70
8.89
0.29
Indicated                                     9.31
6.32
58.83
1.89
Inferred                                      4.86
5.49
26.64
0.86
Total                                         15.49
6.09
94.36
3.03
Heap leach
Measured
9.74
0.74
7.23
0.23
Indicated                                   10.28
0.62
6.37
0.20
Inferred                                      5.09
0.57
2.91
0.09
Total                                        25.11
0.66
16.51
0.53
Vein Resources (underground)
Measured
0.06
8.70
0.50
0.02
Indicated                                     1.27
11.46
14.50
0.47
Inferred                                      0.25
11.82
2.99
0.10
Total
1.58                        11.42                      17.99                        0.58
Cerro Vanguardia
Total
42.18
3.06
128.87
4.14
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Cerro Vanguardia
Measured
12.5 x 12.5
Indicated
40 x 40
Inferred
80 x 80
Grade control     5 x 10
background image
P
155
Exclusive Mineral Resource
The Exclusive Mineral Resource is primarily located in the space generated between the pit design and the Mineral Resource shell
and is due to the difference in the economic parameters that have been used. In very marginal deposits, where the grade of Au and
Ag are above the Mineral Resource cut-off but below the Ore Reserve cut-off, significant zones of Exclusive Mineral Resource
will be generated. Very deep Mineral Resource will also not be converted to Ore Reserve and is therefore listed as Exclusive
Mineral Resource.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Cerro Vanguardia
Category
million
g/t
Tonnes
Moz
Measured                                  1.36
3.61
4.91
0.16
Indicated                                 16.70
2.20
36.72
1.18
Inferred                                    9.95
2.97
29.56
0.95
Cerro Vanguardia
Total                                       28.01
2.54
71.18
2.29
Mineral Resource by-product: Silver (Ag)
as at 31 December 2010
Tonnes
Grade
Contained silver
Cerro Vanguardia
Category
million
g/t
Tonnes
Moz
Measured
11.12
25.56
284.26
9.14
Indicated
20.86
76.62
1,598.42
51.39
Inferred
10.20
79.76
813.38
26.15
Cerro Vanguardia
Total
42.18
63.92
2,696.06
86.68
Cerro Vanguardia:
Mineral Resource reconciliation
2009 vs 2010
Ounces 
(millions)
4.20
4.15
4.10
4.05
4.00
3.95
3.90
3.85
3.80
3.75
3.70
3.65
Change
3.88
2009
-0.19
Depletion
0.00
Gold
price
0.49
Explo-
ration
-0.04
Metho-
dology
4.14
2010
0.00
Cost
0.00
Other
Cerro Vanguardia:
Ore Reserve reconciliation
2009 vs 2010
Ounces 
(millions)
1.88
1.86
1.84
1.82
1.80
1.78
1.76
1.74
1.72
1.70
1.68
Change
1.88
2009
-0.19
Depletion
0.11
Model
change
0.00
New
ounces
from
projects
0.03
Scope
change
1.84
2010
0.00
Change in
Economics
0.01
Other
background image
P
156
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Cerro Vanguardia
Argentina
Cerro Vanguardia
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Cerro Vanguardia
Category
million
g/t
Tonnes
Moz
Vein Resources (open pit)
Proved
0.62
6.75
4.17
0.13
Probable                                     4.60
6.54
30.10
0.97
Total                                          5.22
6.57
34.28
1.10
Heap leach
Proved
8.70
0.71
6.15
0.20
Probable                                     2.40
0.53
1.27
0.04
Total
11.11                          0.67
7.43                        0.24
Vein Resources (underground)
Proved
0.12
7.51
0.90
0.03
Probable                                     1.56
9.12
14.24
0.46
Total                                          1.68
9.01
15.14
0.49
Total stockpiles
Proved
0.10
4.20
0.40
0.01
Probable                                        
Total                                          0.10
4.20
0.40
0.01
Cerro Vanguardia
Total
18.10
3.16
57.25
1.84
Inferred Mineral Resource in business plan
The Inferred Mineral Resource that has been included in the pit design is not included in the Ore Reserve statement. These resources
are normally located in the deep and lateral zones of the Mineral Resource models. In order for ore from the Inferred Mineral Resource
to be included in the production plan, it must be upgraded by in-fill drilling. At Cerro Vanguardia a total of 185,000oz was not declared
as an Ore Reserve, and of this, 155,000oz are located in five pits.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Cerro Vanguardia
million
g/t
Tonnes
Moz
Comments
Vein Resources (open pit)
1.27
5.15
6.52
0.21
Represents 18% of open pit schedule
CVSA – Heap leach
1.56
0.46
0.72
0.02
Represents 13% of heap leach schedule
Vein Resources (underground)
0.38
8.26
3.18
0.10
Represents 16% of underground schedule
Total
3.21
3.24
10.41
0.33
background image
P
157
Cerro Vanguardia
– surface (metric)
Tonnes above 
cut-off (millions)
0
10
Average grade 
above cut-off (g/t)
2
16
14
12
10
8
6
4
2
18
16
14
12
10
8
6
4
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
4
8
6
Cerro Vanguardia
– underground (metric)
Tonnes above 
cut-off (millions)
0
20
Average grade
above cut-off (g/t)
5
1.6
1.4
1.2
1.0
0.8
0.6
0.4
0.2
0
30
28
26
24
22
20
18
16
14
12
10
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
15
10
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
% MRF
% MRF
Gold
change
value
Dilution   (based on
(based
Cerro Vanguardia
price
rate
g/t Au
(%)
tonnes)
on g/t)
MCF%      MetRF%
Heap leach
850
4.00
0.35
Vein Resources (open pit)
850
4.00
2.26
45
97
96
93
95
Vein Resources (underground)
850
4.00
15
97
96
93
95
Ore Reserve by-product: Silver (Ag)
as at 31 December 2010
Tonnes
Grade
Contained silver
Cerro Vanguardia
Category
million
g/t
Tonnes
Moz
Proved
9.54
22.40
213.62
6.87
Probable
8.57
100.82
864.00
27.78
Cerro Vanguardia
Total
18.10
59.52
1,077.62
34.65
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Cesar Riveros
AusIMM
304416
25 years
Ore Reserve
Jorge Sanguin
AusIMM*
20 years
*
Application for membership has been submitted
background image
P
158
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Brazil
Brazil
Country overview
AngloGold Ashanti’s operations in Brazil comprise the wholly-owned AngloGold Ashanti Brazil Mineração (formerly Morro Velho
assets) and a 50% interest in Mineração Serra Grande.
Mineral Resources estimation
The Mineral Resource Estimation is updated as part of the annual evaluation process. The geostatistical method used for estimation
is ordinary kriging using the lithology as the indicator. The Cuiabá mine dataset consists of channel samples and drill-hole samples.
The 3D modelling and estimation is done with two domains: the thick orebodies, comprised by the Fonte Grande Sul and Serrotinho
orebodies and the narrow vein domain of the Balancão, Galinheiro and Canta Galo orebodies. All channel and drill-hole samples are
used in the 3D geological models and the lithological maps of the orebodies are used to identify the rock types. A simulation technique
is used to determine the uncertainty in the orebody block-models. SGS (Sequential Gaussian Simulation) and SIS (Sequential
Indicator Simulation) methods are use to simulate the rock types (SIS) and the grade (SGS) combining the results in an
uncertainty analysis.
Raposos and Morro da Glória are estimated as the polygonal estimates (considering a weighted average of the samples over two
drilled or open panels and an average is applied for the lower panels where no drilling information is available). Both Raposos and
Morro da Glória have the information captured into datasets and preliminary estimation exercises confirm the current numbers in the
statement (Raposos by uniform conditioning method and Morro da Glória by ordinary kriging). Luzia da Motta estimates come from
ordinary kriging estimates for each target based on the available surface drilling which has a minimum pattern of 100 x 100m.
Ore Reserve estimation
The gold price and operational costs are taken into consideration in determining the Ore Reserve. The Ore Reserve is scheduled and
designed using Mine2-4D® computer software. Mining parameters such as the mining method, minimum mining width, MCF, dilution
and recovery are all applied in the process.
background image
P
159
Brazil
AGA Mineraçao
The wholly-owned AGA Mineração mining complex is located in south-eastern Brazil, in the state of Minas Gerais. It lies south and
east of the city of Belo Horizonte and has operations in the municipalities of Nova Lima, Sabará and Santa Bárbara. It is located within
the mining district referred to as the Iron Quadrangle (Quadrilátero Ferrífero) and this area hosts numerous historic and current gold
mining operations, as well as a number of open-pit limestone and iron ore operations.
Reorganisation of AGA Mineração was completed during the first half of 2010 and the new company is called AngloGold Ashanti
Córrego do Sítio Mineração (commonly referred to as AGA Mineração). The aim was to capture the operating and financial synergies
of the numerous mining operations in this historical mining district. The company now encompasses the mining operations at Cuiabá,
Lamego, Queiroz, Córrego do Sítio and São Bento.
AGA Mineração has mining rights over 61,864ha and ore is sourced from the Cuiabá and Lamego underground mines and processed
at the Cuiabá and Queiroz plants, while the Córrego do Sítio open pit mine has a heap-leaching facility. A feasibility study on the Nova
Lima Sul Project, which involves the restart of the mothballed Raposos mine, is being prepared for submission to the board in mid
2011. All these operations are primarily gold mines, but sulphur (for the production of sulphuric acid) is a by-product of the Cuiabá
mining operation.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
AGA Mineração
Category
million
g/t
Tonnes
Moz
Measured
8.79
7.10
62.38
2.01
Indicated
13.68
6.33
86.55
2.78
Inferred
28.52
6.95
198.35
6.38
AGA Mineração
Total
50.99
6.81
347.29
11.17
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
AGA Mineração
Category
million
g/t
Tonnes
Moz
Measured                                   6.30
6.17
38.87
1.25
Indicated                                    8.13
6.17
50.12
1.61
Inferred                                    26.34
6.87
181.10
5.82
AGA Mineração
Total
40.77
6.63
270.09
8.68
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
AGA Mineração
Category
million
g/t
Tonnes
Moz
Measured
1.05
4.60
4.82
0.15
Indicated
7.59
6.33
48.09
1.55
Inferred
23.50
7.33
172.11
5.53
AGA Mineração
Total
32.13
7.00
225.02
7.23
background image
P
160
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao
Mineral Resource by-product: Sulphur (S)
as at 31 December 2010
Tonnes
Grade
Sulphur
Pounds
AGA Mineração
Category
Mt
%S
Mt
million
Measured
6.19
6.9
0.42
937
Indicated
6.39
6.3
0.40
881
Inferred
14.46
7.0
1.01
2,232
AGA Mineração
Total
27.05
6.8
1.84
4,050
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
AGA Mineração
Category
million
g/t
Tonnes
Moz
Proved
4.94
6.74
33.34
1.07
Probable
6.08
5.50
33.41
1.07
AGA Mineração
Total
11.02
6.06
66.76
2.15
Inferred Mineral Resource in business plan
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
AGA Mineração
million
g/t
Tonnes
Moz
Comments
CdS I (oxides)
0.17
3.21
0.53
0.02
Inferred Mineral Resource in business plan
Lamego (Cabeca de Pedra)
0.43
3.88
1.65
0.05
Lamego (Carruagem)
0.50
5.33
2.69
0.09
Cuiabá (main orebodies)
0.33
6.31
2.08
0.07
Part of orebody FGS level 15 and orebody
SER levels 14 and 15
Cuiabá (narrow veins)
0.33
5.53
1.80
0.06
Part of orebodies BAL and GAL levels 12 and 13
CdS I (Cachorro Bravo)
1.58
6.78
10.74
0.35
There are no Ore Reserves in secondary areas
CdS I (Laranjeiras)
2.15
6.16
13.23
0.43
This includes Inferred Mineral Resources from
Carvoaria and Cachorro Bravo
Total
5.48
5.97
32.73
1.05
Brazil
AGA Mineraçao
AGA Mineração:
Mineral Resource reconciliation
2009 vs 2010
Ounces 
(millions)
11.2
11.1
11.0
10.9
10.8
10.7
10.6
10.5
10.4
Change
10.88
2009
-0.41
Depletion
-0.05
Gold
price
0.60
Explo-
ration
-0.03
Metho-
dology
11.17
2010
0.00
Cost
0.17
Other
AGA Mineração:
Ore Reserve reconciliation
2009 vs 2010
Ounces
 (millions)
2.20
2.15
2.10
2.05
2.00
1.95
1.90
1.85
1.80
Change
2.18
2009
-0.36
Depletion
0.09
Model
change
0.00
New
ounces
from
projects
-0.01
Scope
change
2.15
2010
-0.02
Change in
Economics
0.26
Other
background image
P
161
Ore Reserve below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
AGA Mineração
Category
million
g/t
Tonnes
Moz
Proved
0.49
6.40
3.15
0.10
Probable
2.72
5.82
15.86
0.51
AGA Mineração
Total
3.21
5.91
19.01
0.61
Ore Reserve by-product: Sulphur (S)
as at 31 December 2010
Tonnes
Grade
Sulphur
Pounds
AGA Mineração
Category
Mt
%S
Mt
million
Proved
4.18
5.7
0.24
527
Probable
4.04
5.1
0.20
451
AGA Mineração
Total
8.22
5.4
0.44
978
AGA Mineração
– surface (metric)
Tonnes above 
cut-off (millions)
0
14
Average grade 
above cut-off (g/t)
2
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0
18
16
14
12
10
8
6
4
2
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
6
10
8
4
12
AGA Mineração
– underground (metric)
Tonnes above 
cut-off (millions)
0
20
Average grade
above cut-off (g/t)
50
45
40
35
30
25
20
15
10
5
0
26
24
22
20
18
16
14
12
10
8
6
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
10
15
5
background image
P
162
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Córrego do Sítio
Brazil
AGA Mineraçao – Córrego do Sítio
Location
Córrego do Sítio is located 60km east of the city of Belo Horizonte, which is in the Minas Gerais State of Brazil. The southern portion
of this mining complex is referred to as Córrego do Sítio I whilst the northern portion (formerly known as São Bento) has been re-
named Córrego do Sítio II.
Geology
Córrego do Sítio is located in the eastern part of the lower to middle greenschist facies Archaean Rio das Velhas greenstone belt.
The Córrego do Sítio I and Córrego do Sítio II gold deposits and targets are located in a gold trend that extends for about 11.5km in
a north-easterly direction, from Grota Funda (CdS I areas) in the south to Jambeiro (São Bento/CdS II areas) in the north. The main
gold targets and deposits are distributed over three trends, namely the Córrego do Sítio trend, the Donana Trend and the
Cristina Trend.
The Córrego do Sítio orebodies consist of narrow north-east/south-west elongated lenses of mineralisation dipping at 20˚ to 30˚.
Córrego do Sítio is an orogenic type deposit and comprises many hydrothermal lodes with quartz veins and low sulphide content
disseminated in the wall rocks. The mineralised orebodies are narrow, elongated and folded. In general, the mineralised orebodies
are sericitic zones and quartz veinlets. The gold occurs as microscopic or sub-microscopic inclusions in aresenopyrite and sometime
berthierite. Other typical sulphide minerals in the orebodies are pyrrhotite, pyrite and chalcopyrite.
Exploration
Exploration started at the site in the 1980s and focussed mainly on the oxides. The sulphide potential has been better appreciated
since the start of the excavation of the underground exploration ramp in 2002. An extensive drilling campaign has been conducted,
aiming to add and convert Mineral Resource from three sets of orebodies known as Cachorro Bravo, Laranjeiras, and Carvoaria.
To date, over 21km of underground development has provided access and better understanding of these sets of orebodies.
Exploration of further targets is continuous, mainly by means of soil and channel samples, mapping and drilling.
Projects
The main projects at Córrego do Sítio are geared towards Mineral Resource conversion. Córrego do Sítio currently has 411,000oz of
Probable and Proved Ore Reserve. This value represents around 38% of the 1.1Moz of Mineral Resource declared in 2009, and
around 19% of the 2.1Moz of the current Mineral Resource. In 2010 a total of 60,000oz of additional Mineral Resource was added,
mainly from the Laranjeiras and Carvoaria orebodies. The strategy to convert the additional 664,000oz of Inferred Mineral Resource
to Indicated Mineral Resource is based on a large drilling programme of around 69,000m, to be drilled from 2010 to 2014 at Cachorro
Bravo, Laranjeiras and Carvoaria Velha orebodies. For 2011, the immediate strategy is to add Ore Reserve at panel 4 of the Cachorro
Bravo orebody system.
background image
P
163
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Córrego do Sítio
Category
million
g/t
Tonnes
Moz
CdS I (Cachorro Bravo)
Measured
0.86
8.31
7.15
0.23
Indicated                                     1.37
7.27
9.93
0.32
Inferred                                      0.62
7.61
4.73
0.15
Total                                          2.85
7.66
21.81
0.70
CdS I (Carvoaria)
Measured
Indicated                                     0.58
10.18
5.95
0.19
Inferred                                      0.64
8.50
5.41
0.17
Total                                           1.22
9.30
11.36
0.37
CdS I (secondary orebodies)
Measured
0.00
10.70
0.05
0.00
Indicated                                    0.50
5.29
2.64
0.08
Inferred                                     0.93
5.11
4.76
0.15
Total                                          1.43
5.19
7.44
0.24
CdS I (Laranjeiras)
Measured
Indicated                                    2.22
6.00
13.34
0.43
Inferred                                     2.22
7.73
17.17
0.55
Total                                         4.45
6.86
30.51
0.98
CdS I (transitional)
Measured
0.05
6.93
0.37
0.01
Indicated
0.53                         7.43                         3.94                        0.13
Inferred                                      0.22
6.62
1.49
0.05
Total                                          0.81
7.17
5.80
0.19
CdS I (oxides)
Measured
0.99
4.81
4.78
0.15
Indicated                                     0.84
5.19
4.37
0.14
Inferred                                      1.26
3.94
4.96
0.16
Total                                           3.09
4.56
14.11
0.45
CdS II (Pinta Bem)
Measured
Indicated                                         
Inferred                                        0.16
4.88
0.77
0.02
Total                                            0.16
4.88
0.77
0.02
background image
P
164
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Córrego do Sítio
Brazil
AGA Mineraç ˜ao – Córrego do Sítio
Mineral Resource continued
as at 31 December 2010
Tonnes
Grade
Contained gold
Córrego do Sítio
Category
million
g/t
Tonnes
Moz
CdS II (Sangue de Boi)
Measured
Indicated                                         
Inferred                                       1.39
5.89
8.18
0.26
Total                                           1.39
5.89
8.18
0.26
CdS II (São Bento mine)
Measured
Indicated                                        
Inferred                                      2.04
8.00
16.32
0.52
Total                                           2.04
8.00
16.32
0.52
CdS II (secondary orebodies)
Measured
Indicated                                    0.02
4.60
0.08
Inferred                                     0.19
4.89
0.95
0.03
Total                                          0.21
4.87
1.03
0.03
CdS II (transitional)
Measured
Indicated                                     0.02
5.52
0.13
0.00
Inferred                                       0.09
3.30
0.30
0.01
Total                                           0.12
3.77
0.43
0.01
CdS II (oxides)
Measured
Indicated                                    0.20
3.37
0.67
0.02
Inferred                                      0.27
5.88
1.60
0.05
Total                                           0.47
4.82
2.27
0.07
Córrego do Sítio
Total
18.24
6.58
120.04
3.86
Exclusive Mineral Resource
The Exclusive Mineral Resource includes all of the Córrego do Sítio II areas. It also includes the Cachorro Bravo, Laranjeiras and
Carvoaria underground orebodies, where there is no accessible underground development. The Inferred Mineral Resource that has
been included in the pit shells of the oxidised orebodies is also part of the Exclusive Mineral Resource.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Córrego do Sítio
Category
million
g/t
Tonnes
Moz
Measured                                    3.60
6.12
22.00
0.71
Indicated                                     4.73
6.44
30.45
0.98
Inferred                                       8.75
6.20
54.24
1.74
Córrego do Sítio
Total
17.08
6.25
106.68
3.43
background image
P
165
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Córrego do Sítio
Category
million
g/t
Tonnes
Moz
Measured
0.05
6.93
0.37
0.01
Indicated
2.40
7.41
17.78
0.57
Inferred
6.68
7.47
49.88
1.60
Córrego do Sítio
Total
9.13
7.45
68.03
2.19
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Córrego do Sítio
Category
million
g/t
Tonnes
Moz
CdS I (oxides)
Proved
0.40
3.22
1.27
0.04
Probable
0.31
2.97
0.93
0.03
Total
0.71
3.11
2.20
0.07
CdS I (Cachorro Bravo)
Proved
0.37
6.42
2.37
0.08
Probable
1.14
5.54
6.31
0.20
Total
1.51
5.76
8.68
0.28
CdS I (Laranjeiras)
Proved
Probable
0.59
5.06
2.98
0.10
Total
0.59
5.06
2.98
0.10
Córrego do Sítio
Total
2.80
4.94
13.87
0.45
background image
P
166
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Córrego do Sítio
Brazil
AGA Mineraçao – Córrego do Sítio
Inferred Mineral Resource in business plan
The Inferred Mineral Resource that has been included in the mine design is the mining panels in the lower areas of some sulphide
orebodies such as Cachorro Bravo, Laranjeiras and Carvoaria orebodies low panes. Some of the new orebodies are also included in
this category.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Córrego do Sítio
million
g/t
Tonnes
Moz
Comments
CdS I (oxides)
0.17
3.21
0.53
0.02
Inferred Mineral Resource included in
business plan
CdS I (Cachorro Bravo)
1.58
6.78
10.74
0.35
Inferred Mineral Resource included
CdS I (Laranjeiras)
2.15
6.16
13.23
0.43
Total
3.90
6.29
24.50
0.78
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Stoping
Gold
change
value
width
Dilution
Dilution
Córrego do Sítio
price
rate
g/t Au
(cm)
(%)
(g/t)
MCF%      MetRF%
CdS I oxides
850
1.85
1.06
28
0.20
92
88.00
CdS I sulphides
850
1.93
3.92
220
29
95
88.98
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Paulo de Tarso Ferreira
AusIMM
224828
25 years
Ore Reserve
Marcos Geraldo Simoni
AusIMM
224826
18 years
background image
P
167
Brazil
AGA Mineraçao – Cuiabá
Location
Cuiabá is located near Sabará, south-east of the city of Belo Horizonte and within the mining district referred to as the Iron
Quadrilateral.
Geology
Cuiabá mine has gold mineralisation associated with sulphides and quartz veins in Banded Iron Formation (BIF) and volcanic
sequences. The ore appears strongly stratiform due to the selective sulphidation of the iron-rich layers. Steeply plunging shear zones
tend to control the ore shoots, which commonly plunge parallel to intersections between the shears and other structures. The
controlling mineralisation structures are the apparent intersection of thrust faults with tight isoclinal folds in a ductile environment. The
host rocks are BIF and secondarily in mafic volcanics (mainly basaltic). Mineralisation is believed to be due to the interaction of low
salinity, carbon dioxide rich gold-bearing fluids with the high-iron BIF, basalts and carbonaceous graphitic schists. Sulphide
mineralisation consists of pyrite and pyrrhotite with subordinate arsenopyrite and chalcopyrite; the latter tends to occur as a late-
stage fracture fill and is not associated with gold mineralisation. Wallrock alteration is typically carbonate, potassic and silicic, showing
clear zonation in the underground environment. The ore is mainly concentrated in the silicic and sulphidation zones, inside the BIF or
in potassic (and sericitic) zones near the basalts. The main orebodies are Cuiabá are as follows:
normal limb: Fonte Grande Sul and Serrotinho; and
overturned limb: Balancão, Galinheiro and Canta Galo.
Exploration
The Cuiabá mine has four satellites orebodies: Surucucu, Dom Domingos, Galinheiro-FW and Viana. The first two orebodies are
located in the BIF structure and the other two in a schists in the footwall and hangingwall respectively. During 2010 a drilling
programme proved that the mineralisation at the Serrotinho orebody extended towards the Surucucu orebody. A budget for 2011
has been approved to drill out the Dom Domingos orebody between levels 15 to16 to identify extensions to the mineralisation.
background image
P
168
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Cuiabá
Brazil
AGA Mineraçao – Cuiabá
Projects
A conceptual study of the Cuiabá future mine began in 2009. The strategy is to optimise future Cuiabá production and to exploit the
narrow vein orebodies before the end of the mine life. The main focus is on alternative underground transport logistics for ore or
waste, alternative mining methods, simulations for optimised ventilation and other studies.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Cuiabá
Category
million
g/t
Tonnes
Moz
Cuiabá (main orebodies)
Measured
2.85
9.57
27.23
0.88
Indicated
0.81                        10.10
8.21
0.26
Inferred                                       6.01
9.84
59.17
1.90
Total                                           9.67
9.78
94.61
3.04
Cuiabá (narrow veins)
Measured
2.14
6.15
13.15
0.42
Indicated                                     2.86
5.43
15.52
0.50
Inferred                                       4.87
5.99
29.19
0.94
Total                                           9.87
5.86
57.86
1.86
Cuiabá (secondary areas)
Measured
0.84
6.10
5.13
0.16
Indicated                                     0.17
6.78
1.15
0.04
Inferred                                      0.32
6.08
1.92
0.06
Total                                          1.33
6.18
8.19
0.26
Cuiabá
Total                                          20.87
7.70
160.66
5.17
Exclusive Mineral Resource
At Cuiabá the main Exclusive Mineral Resource (0.32Moz) comes from the current production orebodies. This Exclusive Mineral
Resource is basically Inferred Mineral Resource that is in the process of being upgraded with a conversion drilling programme. These
Mineral Resources are located below infrastructure, starting on level 16 (at Fonte Grande Sul and Serrotinho) and level 14 (at
Balancão, Galinheiro and Canta Galo). In addition, secondary areas consisting of old stoping panels and satellite orebodies are also
considered Exclusive Mineral Resource (0.03Moz).
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Cuiabá
Category
million
g/t
Tonnes
Moz
Measured                                   1.85
7.34
13.59
0.44
Indicated                                   0.76
6.91
5.23
0.17
Inferred                                   11.20
8.06
90.28
2.90
Cuiabá
Total                                        13.81
7.90
109.10
3.51
background image
P
169
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Cuiabá
Category
million
g/t
Tonnes
Moz
Measured
0.48
7.52
3.58
0.12
Indicated
2.94
6.55
19.26
0.62
Inferred
10.48
8.20
85.98
2.76
Cuiabá
Total
13.90
7.83
108.82
3.50
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Cuiabá
Category
million
g/t
Tonnes
Moz
Main orebodies
Proved
2.13
8.90
18.94
0.61
Probable                                     0.50
10.81
5.37
0.17
Total                                           2.63
9.26
24.31
0.78
Narrow veins
Proved
1.83
5.30
9.71
0.31
Probable                                     2.58
4.76
12.27
0.39
Total                                           4.41
4.98
21.98
0.71
Cuiabá
Total                                           7.04
6.58
46.29
1.49
Inferred Mineral Resource in business plan
There are some areas of Inferred Mineral Resource representing 8% (125,000oz) of the total gold planned to be exploited.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Cuiabá
million
g/t
Tonnes
Moz
Comments
Cuiabá (main orebodies)
0.33
6.31
2.08
0.07
Part of orebody FGS level 15 and orebody
SER levels 14 and 15
Cuiabá (narrow veins)
0.33
5.53
1.80
0.06
Part of orebodies BAL and GAL level 12
and 13
Total
0.66
5.92
3.88
0.12
Ore Reserve below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Cuiabá
Category
million
g/t
Tonnes
Moz
Proved
0.49
6.43
3.15
0.10
Probable
2.51
5.82
14.61
0.47
Cuiabá
Total
3.00
5.92
17.75
0.57
background image
P
170
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Cuiabá
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Stoping
Gold
change
value
width
Dilution
Cuiabá
price
rate
g/t Au
(cm)
(%)
MCF%     MetRF%
Cuiabá (main orebodies)
850
1.93
5.52
1,000
5
94.50
93.00
Cuiabá (narrow veins)
850
1.93
3.64
400
5
94.50
93.00
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Paulo de Tarso Ferreira
AusIMM
224828
25 years
Ore Reserve
Silsomar Botelho
AusIMM
224833
24 years
Brazil
AGA Mineraçao – Cuiabá
background image
P
171
Brazil
AGA Mineraçao – Lamego
Location
Lamego is located in the northwestern part of the Iron Quadrangle metallogenetic province, close to Cuiabá gold mine. The mine is
located to the east of the city of Belo Horizonte City, which is in the Minas Gerais State in the south-eastern region of Brazil.
Geology
The gold mineralisation at Lamego is characterised by orebodies associated both with two horizons of chemical rocks, such as
banded iron formations (BIF) and metachert (MCH) and also with shear zones containing abundant quartz veinlets. The proportions
of these lithotypes vary substantially from one body to another. In the BIF, sulphide mineralisation is associated with the gold, whilst
in the metachert and quartz veins the gold occurs either as native gold or in sulphides. The orebodies are characterised by
sulphidation in the form of disseminated sulphide bands or as fracture filling, rarely as compact sulphide, hosted in BIF/MCH. sulphide
bands are rare in metachert. The plunge coincides both with the fold axis of the first two events and with the mineral stretching
lineation.
The Arco da Velha orebody is located on the eastern side of a large fold and extends approximately 250m along the strike. In the
northeastern portion of the orebody, the mineralisation is concentrated in the metachert, whilst in the southwestern portion it is
concentrated in the banded iron formation. Carbonaceous phillite and clorite/sericite schists occur in the hanging wall contact, while
the hydrothermal alteration zone marked by the meta-andesite occurs in the footwall.
The Cabeça de Pedra orebody is located in the hinge region of the large Lamego structure. The area which has shown the best
economic potential contains banded iron formations and metacherts (80% of the area is occupied by banded iron formation and the
remaining 20% by metacherts). The presence of faultings makes the stratigraphy complex in some areas. The carbonaceous phillite
and clorite/sericite schists normally occur in the hanging wall and meta-andesites in the footwall.
Carruagemis is the main orebody that opened the way for the Lamego project resumption. Structurally, it is located in the junction
zone or in the proximity of two fold limbs in the north-east portion of the major structure. It is a boudinaged ore body with two large
disruptions in the structure (pinch and swell), followed by eastward displacement. The gold mineralisation is mainly associated with
hydrothermal zones within the banded iron formations.
Projects
The Lamego mine project was approved in September 2009 and work to date has mainly involved the implementation and ramping
up required to start mining. This phase is expected to be completed by December 2011.
background image
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Lamego
Category
million
g/t
Tonnes
Moz
Arco da Velha
Measured
0.20
4.97
0.99
0.03
Indicated                                    0.12
4.90                         0.57
0.02
Inferred                                      0.48
3.77
1.81
0.06
Total                                          0.79
4.23
3.36
0.11
Cabeca de Pedra
Measured
0.07
6.14
0.41
0.01
Indicated
0.87                         4.80                         4.17                         0.13
Inferred                                      0.87
4.86
4.24
0.14
Total                                          1.81
4.88
8.82
0.28
Carruagem
Measured                                    0.04
13.65
0.52
0.02
Indicated                                     1.52
7.64
11.62
0.37
Inferred                                      1.22
5.98
7.30
0.23
Tota                                          l 2.78
6.99
19.44
0.62
Secondary areas
Measured
0.06
7.86
0.51
0.02
Indicated
0.05
8.28                        0.40                         0.01
Inferred                                      0.68
5.58
3.81
0.12
Total                                           0.80
5.93
4.72
0.15
Lamego
Total                                           6.18
5.88
36.34
1.17
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Lamego
Category
million
g/t
Tonnes
Moz
Measured                                  0.16
7.31
1.17
0.04
Indicated                                   1.63
6.46
10.58
0.34
Inferred                                     2.37
5.20
12.32
0.40
Lamego
Total                                         4.17
5.78
24.06
0.77
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Lamego
Category
million
g/t
Tonnes
Moz
Measured
0.00
4.40
0.02
0.00
Indicated
1.44
5.92
8.52
0.27
Inferred
2.32
5.17
11.99
0.39
Lamego
Total
3.76
5.46
20.53
0.66
P
172
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Lamego
Brazil
AGA Mineraçao – Lamego
background image
P
173
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Lamego
Category
million
g/t
Tonnes
Moz
Arco da Velha
Proved
0.13
3.55
0.46
0.01
Probable                                     0.07
3.88
0.28
0.01
Total                                          0.20
3.67
0.74
0.02
Cabeca de Pedra
Proved
0.05
4.11
0.20
0.01
Probable                                     0.04
3.92
0.17
0.01
Total                                          0.09
4.02
0.37
0.01
Carruagem
Proved                                       0.04
9.88
0.38
0.01
Probable                                     0.85
6.04
5.11
0.16
Total                                           0.88
6.21
5.49
0.18
Lamego
Total
1.18
5.60
6.60
0.21
Inferred Mineral Resource in business plan
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Lamego
million
g/t
Tonnes
Moz
Comments
Lamego (Cabeca de Pedra)
0.43
3.88
1.65
0.05
Lamego (Carruagem)
0.50
5.33
2.69
0.09
Total
0.93
4.67
4.34
0.14
background image
P
174
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Lamego
Brazil
AGA Mineraçao – Lamego
Ore Reserve below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Lamego
Category
million
g/t
Tonnes
Moz
Proved
Probable
0.21
5.85
1.25
0.04
Lamego
Total
0.21
5.85
1.25
0.04
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Stoping
Gold
change
value
width
Dilution
Lamego
price
rate
g/t Au
(cm)
(%)
MCF%     MetRF%
Lamego
850
1.93
3.42
3,500
5       94.50          93.00
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Paulo de Tarso Ferreira
AusIMM
224828
25 years
Ore Reserve
Leonardo Nunes Coelho
AusIMM
222679
9 years
background image
P
175
Brazil
AGA Mineraçao – Nova Lima Sul
Location
Nova Lima Sul project is located in the western portion of the Rio das Velhas greenstone belt, and all the targets are within a 16km
radius the Queiroz metallurgical plant. The project comprises mothballed operations (Raposos underground mine), old mines (Mina
Grande, Morro da Glória, Bicalho, Faria, Bela Fama), as well as old prospects (Luzia da Mota, Limoeiro) and several old surface
workings (Saboeiro Rasgão, Urubu and Luzia’s Mina Grande). The main project goal is to add and convert the Mineral Resource in
order to fill the current Queiroz plant’s spare capacity. For this reason, the project was split in three phases, according to areas of
best potential:
Phase I: Raposos + Luzia da Mota oxide
Phase II: Morro da Glória + Luzia da Mota Sulphide
Phase III: Urubu + Bicalho + Limoeiro + Saboeiro Rasgão
Geology
The Nova Lima Sul projects are situated in the south-western portion of the Iron Quadrangle (QF) in the Minas Gerais State of Brazil.
The area is located in the volcanic sedimentary sequence of the Nova Lima Group (Rio das Velhas Supergroup) which hosts the main
gold mines and mineral occurrences in the Iron Quadrangle.
The most common orebodies are massive, banded and disseminated sulphides hosted in banded iron formation and lapa seca (albite
hydrothermal rocks). The sulphidated orebodies hosted in BIFs and lapa seca are divided in two types, namely:
type 1, which consist of disseminated pyrrhotite, subordinate pyrite and arsenopyrite occurring in shear zones sub-parallel to the
bedding, with quartz veins parallel to the shear and in tension gashes; and
type 2, which is composed of pyrite and arsenopyrite, which replace the iron mineral-rich bedding, including quartz veins and
shear zones, which cut the layering at a high angle.
Mapped orebody dimensions are around 0.5 to 20m in thickness and the length (along plunge direction) can be more than 5,000m.
The orebody’s plunge is defined by the stretching lineation and it is parallel to the fold axis of the first two deformation regional events.
Geology of Raposos
The Raposos sequence is interpreted as a ductile thrust of the first deformative event. The main mineralised area is associated with
an anticline of the same event, in the position of the lateral ramp. The stratigraphic sequence, repeated by folds, has ultramafics at
the base, overlain by komatiitic basalts, basalts and andesites with layers of BIF. Pelites and metavolcaniclastic occur at the top of
the sequence. The BIF is oxide facies (magnetite and quartz), with carbonatisation in the mineralised areas.
The mineralisation is primarily located in the in BIF. The orebodies are surrounding by concentric hydrothermal alteration zones
consisting of sericitisation, carbonatisation and chloritisation that extend from the orebody outwards.
Geology of Morro da Gloria
In the Morro da Gloria area the rocks consist of komatiitic ultramafics, graphite phyllite, felsic metavolcaniclastic associated with
metapelites and several layers of banded iron formation.
The macro structures at Raposos and Morro da Gloria are anticlines and the mineralisation is associated with folds and shear zones,
surrounding by concentric hydrothermal alteration zones consisting of sericitization, carbonatisation and chloritisation. BIF is oxide
facies (magnetite and quartz), with carbonatisation in the mineralised areas. The gold is associated with sulphides and quartz veins
in the BIF and the altered schists.
background image
P
176
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Nova Lima Sul
Brazil
AGA Mineraçao – Nova Lima Sul
Geology of Luzia da Mota
The Luzia da Motta targets are mainly associated with two types of mineralisation, hydrothermal alteration zones (mainly quartz,
carbonate and sericite) and sulphides hosted in metavolcanoclastic schists (Luzia Belt). The sequence is also associated with meta-
basic/meta-ultrabasic rocks from komatiitic compositions with sulphides in a context very similar to Raposos Mine (Santana Belt).
The mineralisation occurs over 12 targets in a north-south orientation and the most important Mineral Resource delineated in the zone
is at the Santana Sul and Santana 0, 1 and 2 deposits.
Exploration
Plans to explore the Raposos mine and Morro da Glória by underground drilling and the Luzia da Motta targets by surface drilling are
underway. Morro da Glória will need to be dewatered before the orebodies can be accessed. The aim of the exploration programme
is to confirm and convert the Inferred Mineral Resource to the Indicated Mineral Resource category at drilling patterns of 60m along
the plunge direction and 30m along the orebody’s strike. A full exploration campaign, anticipated to be completed in 2014, will involve
76,800m of drilling, of which 24,000m will be underground drilling at Morro da Gloria; 37,500m surface drilling at Luzia da Motta and
15,300m underground drilling at Raposos.
Raposos
The underground drilling programmes at Morro da Gloria and Raposos will only be able to begin once dewatering and mine
refurbishment has taken place and it is safe to access these mines. It is expected that that it will take two years before underground
drilling can commence. One deep drill-hole (reaching 1,459m) is being drilled at Raposos surface to confirm mineralisation in depth,
specifically for the Espirito Santo and EW orebodies. The aim is to be able to mine down to level 40, which represents a reasonable
payback for further studies and risk amelioration drilling.
Luzia da Mota
Between the years 1993 and 2005 a total of 27,100m of DD and RC drilling was completed in the Luzia da Mota area. The
Santana 0,1 and 2 deposits had the largest amount of geological information and were therefore chosen as the preferred target areas
and in 2010 a total of 8,232m of follow-up drilling was completed on these targets. An environmental licence has been applied for
and needs to be approved before the 2011 drilling campaign of 12,300m can commence on the other mineralised trends.
Projects
The whole set of orebodies and disused mines in the southern region of Nova Lima is part of the project. This project comprises the
exploration and mine re-opening in areas such as Raposos and Morro da Gloria and new enterprises such as Luzia da Motta (open
pit for oxide ore and sulphide mineralisation potential down to a depth of 300m). For the last two years, AngloGold Ashanti has been
busy with conceptual, pre-feasibility and feasibility studies for the project and during that past year exploration and in-fill was
completed at Luzia da Motta to increase the confidence in the Mineral Resource. The main driving force of this project is to take
advantage of the current infrastructure (like the Raposos operating shaft and mining infrastructure) and current spare capacity in the
Queiroz plant (Raposos circuit for non-refractory ore) to improve the production of the region by between 60,000 and 100,000oz per
annum.
In 2011 exploration work will continue at Luzia da Motta plus 13,200m of drilling on other targets such as Cabaças, Casa Velha and
Morro das Cinzas. Underground chip sampling and drilling at Raposos will commence, depending on the progress of the dewatering
and refurbishment of the old mine workings.
background image
P
177
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Nova Lima Sul
Category
million
g/t
Tonnes
Moz
Morro da Gloria
Measured
Indicated                                          –
–                            –                             –
Inferred                                       1.24
6.60
8.18
0.26
Total                                           1.24
6.60
8.18
0.26
Raposos
Measured                                    0.18
7.19
1.26
0.04
Indicated                                    0.39
7.03
2.74
0.09
Inferred                                      2.15
6.61
14.20
0.46
Total                                          2.71
6.70
18.19
0.58
Luzia da Mota
Measured
0.51
1.66
0.85
0.03
Indicated                                     0.61
1.85
1.14
0.04
Inferred                                      0.63
2.99
1.89
0.06
Total                                           1.76
2.20
3.88
0.12
Nova Lima Sul
Total
5.71
5.30
30.25
0.97
Nova Lima Sul
Deep drilling Raposos
background image
P
178
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – AGA Mineraç ˜ao – Nova Lima Sul
Exclusive Mineral Resource
The Nova Lima Sul project currently does not have any declared Ore Reserve and only a Measured, Indicated or Inferred Mineral
Resource for Luzia da Motta, Raposos and Morro da Gloria. The present Mineral Resource statement has classified the Mineral
Resource for old Morro da Glória old mine as Inferred.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Nova Lima Sul
Category
million
g/t
Tonnes
Moz
Measured                                    0.69
3.07
2.11
0.07
Indicated                                    1.00
3.86
3.88
0.12
Inferred                                      4.02
6.03
24.26
0.78
Nova Lima Sul
Total
5.71
5.30
30.25
0.97
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Nova Lima Sul
Category
million
g/t
Tonnes
Moz
Measured
0.51
1.66
0.85
0.03
Indicated
0.81
3.11
2.53
0.08
Inferred
4.02
6.03
24.26
0.78
Nova Lima Sul
Total
5.35
5.17
27.64
0.89
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Paulo de Tarso Ferreira
AusIMM
224828
25 years
Brazil
AGA Mineraçao – Nova Lima Sul
background image
P
179
Brazil
Serra Grande
Location
Serra Grande is co-owned with Kinross Gold Corporation, with 50% of this joint venture attributable to AngloGold Ashanti. Serra
Grande controls, or has an interest in, approximately 55,000ha in and around the Crixás mining district in the north-western areas of
the Goiás State in central Brazil. Serra Grande is located 5km from the city of Crixás and is 420km from Brasilia, the capital of Brazil.
Serra Grande comprises three underground mines, namely Mina III, Mina Nova and Mina Palmeiras, and one open-pit mine on the
outcrop of Mina III (between surface and 50 level). The processing circuit is equipped with grinding, leaching, filtration, precipitation
and smelting facilities.
Geology
The Serra Grande gold deposits are hosted in a typical greenstone belt sequence. The host rocks belong to Crixás Group of the
Upper Archaean located in the Crixas greenstone belt. Gold mineralisation is associated with metasediments and metavolcanics from
the Ribeirão das Antas and Rio Vermelho formations respectively. The Crixas greenstone belt is surrounded by granitic gneiss terrains
from the Anta and Caiamar complexes and metasedimentary rocks from the Santa Terezinha Group.
Two main deformational events have been identified in the region. The first event is a thrusting event (D1 from west to east) developed
with irregular thrust ramp geometry. This event was responsible for stacking and inverting the stratigraphic sequences. The second
event (D2) was the thrusting of the Santa Terezinha sequence over the Crixas greenstone belt, folding the rocks (F2) and generating
the structural controls of the gold mineralisation.
The mineralised zones at Serra Grande have been separated into three main domains called Structure III, IV and Palmeiras.
In Structure III the mineralisation is located in quartz veins that are hosted in graphitic schists. It is also associated with massive and
disseminated sulphides (mainly pyrrhotite and arsenopyrite) that occur in a sequence of hydrothermally altered schists.
The mineralisation of Structure IV comprises quartz veinlets and disseminated sulphide (pyrrhotite) hosted in graphite schists.
The mineralised zones in the Palmeiras structure are hosted in sericite and chlorite schists with massive and disseminated sulphide
concentrated in folded zones. The ore shoots plunge downwards to the north-west and the dips vary between 6° and 35°.
Exploration
During the past four years Serra Grande has invested heavily in exploration to identify new orebodies and to improve the level of
information around the mining site. During this period 130,000m of drilling was completed along the main geological structures in the
area. The main result of this exploration programme was the discovery of the Pequizão orebody, located between Mina III and Mina
Nova. To date Pequizão has added 0.5Moz to the Inferred Mineral Resource and is open ended down plunge and along strike. Recent
drilling intersections have shown that the mineralisation extends below a depth of 500m and follow up drilling will continue.
A fast-track exploration programme, planned for the next two years, aims to define and evaluate the full potential of the known
orebodies such as Pequizão, Palmeiras, Orebody IV and Mina Nova. It is also intended to generate new targets in the north-west
structure and the region. This exploration programme will include 150,000m of drilling and also involve new geochemical and
geophysical surveys over the main geological structures within the 55,000ha mining lease area.
background image
P
180
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Serra Grande
Brazil
Serra Grande
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Serra Grande
Category
million
g/t
Tonnes
Moz
Mina Nova
Measured
1.23
3.48
4.28
0.14
Indicated                                    0.34
3.00                        1.02
0.03
Inferred                                      0.34
3.67
1.25
0.04
Total                                           1.91
3.43
6.55
0.21
Mina III
Measured
0.59
4.57
2.68
0.09
Indicated                                     0.56
4.42
2.49
0.08
Inferred                                      0.38
4.11
1.58
0.05
Total                                          1.53
4.40
6.74
0.22
Palmeiras
Measured                                   0.06
7.13
0.40
0.01
Indicated                                   0.25
5.18
1.31
0.04
Inferred                                     0.48
6.04
2.87
0.09
Total                                         0.78
5.84
4.58
0.15
Pequizao
Measured                                      –
Indicated                                     0.41
6.71
2.72
0.09
Inferred                                      1.08
5.27
5.68
0.18
Total                                          1.48
5.66
8.40
0.27
Open pit
Measured
0.48
3.33
1.61
0.05
Indicated                                     0.35
2.97
1.05
0.03
Inferred                                          –
Total                                          0.84
3.18
2.67
0.09
Total stockpiles
Measured
0.03
2.83
0.08
0.00
Indicated                                         –
Inferred                                          –
Total                                          0.03
2.83
0.08
0.00
Serra Grande
Total
6.58
4.41
29.02
0.93
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Serra Grande
Measured
10 x 10, 10 x 20
Indicated
10 x 20,
20 x 50, and
25 x 100
Inferred
50 x 50, 50 x 100
Grade control     2 x 2
Chip sampling
background image
P
181
Exclusive Mineral Resource
The Exclusive Mineral Resource is located below the infrastructure and mine development level.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Serra Grande
Category
million
g/t
Tonnes
Moz
Measured                                   0.11
4.04
0.44
0.01
Indicated                                    0.33
3.63
1.19
0.04
Inferred                                      2.28
5.00
11.39
0.37
Serra Grande
Total
2.71
4.80
13.01
0.42
Mineral Resource below infrastructure
as at 31 December 2010
Tonnes
Grade
Contained gold
Serra Grande
Category
million
g/t
Tonnes
Moz
Measured
Indicated
Inferred
4.56                          5.00
22.76                          0.73
Serra Grande
Total
4.56
5.00
22.76
0.73
Serra Grande:
Mineral Resource reconciliation
2009 vs 2010
Ounces (millions)
1.03
1.02
1.01
1.00
0.99
0.98
0.97
0.96
0.95
0.94
0.93
Change
1.03
2009
-0.09
Depletion
0.00
Gold
price
0.00
Explo-
ration
-0.00
Metho-
dology
0.93
2010
0.00
Cost
0.00
Other
Serra Grande:
Ore Reserve reconciliation
2009 vs 2010
Ounces (millions)
0.42
0.40
0.38
0.36
0.34
0.32
0.30
0.28
0.26
Change
0.35
2009
-0.08
Depletion
0.14
Model
change
0.00
New
ounces
from
projects
0.00
Scope
change
0.39
2010
-0.00
Change in
Economics
-0.01
Other
background image
P
182
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Serra Grande
Brazil
Serra Grande
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
Serra Grande
Category
million
g/t
Tonnes
Moz
Mina Nova
Proved
0.94
3.19
3.00
0.10
Probable                                     0.21
2.80
0.60
0.02
Total                                          1.16
3.12
3.60
0.12
Mina III
Proved
0.49
3.84
1.88
0.06
Probable                                     0.43
4.01
1.74
0.06
Total                                          0.92
3.92
3.62
0.12
Palmeiras
Proved                                       0.04
2.51
0.11
0.00
Probable                                     0.14
4.58
0.66
0.02
Total                                          0.19
4.10
0.77
0.02
Pequizao
Proved                                          
Probable                                     0.26
6.74
1.74
0.06
Total                                          0.26
6.74
1.74
0.06
Open pit
Proved
0.46
3.56
1.65
0.05
Probable                                     0.27
2.71
0.73
0.02
Total                                          0.73
3.25
2.37
0.08
Total stockpiles
Proved
0.03
2.83
0.08
0.00
Probable                                         
Total                                           0.03
2.83
0.08
0.00
Serra Grande
Total
3.28
3.71
12.18
0.39
Inferred Mineral Resource in business plan
The Inferred Mineral Resources was used in the optimisation process with LOM level 3, but there are no Inferred Mineral Resources
in levels 1 and 2a.
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
Gold
change
value
Dilution
Serra Grande
price
rate
g/t Au
(%)
MCF%
MetRF%
Mina III
850
1.70
1.79
9
95
94.90
Mina Nova
850
1.70
1.79
                 95
90.90
Palmeiras
850
1.70
1.79                     6
95
94.60
Pequizao
850
1.70
1.79
12
95             94.60
Open pit
850
1.70
1.00
5
95
92.90
Total stockpiles
850
1.70
1.00
background image
P
183
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Edijarbas Martins Araujo
AusIMM
224825
30 years
Ore Reserve
Edijarbas Martins Araujo
AusIMM
224825
30 years
Serra Grande
– surface (metric)
Tonnes above 
cut-off (millions)
1.0
4.5
Average grade 
above cut-off (g/t)
1.5
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
8.5
8.0
7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
3.5
3.0
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
2.5
3.5
3.0
2.0
4.0
Serra Grande
– underground (metric)
Tonnes above 
cut-off (millions)
1
10
Average grade
above cut-off (g/t)
4
6
5
4
3
2
1
0
15
14
13
12
10
9
8
7
6
5
4
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
6
8
7
5
9
3
2
background image
P
184
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Colombia
Country overview
Systematic regional greenfield exploration was undertaken by AngloGold Ashanti and its joint venture partners B2Gold, Glencore
International and Mineros S.A. in Colombia. AngloGold Ashanti has consolidated the tenement position from roughly 100,000km2 in
2009 to 15,815km2 at the end of 2010 through a variety of structures, including joint ventures and the relinquishment of non-
prospective areas.
At the wholly-owned La Colosa project, brownfield-exploration-led drilling and pre-feasibility development resumed during the third
quarter of 2010. AngloGold Ashanti secured regional opportunities surrounding La Colosa and exploration of the greater La Colosa
area is continuing with the objective of discovering and quantifying similar gold-rich porphyry mineralisation styles.
At Gramalote (51% AngloGold Ashanti, 49% B2Gold), the joint venture partners renegotiated their agreement, resulting in AngloGold
Ashanti assuming management of the project via a designated brownfield-exploration-led project feasibility study team. Feasibility
drilling began during the last quarter of 2010, after a hiatus of more than 12 months.
Mineral Resource estimation
Gramalote
At Gramalote, some 12,551m of drilling (43 holes) have been used to support the calculation of an Inferred and Indicated Mineral
Resource. The Mineral Resource estimate was generated using an indicator kriging method. All available geological drill-hole, surface
and underground mapping information has been validated for use in the modelling process.
La Colosa
At La Colosa, some 17,039m of drilling (59 holes) have been used to support the calculation of an Inferred Mineral Resource. Gold
grades were estimated using ordinary block kriging methodology. Kriging was performed into a parent block size of 50m by 50m by
10m for lithological domains (wireframes) in the mineralised envelope and for the waste surrounding mineralisation. All available
geological drill-hole, surface sampling and mapping information has been validated for use in the modelling process.
Colombia
background image
P
185
Colombia
Gramalote
Location
The Gramalote project is located in Colombia on the eastern side of the Central Cordillera, some 80km northeast of Medellin and
230km northwest of Bogota.
The Gramalote project is a joint venture with Vancouver-based B2Gold, in which AngloGold Ashanti owns 51% and B2Gold owns
49%. B2Gold is required to take the project to feasibility to obtain an additional 2%. In November 2010 AngloGold Ashanti realised
net proceeds of C$70 million from the sale of its 10.17% shareholding in B2Gold. Proceeds from the sale will be used to fund
AngloGold Ashanti’s exploration activities in Colombia, including the Gramalote project.
Geology
Mineralisation is hosted in the Antioquia batholith and bears a strong relationship to Cretaceous–Palaeocene magmatic-hydrothermal
pulses. Hornblende granodiorites (87Ma) and porphyritic dykes (74Ma) constitute the older sub-regional host. Biotitic tonalites and
granodiorites (60Ma) are intimately associated with Gramalote-style mineralisation.
The sub-regional control of drill targets is defined by several dextral extensional shear zones that are orientated north-west to
south-east to north-north-west to south-east-east. Hydrothermal alteration is restricted to structurally controlled veins and veinlets.
The four principal alteration styles are potassic K-feldspar, quartz-sericite, sericite-carbonate and carbonate-epidote-chlorite. The
integration of borehole results with mapped hydrothermal alteration domains confirms the strong relationship between the
K-feldspar alteration, gold grades and preferred structural orientation.
The alteration envelope forms an area of some 600 x 200m along a north 65˚ east axis made up by structurally controlled alteration
domains. Consistent gold grades of >0.7 g/t gold have been located within an area of 400 x 150m.
Exploration
The upside potential of Gramalote is considered to be in the order of 1Moz. Several satellite orebodies are under investigation and
the grade of these is similar to the main Gramalote deposit.
The Trinidad satellite deposit is located some 4km west-north-west of the main Gramalote area. The prospect is related to a set of
sub-vertical, north-east/south-west striking structural corridors. The hydrothermal domains are 7 to 50m wide and separated by
between 40 and over 70m. They are dominantly quartz-sericite (less Potassic Feldspar) zones of alterations and occur over lengths
of more than 200m.
The Guadalejo mineral occurrence is located some 34km north-west-west of the main Gramalote prospect. The structural corridor
is some 900m long by 200m wide. The central core (200 x 130m) averages 3.5g/t gold in surface sampling. Lithology and alteration
domains are similar to the main Gramalote area. Mineralisation is hosted in potassically altered biotite-rich tonalites. North-east to
south-west striking veins and veinlets are developed in extension zones of north-east-east to south-west-west lineaments.
The Las Monjas deposit occurs some 2.5km west-south-west of the main Gramalote area. This geochemically anomalous area
covers an area of some 600 x 400m. Partially exposed but coherent quartz-sericite alteration is exposed an area of some 125 x 170m
and transition to a K-feldspar core is possible at depth. The structural corridors strike north-north-west to south-south-east.
background image
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
Gramalote
Category
million
g/t
Tonnes
Moz
Main zone
Measured
Indicated                                   15.78
0.93
14.75
0.47
Inferred                                    21.95
0.87
19.03
0.61
Total                                        37.73
0.90
33.78
1.09
Gramalote
Total                                        37.73
0.90
33.78
1.09
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
Gramalote
Measured
Indicated
30 x 30
2 different drill directions: W-E, SW-NE
Inferred
50 x 50
2 different drill directions: W-E, SW-NE
Exclusive Mineral Resource
The Exclusive and Inclusive Mineral Resource numbers are currently identical due to the absence of Ore Reserves.
P
186
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – Gramalote
Colombia
Gramalote
Gramalote
– surface (metric)
Tonnes above 
cut-off (millions)
0
1.4
Average grade 
above cut-off (g/t)
0.6
0.4
0.2
100
90
80
70
60
50
40
30
20
10
0
2.4
2.2
2.0
1.8
1.6
1.4
1.2
1.0
0.8
0.6
0.4
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
0.8
1.2
1.0
1.6
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Rudolf Jahoda
AusIMM
990544
21 years
Gramalote:
Mineral Resource reconciliation
2009 vs 2010
Ounces
 (millions)
1.10
1.08
1.06
1.04
1.02
1.00
0.98
0.96
Change
1.09
2009
0.00
Depletion
0.00
Gold
price
0.00
Explo-
ration
0.00
Metho-
dology
1.09
2010
0.00
Cost
0.00
Other
background image
P
187
Colombia
La Colosa
Locality
La Colosa was discovered by AngloGold Ashanti’s Colombian greenfields exploration team in 2006. The project is 100% owned by
AngloGold Ashanti and located 150km west of Colombia’s capital city, Bogota, and 30km west of the major town, Ibague, in the
department of Tolima.
Geology
The La Colosa copper-poor porphyry gold system is genetically associated with Miocene (8Ma) porphyritic intrusive centres intruded
into Paleozoic schists. The highest grade gold mineralisation is closely associated with a suite of early porphyry intrusions/breccias
with potassic and sodic-calcic alteration, 5% pyrite and traces of chalcopyrite and molybdenite.
The early porphyry stage can be divided into three phases and is elliptical in shape with a known maximum axis of at least 1,200m
and a minimum east-west axis of 400m.
The late-mineral dacite porphyry occurs as a series of dykes, all <40m in thickness but showing continuity over at least 600 vertical
metres. These dykes are assumed to be lateral offshoots of a ~1km2 mapped body of dacite porphyry occurring in the north-eastern
corner.
Alteration and mineralisation
The paragenesis of the main alteration or mineralisation mineral assemblage starts with pervasive sodic-calcic alteration overprinted
by potassic alteration and in turn, cut by a sodic-calcic event. Potassic alteration, biotite and subordinate K-feldspar, occurs mainly
as a pervasive replacement of the porphyries, especially the early phases. Early hydrothermal biotite is fine grained and commonly
pale brown suggesting the addition of phlogopitic (magnesium-rich) biotite. The second sodic-calcic alteration clearly overprints the
potassic assemblage and is largely confined to irregular, centimetre-scale patches and well defined veinlets. The patches and veinlets
contain epidote, actinolite and chlorite, typically with white, “albite-rich” haloes. Intermediate argillic and sericitic alteration are only
weakly developed and only form mappable zones in the dacite and in the northern limit of the deposit.
The three early porphyries appear to have been altered and mineralised at the same time. There is scant evidence for veinlet
introduction between the three intrusive events. The gold content of the three early porphyry phases is similar.
The veinlets at Colosa appear to span the potassic to sodic-calcic alteration events. The earliest veinlets are composed of only biotite.
However, most early veinlet generations are composed of quartz, magnetite, pyrite, pyrrhotite plus minor chalcopyrite and
molybdenite. The veinlets may be either quartz or magnetite dominated.
The main control of gold grade in the diorite or dacite intrusive stock is the intrusive phase where the mineralisation is hosted.
Early intrusive phases present the highest and more consistent gold grade (average >1.1g/t). The inter-mineral diorite has average
gold grades less than 0.7g/t, the late dacite phase generally only has >0.3g/t gold grades close to the contact with early
diorite phases.
The Ca-Na and K alteration with or without chloritic alteration have the best gold grades. Areas with intense illite alteration generally
have average gold grades less than 0.3ppm. The contact breccias and hornfels developed at the contact between porphyritic rock
and schist present a mineralised halo of at least 60m with an average gold grade of >1g/t.
background image
P
188
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – La Colosa
Colombia
La Colosa
Gold deportment
Gold grains vary from almost pure gold to a much lesser amount of gold-silver telluride. The chemical composition of Au-Ag-Te grains
is variable. The gold grains are generally fine grained around 15μm. Coarse grained gold (116μm) was found in samples from
metamorphic rocks. Gold grains occur both liberated and ‘locked’ in sulphides and silicates. A significant amount of gold is
associated with silicates such as K-feldspar and plagioclase. Sulphide minerals associated with gold are dominantly pyrite and
contain lesser amounts of pyrrhotite and arsenopyrite.
Mineral Resource Estimation
At La Colosa, some 17,039m of drilling (59 holes) has been used to support the estimation of the Inferred Mineral Resource.
Gold grades were estimated using ordinary block kriging methodology. Kriging was performed into a parent block size of 50m (X) by
50m (Y) by 10m (Z) for lithological domains (wireframes) in the mineralised envelope and for the waste surrounding mineralisation.
All available geological drill-hole, surface sampling and mapping information has been validated for use in the modelling process.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
La Colosa
Category
million
g/t
Tonnes
Moz
Open pit
Measured
Indicated                                         
Inferred                                   392.11
0.99
387.03
12.44
Total                                       392.11
0.99
387.03
12.44
La Colosa
Total
392.11
0.99
387.03
12.44
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
La Colosa
Measured
Indicated
Inferred
100 x 100
Plus additional geological drill-holes at
different spacing and different angles,
HQ-NQ
Exclusive Mineral Resource
The Exclusive and Inclusive Mineral Resource numbers are currently identical due to the absence of Ore Reserves.
background image
P
189
La Colosa:
Mineral Resource reconciliation
2009 vs 2010
Ounces 
(millions)
12.46
12.44
12.42
12.40
12.38
12.36
12.32
12.30
Change
12.32
2009
0.00
Depletion
0.00
Gold
price
0.00
Explo-
ration
0.00
Metho-
dology
12.44
2010
0.00
Cost
0.13
Other
La Colosa
– surface (metric)
Tonnes above 
cut-off (millions)
0.0
2.5
Average grade
above cut-off (g/t)
700
600
500
400
300
200
100
0
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
0.5
1.5
1.0
2.0
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Rudolf Jahoda
AusIMM
990544
21 years
background image
P
190
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – United States of America
United States of America
Country overview
In March 1999 AngloGold Ashanti acquired the Pikes Peak Mining Company, and its interests in the Cripple Creek & Victor Gold
Mining Company (CC&V) and the Jerritt Canyon joint ventures. Due to the merger of Golden Cycle Gold Corporation into a wholly-
owned subsidiary of AngloGold Ashanti effective July 1, 2008, CC&V became an indirect, wholly-owned joint venture of AngloGold
Ashanti Limited.
CC&V currently controls over 85% of the patented claims within the district and 100% of the land containing the 2010 Mineral
Resource. The Ore Reserve and Mineral Resource are stated at 100% ownership basis, although portions of the Ore Reserve are
subject to third party royalties that vary according to individual agreements with the underlying property owner.
Mineral Resource estimation
A single unified Mineral Resource model has been developed for the entire district. The unified model encompasses all known
deposits and drilling within the CC&V property. The estimation method is multiple indicator kriging and the primary variable estimated
is the recoverable gold.
An estimated iron and oxide model is utilised to interpolate block specific coefficients for input into the metallurgical recovery function.
The method for calculating nominal shake leach values is a regression technique using geologically logged categorical variables. The
modelling software used is MineSight® and updated drill-hole information is used throughout. The drill-hole database is thoroughly
reviewed before each Mineral Resource estimation and the estimation domains are based on lithology and structural domains for
each deposit.
Ore Reserve estimation
The Ore Reserve pit designs were based on LG optimisations of the Mineral Resource model. The LG algorithm applies economic
values to individual blocks and then generates a pit shell based on geotechnical constraints. Successive nested shells are generated
until the economic limits of the pit are established. These shells are then used as a template for final mine design. Pit slope designs
for all deposits were based on geotechnical studies and range between 32° and 57°. All pits were designed using a 10.7m bench
height except South Cresson, which utilises 6.1m.
background image
P
191
United States of America
CC&V
Location
The Cripple Creek and Victor (CC&V) located in central Colorado in the USA, approximately 25km east of Colorado Springs. The
mining district is located between the communities of Cripple Creek, to the northwest, and Victor, in the south. CC&V currently
controls over 85% of the patented claims within the district and 100% of the land within the year-end 2010 Mineral Resource.
Geology
The dominant geological feature of the district is a 32Ma to 28Ma diatreme-intrusive complex hosted in Precambrian rocks located
between the towns of Cripple Creek and Victor. The diatreme-intrusive complex is 6.4km long, 3.2km wide and consists of diatremal
breccia that has been intruded by stocks, dykes and discordant breccias. Diatremal breccia lithologies include breccias composed
exclusively of volcanic, Precambrian or sedimentary material or any combination of the three. Early intrusions are predominantly within
these alkaline phonolite-phonotephrite series of rocks and were followed by later lamprophyres. All rocks have undergone a complex
history of structural deformation and hydrothermal alteration. Gold mineralisation, dated between 27.8Ma and 26.6Ma, is hosted in
all rock types as veins. The mineralisation can also be disseminated or can occur in structurally-controlled orebodies. Primary ore
minerals include microscopic native gold, native gold with pyrite and gold tellurides. Silver is present but has minimal economic
importance.
Exploration
The 2010 exploration programme was divided into two programmes as follows:
converting low-grade tonnes from Inferred Mineral Resource into Measured and Indicated Mineral Resource by increasing the level
of confidence in Mineral Resource tonnes focussed on the north-end of the district in the WHEX and Globe Hill areas; and
testing and defining high-grade zones that, if they could be selectively mined through open pit mining operations, might support
a plant scenario. The drilling for the high-grade targets took place in several areas, including South Cresson, Cresson, WHEX and
North Cresson.
Projects
The largest project at CC&V is the Mine Life Extension-2 project (MLE-2), designed to extend the mine life from 2016 to 2026.
The project is looking at the possibility of an additional 190t leach pad with a plant that would process higher-grade material
selectively mined from the open pit operations.
Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
CC&V
Category
million
g/t
Tonnes
Moz
CC&V
Measured                               283.04
0.78
221.76
7.13
Indicated                                216.53
0.73
157.18
5.05
Inferred                                   79.61
0.75
59.66
1.92
CC&V
Total                                      579.18
0.76
438.60
14.10
background image
P
192
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – CC&V
United States of America
CC&V
Details of average drill-hole spacing and type in relation to Mineral Resource classification
Type of drilling
Mine/ Spacing
Blast-
Project
Category
m (- x -)
Diamond
RC
hole     Other
Comments
CC&V
Measured
30 x 30
Indicated
45 x 45
Inferred
75 x 75
Grade control     5 x 5, 5 x 6
Exclusive Mineral Resource
The Exclusive Mineral Resource at CC&V totals 343Mt, containing 8.20Moz of gold. This material lies immediately outside the
designed pit shells that hold the Ore Reserve. The ore zones are generally extensions of those seen in the Ore Reserve shells and
some of these tonnes will convert to Ore Reserve with infill drilling.
Exclusive Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
CC&V
Category
million
g/t
Tonnes
Moz
Measured                               135.85
0.75
102.38
3.29
Indicated                               137.77
0.71
98.42
3.16
Inferred                                  69.52
0.77
53.85
1.73
CC&V
Total                                    343.14
0.74
254.66
8.19
CC&V:
Mineral Resource reconciliation
2009 vs 2010
Ounces 
(millions)
14.4
14.2
14.0
13.8
13.6
13.4
13.2
Change
13.74
2009
-0.48
Depletion
0.72
Gold
price
0.34
Explo-
ration
-0.95
Metho-
dology
14.10
2010
-0.04
Cost
0.78
Other
CC&V:
Ore Reserve reconciliation
2009 vs 2010
Ounces
 (millions)
5.8
5.6
5.4
5.2
5.0
4.8
4.6
4.4
4.2
4.0
3.8
3.6
Change
4.29
2009
-0.48
Depletion
0.05
Model
change
1.87
New
ounces
from
projects
0.00
Scope
change
5.73
2010
0.00
Change in
Economics
0.00
Other
background image
P
193
Ore Reserve
as at 31 December 2010
Tonnes
Grade
Contained gold
CC&V
Category
million
g/t
Tonnes
Moz
Cresson
Proved                                    75.87
0.80
60.35
1.94
Probable                                  41.99
0.77
32.39
1.04
Total                                     117.86
0.79
92.74
2.98
South Cresson
Proved
14.74
0.91
13.45
0.43
Probable                                     4.61
0.92
4.22
0.14
Total                                        19.35
0.91
17.66
0.57
Wild Horse Extension
Proved
18.58
1.30
24.08
0.77
Probable
9.94                         1.08
10.74                        0.35
Total                                        28.52
1.22
34.82
1.12
Globe Hill
Proved
26.46
0.53
14.06
0.45
Probable                                   18.95
0.50
9.55
0.31
Total                                        45.41
0.52
23.61
0.76
Schist Island
Proved
11.54
0.64
7.44
0.24
Probable                                    3.27
0.57
1.86
0.06
Total
14.81
0.63                         9.30                        0.30
CC&V
Total
225.95
0.79                      178.13
5.73
Inferred Mineral Resource in business plan
The total amount of Inferred Mineral Resource within the Ore Reserve design is 10Mt, containing 0.19Moz of gold. This is
approximately 4.5% of the Proved and Probable Ore Reserve tonnes and 3.3% of the Proved and Probable Ore Reserve of gold.
The Inferred Mineral Resource is not used in the optimisation process for the Ore Reserve shells. The Inferred Mineral Resource
tonnes are generally located near the surface of pits that have not yet been mined. Some of this material is also found at the bottom
of the Ore Reserve pits where the drill density is not as quite as uniform as it is in other areas.
Inferred Mineral Resource
as at 31 December 2010
Tonnes
Grade
Contained gold
CC&V
million
g/t
Tonnes
Moz
Comments
Cresson
3.77
0.63
2.37
0.08
South Cresson
0.48
0.94
0.45
0.01
Wild Horse Extension
1.23
0.56
0.68
0.02
Globe Hill
4.39
0.50
2.21
0.07
Schist Island
0.22
0.45
0.10
0.00
Total
10.09
0.58
5.81
0.19
background image
P
194
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Americas – CC&V
United States of America
CC&V
Ore Reserve modifying factors
as at 31 December 2010
Ex-
Cut-off
% RRF
% RRF
% MRF
% MRF
Gold
change
value
(based on
(based
(based on
(based
Serra Grande
price
rate
g/t Au
tonnes)
on g/t)
tonnes)
on g/t)
CC&V – stockpiles
Pits
850
1.00
0.17
100
99
101
101
CC&V
– surface (metric)
Tonnes above 
cut-off (millions)
0.0
1.4
Average grade 
above cut-off (g/t)
0.6
0.4
0.2
700
600
500
400
300
200
100
0
-100
7
6
5
4
3
2
1
0
Cut-off grade (g/t)
Tonnes above cut-off
Ave grade above cut-off
0.8
1.2
1.0
background image
P
195
Competent persons
Professional
Registration
Relevant
Category
Name
organisation
number
experience
Mineral Resource
Tim Brown
AusIMM
226857
25 years
Ore Reserve
Jesse Gage
AusIMM
Former member
23 years
background image
P
196
AngloGold Ashanti Annual Financial Statements 2010
Definitions
Definitions
Mineral Resource
The JORC definition of a Mineral Resource is as follows:
A ‘Mineral Resource’ is a concentration or occurrence of material of intrinsic economic interest in or on the earth’s crust in
such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity,
grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific
geological evidence and knowledge. Mineral Resources are subdivided, in order of increasing geological confidence, into
Inferred, Indicated and Measured categories.
The Mineral Resource is estimated using all drilling and sampling information along with a detailed geological model. The geological
models are based on core logging, mapping, geophysics, geochemistry and geological understanding that have been developed for
each deposit. Most of the AngloGold Ashanti deposits have been the subject of research by world experts in the class of gold deposit.
The grade estimation for each deposit has been developed over the life of the mine and is constantly reviewed in terms of grade
control information and reconciliation with the metallurgical plant. In general, the deep South African mines utilise a process of
compound log normal macro kriging for the estimation of the Mineral Resource, while the open pits and shallow underground mines
generally use recoverable Mineral Resource models, estimated using uniform conditioning or multiple indicator kriging.
In order to comply with the economic requirement of the definition of Mineral Resource, all AngloGold Ashanti Mineral Resources are
constrained at an upside gold price, with all other parameters being kept the same as used for estimation of the Ore Reserve. In the
underground gold mines, scoping studies are conducted on all coherent blocks of ground that lie above the calculated Mineral
Resource cut-off. These studies include all cost and capital requirements to access the block. In the case of open pit operations, pit
optimisations are conducted at the Mineral Resource gold price and all material outside these shells is excluded from the Mineral
Resource, unless it is potentially mineable from underground.
It is the opinion of AngloGold Ashanti that the Mineral Resource represents a realistic view of an upside potential to the Ore Reserve.
In interpreting the Mineral Resource it is critical to factor in the following:
The Mineral Resource is quoted in situ and has not been corrected for dilution, mining losses or recovery.
The Mineral Resource includes a high percentage of Inferred material, which, following further exploration drilling may be converted
to an Indicated or Measured Mineral Resource.
Many of the areas lying in the exclusive Mineral Resource are currently being actively drilled and are the subject of economic and
technical studies. It can, however, not be assumed at this stage that the company has intent to mine these areas.
Mineral Resource classification is based on the '15% Rule'. A Measured Mineral Resource should be expected to be within 15% of
the quarterly metal estimate at least 90% of the time, while for an Indicated Mineral Resource estimate the annual metal estimate
should be within 15% of the metal estimated at least 90% of the time. For an Inferred Mineral Resource the annual error may for 90%
of the time, be greater than 15%.
background image
P
197
The process and methodology of classification are at the discretion of the competent person and involves expressing the '15% Rule'
as a required level of information, in tangible terms the spacing of the drill-hole or tunnel spacing in a particular deposit. Techniques
such as conditional simulation or even an empirical reconciliation-based approach are employed. However, all operations are
responsible for demonstrating, through reconciliation, that their classification system conforms to the 15% rule set out above.
AngloGold Ashanti quotes its Mineral Resource as inclusive of the Ore Reserve. However, in this document the exclusive Mineral
Resource is also quoted. The exclusive Mineral Resource is defined as the inclusive Mineral Resource less the Ore Reserve before
dilution and other factors are applied.
The exclusive Mineral Resource consists of the following components:
Inferred Mineral Resource within the optimised shell;
Other Inferred Mineral Resource;
Measured and Indicated Mineral Resource that lies between the life of mine (LOM) pit shell/mine design and the Mineral Resource
pit shell. This material will become economic if the gold price increases; and
Mineral Resource where the technical studies to engineer an Ore Reserve have not yet been completed.
Ore Reserve
The JORC definition of an Ore Reserve is as follows:
An ‘Ore Reserve’ is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting
materials and allowances for losses, which may occur when the material is mined. Appropriate assessments and studies
have been carried out, and include consideration of and modification by realistically assumed mining, metallurgical,
economic, marketing, legal, environmental, social and governmental factors. These assessments demonstrate at the time
of reporting that extraction could reasonably be justified. Ore Reserves are sub-divided in order of increasing confidence
into Probable Ore Reserves and Proved Ore Reserves.
In the underground operations, the Ore Reserve is based on a full mine design and in the case of open pits on a pit optimisation
followed by a final pit design. The Ore Reserve is reported according to tonnage, mean grade(s), and contained metal inclusive of
mining dilution, mining ore losses and mine call factors. These modifying factors are based on measurements, rather than estimates.
Tonnage and grade estimates for surface stockpile materials that meet Ore Reserve criteria are itemised separately.
Only the Ore Reserve included for treatment in the business unit plan production schedule is considered in the Ore Reserve
statement. These sometimes include marginal or sub-grade ores as well as the Inferred Mineral Resource. This Inferred Mineral
Resource is not included in the Ore Reserve statement.
For all new projects, an audited pre-feasibility (as a minimum requirement) must have been completed that demonstrates the viability
of the project and meets the company’s investment requirements. This study must be signed off at the appropriate executive level in
order to demonstrate an intent on the part of the company to proceed to feasibility and ultimately to implement the project.
background image
P
198
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Glossary of terms
All terms
BIF
Banded Ironstone Formation. A chemically formed iron-rich sedimentary rock.
By-products
Any products that emanate from the core process of producing gold, including silver, uranium and sulphuric acid.
Calc-silicate rock
A metamorphic rock consisting mainly of calcium-bearing silicates such as diopside and wollastonite, and formed by metamorphism
of impure limestone or dolomite.
Capital expenditure
Total capital expenditure on tangible assets which includes stay-in-business and project capital.
Carbon-in-leach (CIL)
Gold is leached from a slurry of gold ore with cyanide in agitated tanks and adsorbed on to carbon granules in the same circuit. The
carbon granules are separated from the slurry and treated in an elution circuit to remove the gold.
Carbon-in-pulp (CIP)
Gold is leached conventionally from a slurry of gold ore with cyanide in agitated tanks. The leached slurry then passes into the CIP
circuit where carbon granules are mixed with the slurry and gold is adsorbed on to the carbon. The granules are separated from the
slurry and treated in an elution circuit to remove the gold.
Comminution
Comminution is the crushing and grinding of ore to make gold available for treatment. (See also “Milling”).
Contained gold
The total gold content (tons multiplied by grade) of the material being described.
Cut-off grade – surface mines (COG)
The minimum grade at which a unit of ore will be mined to achieve the desired economic outcome.
Dense media separation (DMS)
Dense media separation (using high density liquids to separate ore).
Depletion
The decrease in quantity of ore in a deposit or property resulting from extraction or production.
Development
The process of accessing an orebody through shafts and/or tunnelling in underground mining operations.
Discontinued operation
A component of an entity that, pursuant to a single plan, has been disposed of or abandoned or is classified as held-for-sale until
conditions precedent to the sale have been fulfilled.
Glossary of terms
background image
P
199
Doré
Impure alloy of gold and silver produced at a mine to be refined to a higher purity, usually consisting of 85% gold on average.
Electro-winning
A process of recovering gold from solution by means of electrolytic chemical reaction into a form that can be smelted easily into
gold bars.
Elution
Recovery of the gold from the activated carbon into solution before zinc precipitation or electro-winning.
Full grade ore (FGO)
FGO is ore material with sufficient grade to carry the full operating cost. FGO cut-off is the break-even grade where cost is
representative of all costs to carry the full operation excluding direct mining cost.
Gold produced
Refined gold in a saleable form derived from the mining process.
Grade
The quantity of gold contained within a unit weight of gold-bearing material generally expressed in ounces per short ton of ore (oz/t),
or grams per metric tonne (g/t).
Leaching
Dissolution of gold from crushed or milled material, including reclaimed slime, prior to adsorption on to activated carbon.
Life of mine (LOM)
Number of years that the operation is planning to mine and treat ore, and is taken from the current mine plan.
Marginal ore (MO)
MO is ore material with grade below the FGO cut-off that can be economically treated at the end of mine life when overhead and
mining costs are reduced. MO cut-off is the break-even grade where cost is representative of the reduced cost that will be
experienced after mining has ended.
Metallurgical plant
A processing plant erected to treat ore and extract gold.
Milling
A process of reducing broken ore to a size at which concentrating can be undertaken. (See also “Comminution”)
Mine call factor (MCF)
The ratio, expressed as a percentage, of the total quantity of recovered and unrecovered mineral product after processing with the
amount estimated in the ore based on sampling. The ratio of contained gold delivered to the metallurgical plant divided by the
estimated contained gold of ore mined based on sampling.
Metallurgical recovery factor (MetRF)
A measure of the efficiency in extracting gold from the ore deposit.
background image
P
200
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Glossary of terms
Mineral deposit
A mineral deposit is a concentration (or occurrence) of material of possible economic interest in or on the Earth’s crust.
Mining reconciliation factor (MRF)
This is the variance between the gold called for as defined by the ore perimeters and what the processing plant receives. It is
expressed in both a grade and tonnage number.
Ounce (oz) (troy)
Used in imperial statistics. A kilogram is equal to 32.1507 ounces. A troy ounce is equal to 31.1035 grams.
Pay limit
The grade of a unit of ore at which the revenue from the recovered mineral content of the ore is equal to the total cash cost
including Ore Reserve Development and stay-in-business capital. This grade is expressed as an in-situ value in grams per
tonne or ounces per short ton (before dilution and mineral losses).
Precipitate
The solid product of chemical reaction by fluids such as the zinc precipitation referred to below.
Price received ($/oz and R/kg)
Attributable gold income including realised non-hedge derivatives divided by attributable ounces or kilograms sold.
Productivity
An expression of labour productivity based on the ratio of grams of gold produced per month to the total number of employees
in underground mining operations.
Reclamation
In the South African context, reclamation describes the process of reclaiming slimes (tailings) dumps using high-pressure
water cannons to form a slurry which is pumped back to the metallurgical plants for processing.
Recovered grade
The recovered mineral content per unit of ore treated.
Reef
A gold-bearing sedimentary horizon, normally a conglomerate band that may contain economic levels of gold.
Refining
The final purification process of a metal or mineral.
Region
Defines the operational management divisions within AngloGold Ashanti, namely South Africa, Argentina, Australia, Brazil,
Ghana, Guinea, Mali, Namibia, Tanzania and United States of America.
Rehabilitation
The process of reclaiming land disturbed by mining to allow an appropriate post-mining use. Rehabilitation standards are
defined by country-specific laws including, but not limited to the South African Department of Mineral Resources, the
US Bureau of Land Management, the US Forest Service, and the relevant Australian mining authorities, and address among
other issues, ground and surface water, topsoil, final slope gradient, waste handling and re-vegetation issues.
Glossary of terms
background image
P
201
Resource to Reserve reconciliation factor (RRF)
This is the variance between the resource model and the ore perimeters.
Seismic event
A sudden inelastic deformation within a given volume of rock that radiates detectable seismic energy.
Shaft
A vertical or subvertical excavation used for accessing an underground mine; for transporting personnel, equipment and
supplies; for hoisting ore and waste; for ventilation and utilities; and/or as an auxiliary exit.
Smelting
A pyro-metallurgical operation in which gold is further separated from impurities.
Stay-in-business capital
Capital expenditure to maintain existing production assets. This includes replacement of vehicles, plant and machinery,
ore reserve development and capital expenditure related to safety, health and the environment.
Stope
Underground excavation where the orebody is extracted.
Stoping
The process of excavating ore underground.
Stripping ratio
The ratio of waste tonnes to ore tonnes mined calculated as total tonnes mined less ore tonnes mined divided by ore
tonnes mined.
Tailings
Finely ground rock of low residual value from which valuable minerals have been extracted.
Tailings dam (slimes dam)
Dam facilities designed to store discarded tailings.
Tonne
Used in metric statistics. Equal to 1,000 kilograms.
Ton
Used in imperial statistics. Equal to 2,000 pounds. Referred to as a short ton.
Tonnage
Quantity of material measured in tonnes or tons.
Waste
Material that contains insufficient mineralisation for consideration for future treatment and, as such, is discarded.
background image
P
202
AngloGold Ashanti Mineral Resource and Ore Reserve Report 2010
Abbreviations
°
Degrees
$
United States dollars
ARS
Argentinean peso
A$ or AUD
Australian dollars
ADS
American Depositary Share
ADR
American Depositary Receipt
ASX
Australian Securities Exchange
Au
Contained gold
BRL
Brazilian real
capex
Capital expenditure
CLR
Carbon Leader Reef
DRC
Democratic Republic of the Congo
g
Grams
g/t
Grams per tonne
g/TEC
Grams per total employee costed
JORC
Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves
JSE
JSE Limited
kg
Kilograms
km
Kilometres
LIB
Long inclined borehole
LOM
Life of mine
LVB
Long vertical borehole
M or m
Metre or million, depending on the context
MCF
Mine Call Factor
MetRF
Metallurgical Recovery Factor
Moz
Million ounces
MRF
Mining Reconciliation Factor
Mt
Million tonnes or tons
Mtpa
Million tonnes/tons per annum
NPV
Net present value
oz
Ounces (troy)
oz/t
Ounces per ton
R or ZAR
South African rands
RRF
Resource to Reserve reconciliation factor
SAMREC
The South African Code for the Reporting of Exploration Results, Mineral Resources and
Mineral Reserves (the SAMREC Code)
t
Tons (short) or tonnes (metric)
tpm
Tonnes/tons per month
tpa
Tonnes/tons per annum
tpd
Tonnes/tons per day
VCR
Ventersdorp Contact Reef
VR
Vaal Reef
Abbreviations
background image
P
203
Administrative information
AngloGold Ashanti Limited
Registration No. 1944/017354/06
Incorporated in the Republic of South Africa
ISIN: ZAE000043485
Share codes:
JSE: ANG
LSE: AGD
NYSE: AU
ASX: AGG
GhSE (Shares):
AGA
GhSE (GhDS):
AAD
Euronext Paris:
VA
Euronext Brussels:
ANG
JSE Sponsor:
UBS
Auditors:
Ernst & Young Inc.
Offices
Registered and corporate
76 Jeppe Street
Newtown 2001
(PO Box 62117, Marshalltown 2107)
South Africa
Telephone: +27 11 637 6000
Fax: +27 11 637 6624
Australia
Level 13, St Martins Tower
44 St George’s Terrace
Perth, WA 6000
(PO Box Z5046, Perth WA 6831)
Australia
Telephone: +61 8 9425 4602
Fax: +61 8 9425 4662
Ghana
Gold House
Patrice Lumumba Road
(PO Box 2665)
Accra
Ghana
Telephone: +233 21 772190
Fax: +233 21 778155
United Kingdom Secretaries
St James’s Corporate Services Limited
6 St James’s Place
London SW1A 1NP
England
Telephone: +44 20 7499 3916
Fax: +44 20 7491 1989
E-mail: jane.kirton@corpserv.co.uk
Directors
Executive
M Cutifani** (Chief Executive Officer)
S Venkatakrishnan* (Chief Financial Officer)
Non-executive
TT Mboweni
(Chairman)
R Gasant
FB Arisman
#
WA Nairn
Prof LW Nkuhlu
F Ohene-Kena
+
SM Pityana
South African
* British
# American
** Australian + Ghanaian
Officers
Company Secretary: Ms L Eatwell
Investor Relations
South Africa
Michael Bedford
Telephone: +27 11 637 6273
Mobile: +27 82 374 8820
Fax: +27 11 637 6400
E-mail: mbedford@AngloGoldAshanti.com
United States
Stewart Bailey
Telephone: +1-212-836-4303
Mobile: +1 646 717-3978
E-mail: sbailey@AngloGoldAshanti.com
Share Registrars
South Africa
Computershare Investor Services (Pty) Limited
Ground Floor, 70 Marshall Street
Johannesburg 2001
(PO Box 61051, Marshalltown 2107)
South Africa
Telephone: 0861 100 950 (in SA)
Fax: +27 11 688 5218
web.queries@computershare.co.za
United Kingdom
Computershare Investor Services PLC
The Pavilions
Bridgwater Road
Bristol BS99 7NH
England
Telephone: +44 870 702 0000
Fax: +44 870 703 6119
Australia
Computershare Investor Services Pty Limited
Level 2, 45 St George’s Terrace
Perth, WA 6000
(GPO Box D182 Perth, WA 6840)
Australia
Telephone: +61 8 9323 2000
Telephone: 1300 55 2949 (in Australia)
Fax: +61 8 9323 2033
Ghana
NTHC Limited
Martco House
Off Kwame Nkrumah Avenue
PO Box K1A 9563 Airport
Accra
Ghana
Telephone: +233 302 229664
Fax: +233 302 229975
ADR Depositary
The Bank of New York Mellon (BoNY)
BNY Shareowner Services
PO Box 358016
Pittsburgh, PA 15252-8016
United States
Telephone: +1 800 522 6645 (Toll free in USA)
or +1 201 680 6578 (outside USA)
E-mail: shrrelations@mellon.com
Website:
www.bnymellon.com.com\shareowner
Global BuyDIRECTSM
BoNY maintains a direct share purchase
and dividend reinvestment plan for
AngloGold Ashanti.
Telephone: +1-888-BNY-ADRS
General e-mail enquiries
investors@AngloGoldAshanti.com
AngloGold Ashanti website
http://www.AngloGoldAshanti.com
Company secretarial E-mail
Companysecretary@AngloGoldAshanti.com
AngloGold Ashanti posts information that is
important to investors on the main page of its
website at www.AngloGoldAshanti.com and
under the “Investors” tab on the main page.
This information is updated regularly. Investors
should visit this website to obtain important
information about AngloGold Ashanti.
background image
Forward-looking statements
Certain statements contained in this document, including, without limitation,
those concerning AngloGold Ashanti Limited’s (AngloGold Ashanti) strategy
to reduce its gold hedging position, including the extent and effect of the
hedge reduction, the economic outlook for the gold mining industry,
expectations regarding gold prices, production, cash costs and other
operating results, growth prospects and outlook of AngloGold Ashanti’s
operations, individually or in the aggregate, including the completion and
commencement of commercial operations of certain of AngloGold Ashanti’s
exploration and production projects and completion of acquisitions and
dispositions, AngloGold Ashanti’s liquidity and capital resources and capital
expenditure, and the outcome and consequence of any pending litigation
proceedings, contain certain forward-looking statements regarding
AngloGold Ashanti’s operations, economic performance and financial
condition. Although AngloGold Ashanti believes that the expectations
reflected in such forward-looking statements are reasonable, no assurance
can be given that such expectations will prove to have been correct.
Accordingly, results could differ materially from those set out in the forward-
looking statements as a result of, amongst other factors, changes in
economic and market conditions, success of business and operating
initiatives, changes in the regulatory environment and other government
actions, fluctuations in gold prices and exchange rates, and business and
operational risk managements. For a discussion of such risk factors, refer to
the section titled “Risk management and internal controls” in the annual
financial statements. AngloGold Ashanti undertakes no obligation to update
publicly or release any revisions to these forward-looking statements to
reflect events or circumstances after the date of the annual financial
statements or to reflect the occurrence of unanticipated events. All
subsequent written or oral forward-looking statements attributable to
AngloGold Ashanti or any person acting on its behalf are qualified by the
cautionary statements herein.
background image
3996/10
background image
www.anglogoldashanti.com
AGA R&R_cover.indd 4
2011/03/29 9:25 AM
background image
SIGNATURES


Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly
caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
AngloGold Ashanti Limited
Date: March 31, 2011
By:
/s/ L Eatwell
Name:  L EATWELL
Title:     Company Secretary